Landscaping Project Phase 1 at St Peters Garden
Authority: Chalfont St Peter Parish Council (Local council)
What is being bought
Published requirement descriptionTenders are invited from suitably experienced and capable contractors for Phase 1 of a fixed price project to improve the attractiveness, usefulness and maintainability of St Peter's Memorial Garden.
The Works comprise Development of a Public Amenity Area within a Closed Cemetery involving:
- Development of detailed design based upon outline drawings provided
- Clearance, topographical profiling, installation of electrical services (lighting), water services (maintenance), paths, fencing, creation of grassed, paved and planted areas in accordance with this document and approved contract proposals.
- Maintenance and repair to the extent described in this document
Full details are available on the Parish Council website www.chalfontstpeter-pc.gov.uk/2021/01/tender-appli… ↗
CPV: Landscape gardening services · Landscaping work for cemeteries
The lotProcurement structure
single lot · no lot value publishedLot #1Below is a abridged version of the tender document which can be found on the Parish…
Below is a abridged version of the tender document which can be found on the Parish Council website www.chalfontstpeter-pc.gov.uk/2021/01/tender-appli… ↗ please refer to the 22-02-21 St Peters Memorial Garden Tender Doc for full details.
Phase 1 will comprise work to the Zones 1 - 5 indicated on the Zone Index - DRG No 4 document.
A description of the works required is listed below, further details on preliminary & H&S requirements and specifications are within the 22-02-21 St Peters Garden Tender Document.
5.1 PRELIMINARIES
A Health & Safety - Comply with all relevant Health and Safety Legislation and the reasonable requirements of the Contract Administrator and work proactively to ensure the Project is delivered safely and without harm.
B Insurance - Provide contract insurances
C Develop detailed design proposals based upon the general form outlined in the Tender Documents and develop such proposals ready for approval for construction. Allow for attendance at up to 3 design review meetings and subsequent minor amendments to proposals. Provide detailed working drawings identifying trees for removal, new planting, construction details at perimeter etc.
D Provide, maintain and relocate security fencing and barriers
E Site Establishment - Provide and maintain toilet and welfare facilities to the reasonable satisfaction of the Contract Administrator, site office, stores, hard standings, temporary fencing and site security.
F Temporary services - Provide, maintain and adapt temporary services installations for the works
G Photographic Record - Provide a digital photographic record of the site before commencement and regularly as works progress. Record to include date taken and identify location within the site
H Preparatory Works - Take up existing paving, fencing etc. and where directed, set aside for re-use, clear site.
I Record Drawings - Provide digital drawings showing as-built construction details and including names and locations of new and existing species
J Maintenance Manual - Provide detail of recommended maintenance tasks for upkeep of the completed works
K Other matters: tenderer to describe any other Preliminary item and insert his price.
ZONE 1
Note: Works in Zone 1 comprise only the paved pathway and the border to the north. The area to the south, currently hoarded off, will be landscaped by others as part of the adjacent development.
A Dig out and remove all plants, shrubs, bushes and small trees from the area between the pathway and the existing fence. (Note: fence belongs to others). Remove all plant growth from the fence.
B Cut down and remove all mature and semi-mature trees (approximately 9 No) with the exception of the single cherry. Deal with stumps and roots.
C Provide and install cherry trees (anticipate 8No) to match those in Church Lane.
D Provisional Item. Provide and install cherry trees (anticipate 8No) on South side of path to complete works by others in adjacent development.
E Construct 225mm wide preserved timber sleeper dwarf retaining wall, including concrete footing, damp-proof membrane behind sleepers, dowelled joints etc. to provide mulch retention.
F Provide level formation 100 mm below top of wall, spray with appropriate herbicide, provide and install heavy duty membrane, provide and install 75mm thick mulch.
G Cut out existing damaged section of pathway surfacing and replace to match existing.
H Make good any damage to the pathway arising from carrying out the works.
I Other matters: tenderer to describe any other item of works to complete Zone 1 and insert his price
5.3 ZONE 2
A Dig out and remove all plants, shrubs, bushes and small trees from the area between the open area and the existing fence. (Note: fence belongs to others). Remove all plant growth from the fence.
B Cut down and remove all mature/semi mature trees (approximately 3No) with the exception of the large sycamore and the holly tree within the corner of Zones 2 and 3. Deal with stumps and roots.
C Provide and plant new spreading habit fir tree (approx. 2 m high) to replace that in corner with Zone 3
D Raise crown to approx. 5m, reduce spreading branches and top out to shape the large sycamore
E Trim and shape the holly tree within the corner of Zones 2 and 3
F Prepare and level ground to receive planting
G Provide and install suitable screening hedge - e.g. Photinia x fraseri 'Red Robin' - hedge plants along length of the fence 1.6 - 2m high
H Other matters: tenderer to describe any other item to complete
Zone 2 and insert his price. (Note: any new pathway and planting other than the screening hedge is to be priced within contractor's proposals for Zone 6)
5.4 ZONE 3
A Dig out and remove all plants, shrubs, bushes and small trees from the area between the open area and the existing wall. Remove all plant growth from the wall.
B Carefully remove all plant growth from memorial stones
C Cut down and remove all mature and semi mature trees (approximately 3 No) with the exception of the three large sycamores. Deal with stumps and roots.
D Raise crowns to approximately 5m, reduce spreading branches and top out to shape 3 No large sycamores
E Prepare and level ground to receive surface treatment between the wall and 300 mm past the line of the memorial stones.
F Spray between the wall and 300mm past the line of the memorial stones. with appropriate herbicide, provide and install heavy duty membrane, provide and install 75mm thick mulch
G Other matters: tenderer to describe any other item to complete Zone 3 and insert his price. (Note: any new pathway and planting beyond the line of the mulch treatment i.e. 300mm past the line of the memorial stones is to be priced within contractor's proposals for Zone 6)
5.5 ZONE 4
A Remove existing fence, leaving existing dwarf wall in position.
B Carefully lift stone paving and set aside for re-use
C Dig out and remove all plants, s…
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
The Contractor shall execute the works with all the skill and care to be expected of an experienced landscape designer and contractor and shall generally comply with recognised best practice documents.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Competitive procedure with negotiation
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 1 Feb 2021, 17:39 GMT
- Last source update
- 1 Feb 2021, 17:39 GMT
- FTS notice number
2021/S 000-001992- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-028f1eFind a Tender
- Electronic trading
- e-invoicing allowed
- Performance terms
The Contractor shall be responsible for delivering the Project within the Project Duration agreed with the Employer. There is no penalty for late completion but the Contractor shall use reasonable endeavours to complete the Project within the Project Duration.
The Contractor shall submit an outline programme for the Works with his tender and a rolling 4-week look ahead programme every week during the contract period and an update of the outline programme monthly.
The Contractor may decide his preferred sequence for the work taking account of all restrictions necessary to avoid harm to protected species and minimise damage to the ecology.
To enable appropriate comparison of tenders, all tenderers must fully complete the "Pricing Section" and "Form of Tender" as given. In selecting a preferred tenderer for the project, the Council will pay particular attention to both the Pricing Section (Section 5) and Contractors Proposals (Section 10), including their preliminary Health and Safety Plan, Method Statement and Programme proposals.
The Council will also keenly evaluate tenderers alternative proposals, as outlined in Section 11 - Alternative and Additional Proposals. These should not be carried into the "Form of Tender" but may be used in subsequent pre-contract development discussion.
Tenderers may be invited to present their approach to a post tender interview.
For further information or clarification, please contact the Contract Administrator Mr Bob Older BScEng (Hons) CEng, FICE, [email protected] or Mob: 0781 651 4868
- Review procedure
To enable appropriate comparison of tenders, all tenderers must fully complete the "Pricing Section" and "Form of Tender" as given. In selecting a preferred tenderer for the project, the Council will pay particular attention to both the Pricing Section (Section 5) and Contractors Proposals (Section 10), including their preliminary Health and Safety Plan, Method Statement and Programme proposals.
The Council will also keenly evaluate tenderers alternative proposals, as outlined in Section 11 - Alternative and Additional Proposals. These should not be carried into the "Form of Tender" but may be used in subsequent pre-contract development discussion.
Tenderers may be invited to present their approach to a post tender interview.
Tenders are to be delivered in a sealed envelope marked TENDER DOCUMENTS to Chalfont St Peter Parish Council offices NOT bearing any name or mark indicating the Tenderer's identity before noon on Friday 12th February 2021.
Publisher note: All relevant information is provided on the Chalfont St Peter website, this includes the full Tender document, maps of the area and proposed design and topographical information. This can be found on the following link https://www.chalfontstpeter-pc.gov.uk/2021/01/tender-application-landscaping-project-phase-1-at-st-peters-memorial-garden/
How it was run
Official notice- Submission deadline
- 22 Feb 2021, 12:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
Timeline
1 Feb 2021 → 22 Feb 2021 · 2 dates- Notice published1 Feb 2021, 17:39 GMT
- Submission deadline22 Feb 2021, 12:00 GMT
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria