Lot 1
No lot description published.
Buyer: UK Fusion Energy Ltd →
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. STEP is currently in its Concept Design phase, which is expected to be completed in 2026. The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants. These parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity. The highly dynamic nature of these loads could make compliance with grid code requirements challenging. For more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society UKIFS is seeking experts to support the technology selection of a central energy storage system (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters. Rather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant, and a CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection. Current assumptions are to exploit existing Battery Energy Storage Systems (BESS) to fulfil the energy storage needs. We are interested in all battery chemistries used in large-scale energy storage systems, including Lithium Iron Phosphate (LFP), Sodium-Sulfur (NaS), Lithium Titanate (LTO), Vanadium Redox Flow Batteries (VRFB), Nickel Manganese-Cobalt (MNC), Solid State Batteries or others. Due to knowledge gaps in BESS behaviour and limitations, the decision of using a BESS system for the CESS cannot be fully justified. This PME is looking to address this. The proposed technical and operational characteristics of the BESS are: 2 operational cycles per day Pulse length will be over 1 hour (continuous) Power range larger than 300MW Energy capacity 100-300MWh Response in the millisecond range Similar charge and discharge rates. Fast response time during power swings (full charge to discharge) High round trip efficiency: 80% In conjunction the BESS will be required to be operated and maintained for the 20-year life of the STEP machine. For more information about this opportunity, please visit the Delta eSourcing portal at: https://ukifs.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./44277P4UUB To respond to this opportunity, please click here: https://ukifs.delta-esourcing.com/respond/44277P4UUB
UK, GB
No lot description published.
| Item | Category | Quantity |
|---|---|---|
| 1 | Engineering design services, Electrical power systems design services, Plant engineering design services | Not published |
Benchmarked against retained Find a Tender procedures with CPV division 71. The category anchor is Engineering design services (71320000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.
| Comparison set | Procedures | Reported bids per procedure | Named award suppliers | Price evidence |
|---|---|---|---|---|
| Market: CPV division 71 | 4,023 | 3 median · 30.2 average (1,138 of 4,023 with a bid count) | 4 average (1,253 of 4,023 with named award suppliers) | Not published |
| Same buyer | 43 | Not published | Not published | Not published |
| Delivery region: UK | 922 | 3 median · 65.6 average (258 of 922 with a bid count) | 6.4 average (301 of 922 with named award suppliers) | Not published |
“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.
Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.
| Milestone | Type | Due | Status |
|---|---|---|---|
| A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. UKIFS is seeking experts to support the technology selection of a central energy storage system (CESS) that is part of the STEP Electrical infrastructure. To participate in this exercise, please complete and submit Appendix 1: Questionnaire and return any documents via the Delta portal. We are conscious of your time (and grateful to you for taking the time to complete the questionnaire), therefore we suggest you limit your responses to a maximum of 5 pages. If there are any areas you would like to expand on, please add a note to the relevant section for future discussion. If you experience any difficulties with the portal, please contact the portal helpdesk helpdesk@delta-esourcing.com cc operationalprocurement.step@ukifs.uk Information obtained from responses to Appendix 1: Questionnaire will help UKIFS understand current market capabilities and may shape the scope, direction, and design of the future procurement activities. If you have any questions about this Preliminary Market Engagement, please contact UKIFS through the Delta portal. We are keen to engage with suppliers to assist with the questionnaire if needed, to ensure quality responses enabling us to shape the future requirement and procurement. Following the submission and review of questionnaires, UKIFS intends to run an online conference call meeting/seminar/Q&A. The closing date for the pre-market engagement is Monday 23rd March 2026, 1 pm. | engagement | 23 Mar 2026 | scheduled |
No linked framework, prior procurement or reprocurement published.
Diagnostic view. “Not published” means this current release does not provide a value.
| OCID | ocds-h6vhtk-060f8e |
|---|---|
| Latest release ID | 007049-2026 |
| Latest release timestamp | Tue Jan 27 2026 12:05:55 GMT+0000 (Coordinated Universal Time) |
| Source | find-a-tender |
| Official notice URL | Not published |
| Tender status | planning |
| Procurement method | Not published |
| Procurement method details | Not published |
| Main procurement category | services |
| Above threshold | Yes |
| Legal basis | 2023/54 |
| Tender period: start | Not published |
| Tender period: end | Not published |
| Expression of interest deadline | Not published |
| Enquiry deadline | Not published |
| Award period: start | Not published |
| Award period: end | Not published |
| Submission method details | Not published |
| Submission languages | Not published |
| Electronic catalogue policy | Not published |
| Total tender value | £0 |
| Tender lots in source | 1 |
| Tender items in source | 1 |
| Tender documents in source | 0 |
| Awards in latest release | 0 |
| Contracts in latest release | 0 |
| Parties in latest release | 1 |
| Date | Event | Reference |
|---|---|---|
| 27 Jan 2026 | planning | 007049-2026 |
Unmodified official OCDS data retained by Tenderline for this procurement process.
{
"id": "007049-2026",
"tag": [
"planning"
],
"date": "2026-01-27T12:05:55Z",
"ocid": "ocds-h6vhtk-060f8e",
"buyer": {
"id": "GB-PPON-PCRM-7973-DCBL",
"name": "United Kingdom Industrial Fusion Solutions"
},
"tender": {
"id": "PP-UKIFS-527",
"lots": [
{
"id": "1",
"status": "planning",
"contractPeriod": {
"endDate": "2033-03-31T23:59:59+01:00",
"startDate": "2029-04-01T00:00:00+01:00"
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UK",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "71320000",
"scheme": "CPV",
"description": "Engineering design services"
},
{
"id": "71323100",
"scheme": "CPV",
"description": "Electrical power systems design services"
},
{
"id": "71323200",
"scheme": "CPV",
"description": "Plant engineering design services"
}
]
}
],
"title": "Large Scale Battery Energy Storage Systems",
"value": {
"currency": "GBP",
"amountGross": 0
},
"status": "planning",
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"description": "The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. \nSTEP is currently in its Concept Design phase, which is expected to be completed in 2026. \nThe electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: \nFusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants. \nThese parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity. \nThe highly dynamic nature of these loads could make compliance with grid code requirements challenging. \nFor more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society \nUKIFS is seeking experts to support the technology selection of a central energy storage system (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters. \nRather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant, and a CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection. Current assumptions are to exploit existing Battery Energy Storage Systems (BESS) to fulfil the energy storage needs. \nWe are interested in all battery chemistries used in large-scale energy storage systems, including Lithium Iron Phosphate (LFP), Sodium-Sulfur (NaS), Lithium Titanate (LTO), Vanadium Redox Flow Batteries (VRFB), Nickel Manganese-Cobalt (MNC), Solid State Batteries or others. \nDue to knowledge gaps in BESS behaviour and limitations, the decision of using a BESS system for the CESS cannot be fully justified. This PME is looking to address this. \nThe proposed technical and operational characteristics of the BESS are: \n2 operational cycles per day \nPulse length will be over 1 hour (continuous) \nPower range larger than 300MW \nEnergy capacity 100-300MWh \nResponse in the millisecond range \nSimilar charge and discharge rates. \nFast response time during power swings (full charge to discharge) \nHigh round trip efficiency: 80% \nIn conjunction the BESS will be required to be operated and maintained for the 20-year life of the STEP machine.\nFor more information about this opportunity, please visit the Delta eSourcing portal at: \nhttps://ukifs.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./44277P4UUB\nTo respond to this opportunity, please click here: \nhttps://ukifs.delta-esourcing.com/respond/44277P4UUB",
"aboveThreshold": true,
"mainProcurementCategory": "services"
},
"parties": [
{
"id": "GB-PPON-PCRM-7973-DCBL",
"name": "United Kingdom Industrial Fusion Solutions",
"roles": [
"buyer"
],
"address": {
"region": "UKJ14",
"country": "GB",
"locality": "Culham",
"postalCode": "OX14 3DB",
"countryName": "United Kingdom",
"streetAddress": "Culham Science Centre, Abingdon"
},
"details": {
"classifications": [
{
"id": "publicUndertaking",
"scheme": "UK_CA_TYPE",
"description": "Public undertaking"
}
]
},
"identifier": {
"id": "PCRM-7973-DCBL",
"scheme": "GB-PPON"
},
"contactPoint": {
"name": "Operational Procurement",
"email": "operationalprocurement.step@ukifs.uk"
}
}
],
"language": "en",
"planning": {
"documents": [
{
"id": "007049-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/007049-2026",
"format": "text/html",
"noticeType": "UK2",
"description": "Preliminary market engagement notice on Find a Tender",
"documentType": "marketEngagementNotice",
"datePublished": "2026-01-27T12:05:55Z"
}
],
"milestones": [
{
"id": "engagement",
"type": "engagement",
"status": "scheduled",
"dueDate": "2026-03-23T23:59:59+00:00",
"description": "A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. UKIFS is seeking experts to support the technology selection of a central energy storage system (CESS) that is part of the STEP Electrical infrastructure.\nTo participate in this exercise, please complete and submit Appendix 1: Questionnaire and return any documents via the Delta portal. We are conscious of your time (and grateful to you for taking the time to complete the questionnaire), therefore we suggest you limit your responses to a maximum of 5 pages. If there are any areas you would like to expand on, please add a note to the relevant section for future discussion. \nIf you experience any difficulties with the portal, please contact the portal helpdesk helpdesk@delta-esourcing.com cc operationalprocurement.step@ukifs.uk \nInformation obtained from responses to Appendix 1: Questionnaire will help UKIFS understand current market capabilities and may shape the scope, direction, and design of the future procurement activities. \nIf you have any questions about this Preliminary Market Engagement, please contact UKIFS through the Delta portal. We are keen to engage with suppliers to assist with the questionnaire if needed, to ensure quality responses enabling us to shape the future requirement and procurement. \nFollowing the submission and review of questionnaires, UKIFS intends to run an online conference call meeting/seminar/Q&A. The closing date for the pre-market engagement is Monday 23rd March 2026, 1 pm."
}
]
},
"initiationType": "tender"
}{
"id": "007049-2026",
"tag": [
"planning"
],
"date": "2026-01-27T12:05:55Z",
"ocid": "ocds-h6vhtk-060f8e",
"buyer": {
"id": "GB-PPON-PCRM-7973-DCBL",
"name": "United Kingdom Industrial Fusion Solutions"
},
"tender": {
"id": "PP-UKIFS-527",
"lots": [
{
"id": "1",
"status": "planning",
"contractPeriod": {
"endDate": "2033-03-31T23:59:59+01:00",
"startDate": "2029-04-01T00:00:00+01:00"
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UK",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "71320000",
"scheme": "CPV",
"description": "Engineering design services"
},
{
"id": "71323100",
"scheme": "CPV",
"description": "Electrical power systems design services"
},
{
"id": "71323200",
"scheme": "CPV",
"description": "Plant engineering design services"
}
]
}
],
"title": "Large Scale Battery Energy Storage Systems",
"value": {
"currency": "GBP",
"amountGross": 0
},
"status": "planning",
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"description": "The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. \nSTEP is currently in its Concept Design phase, which is expected to be completed in 2026. \nThe electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: \nFusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants. \nThese parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity. \nThe highly dynamic nature of these loads could make compliance with grid code requirements challenging. \nFor more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society \nUKIFS is seeking experts to support the technology selection of a central energy storage system (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters. \nRather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant, and a CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection. Current assumptions are to exploit existing Battery Energy Storage Systems (BESS) to fulfil the energy storage needs. \nWe are interested in all battery chemistries used in large-scale energy storage systems, including Lithium Iron Phosphate (LFP), Sodium-Sulfur (NaS), Lithium Titanate (LTO), Vanadium Redox Flow Batteries (VRFB), Nickel Manganese-Cobalt (MNC), Solid State Batteries or others. \nDue to knowledge gaps in BESS behaviour and limitations, the decision of using a BESS system for the CESS cannot be fully justified. This PME is looking to address this. \nThe proposed technical and operational characteristics of the BESS are: \n2 operational cycles per day \nPulse length will be over 1 hour (continuous) \nPower range larger than 300MW \nEnergy capacity 100-300MWh \nResponse in the millisecond range \nSimilar charge and discharge rates. \nFast response time during power swings (full charge to discharge) \nHigh round trip efficiency: 80% \nIn conjunction the BESS will be required to be operated and maintained for the 20-year life of the STEP machine.\nFor more information about this opportunity, please visit the Delta eSourcing portal at: \nhttps://ukifs.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./44277P4UUB\nTo respond to this opportunity, please click here: \nhttps://ukifs.delta-esourcing.com/respond/44277P4UUB",
"aboveThreshold": true,
"mainProcurementCategory": "services"
},
"parties": [
{
"id": "GB-PPON-PCRM-7973-DCBL",
"name": "United Kingdom Industrial Fusion Solutions",
"roles": [
"buyer"
],
"address": {
"region": "UKJ14",
"country": "GB",
"locality": "Culham",
"postalCode": "OX14 3DB",
"countryName": "United Kingdom",
"streetAddress": "Culham Science Centre, Abingdon"
},
"details": {
"classifications": [
{
"id": "publicUndertaking",
"scheme": "UK_CA_TYPE",
"description": "Public undertaking"
}
]
},
"identifier": {
"id": "PCRM-7973-DCBL",
"scheme": "GB-PPON"
},
"contactPoint": {
"name": "Operational Procurement",
"email": "operationalprocurement.step@ukifs.uk"
}
}
],
"language": "en",
"planning": {
"documents": [
{
"id": "007049-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/007049-2026",
"format": "text/html",
"noticeType": "UK2",
"description": "Preliminary market engagement notice on Find a Tender",
"documentType": "marketEngagementNotice",
"datePublished": "2026-01-27T12:05:55Z"
}
],
"milestones": [
{
"id": "engagement",
"type": "engagement",
"status": "scheduled",
"dueDate": "2026-03-23T23:59:59+00:00",
"description": "A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. UKIFS is seeking experts to support the technology selection of a central energy storage system (CESS) that is part of the STEP Electrical infrastructure.\nTo participate in this exercise, please complete and submit Appendix 1: Questionnaire and return any documents via the Delta portal. We are conscious of your time (and grateful to you for taking the time to complete the questionnaire), therefore we suggest you limit your responses to a maximum of 5 pages. If there are any areas you would like to expand on, please add a note to the relevant section for future discussion. \nIf you experience any difficulties with the portal, please contact the portal helpdesk helpdesk@delta-esourcing.com cc operationalprocurement.step@ukifs.uk \nInformation obtained from responses to Appendix 1: Questionnaire will help UKIFS understand current market capabilities and may shape the scope, direction, and design of the future procurement activities. \nIf you have any questions about this Preliminary Market Engagement, please contact UKIFS through the Delta portal. We are keen to engage with suppliers to assist with the questionnaire if needed, to ensure quality responses enabling us to shape the future requirement and procurement. \nFollowing the submission and review of questionnaires, UKIFS intends to run an online conference call meeting/seminar/Q&A. The closing date for the pre-market engagement is Monday 23rd March 2026, 1 pm."
}
]
},
"initiationType": "tender"
}