J5 Reactive Power Compensation Compound Decommissioning

Official notice

Authority: United Kingdom Atomic Energy Authority

Works
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected 19 Sept 2023from the planned procurement notice

What is being bought

Published requirement description

JET Decommissioning and Repurposing

J5 Reactive Power Compensation Compound:

The J5 Reactive Power Compensation (RPC) compound, is a legacy facility located in the northern area of the Culham Science Campus. Operating from early 1990s to 2012 the purpose of the J5 RPC system (external compound and internal network) was to avoid causing disturbances to the 400kV National Grid supply as a result of large power pulses on site.

The RPC compound has been left in a quiescent state since it was disconnected from the Joint European Torus power supplies and mothballed.

The J5 RPC compound contains high voltage, low voltage, and extra low voltage electrical equipment including resistors, capacitors (624 high voltage oil filled capacitors to be exact), inductors, and surge arresters along with cable and busbar systems.

Please refer to attached documents for further details.

CPV: Demolition work · Demolition, site preparation and clearance work · Dismantling equipment · Dismantling works · Earthmoving work · Excavating and earthmoving work · Excavating work · Infill and land-reclamation work · Infill work · Non-hazardous refuse and waste treatment and disposal services · Radioactive-, toxic-, medical- and hazardous waste services · Site preparation and clearance work · +3 more

The lotProcurement structure

single lot · no lot value published
Lot #1Decommissioning and Repurposing:Planned

Decommissioning and Repurposing:

Under the agreement to host the JET machine, when JET finishes operations, the UK retains responsibility for decommissioning the machine and associated facilities. In 2022 the JET Decommissioning and Repurposing programme within UKAEA was set up to review the JET decommissioning plan and identify whether modern technologies and methodologies can be used to decommission smarter, quicker, cheaper, and safer. It was also decided to review alternative end of life scenarios to repurpose plant, equipment, and facilities thereby promoting sustainability and aiding other research and development programmes both domestically and internationally.

J5 Reactive Power Compensation Compound:

The J5 Reactive Power Compensation (RPC) compound, shown in Figure 1, is a legacy facility located in the northern area of the Culham Science Campus. Operating from early 1990s to 2012 the purpose of the J5 RPC system (external compound and internal network) was to avoid causing disturbances to the 400kV National Grid supply as a result of large power pulses on site.

The RPC compound has been left in a quiescent state since it was disconnected from the Joint European Torus power supplies and mothballed.

The J5 RPC compound contains high voltage, low voltage, and extra low voltage electrical equipment including resistors, capacitors (624 high voltage oil filled capacitors to be exact), inductors, and surge arresters along with cable and busbar systems.

Delivery: South East · UKAEA, Culham

Procedure terms & legal framework

From the official record
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
10 Jul 2023, 12:24 BST
Last source update
10 Jul 2023, 12:24 BST
Authority reference
T/KJ088/23
FTS notice number
2023/S 000-019612
Classification (CPV)
Demolition workDemolition, site preparation and clearance workDismantling equipmentDismantling worksEarthmoving workExcavating and earthmoving workExcavating workInfill and land-reclamation workInfill workNon-hazardous refuse and waste treatment and disposal services
+5 moreRadioactive-, toxic-, medical- and hazardous waste servicesSite preparation and clearance work
Delivery area
South East (UKJ14)
Official registry OCID
ocds-h6vhtk-03e035 Find a Tender

How it was run

Official notice
Submission deadline
—

Timeline

10 Jul 2023 → 19 Sept 2023 · 2 dates
  1. Notice published
    10 Jul 2023, 12:24 BST
  2. Tender notice expected
    19 Sept 2023, 00:00 BST

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

United Kingdom Atomic Energy Authority

Contracting authorityBody governed by public lawFusion Research N/A Culham Science Centre, Abingdon, South East, OX14 3DBContact name, email Published organisation website ↗

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.