Find a TenderClosedTender notice
Published 9 Oct 2026, 18:33 BST

Official UK procurement notice

ITT - Swindon Archive Decarbonisation Design Team (UID 320)

Official notice

Authority: Historic England (Central government)

ServicesCompetitive flexible procedureAbove thresholdScoring: Quality 70% · Price 30%
Sectors: Construction & Civil Engineering (45)Architecture & Engineering (71) Delivery: Delivery location not published
Published estimate£149,000£178,000 inc. VAT
Submissions closed 4 Nov 2026
Contract term 8 moends 30 Sept 2027 · up to 30 Aug 2028 with extensions · starts 28 Jan 2027

What is being bought

Published requirement description

Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3).

The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind.

The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity.

A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care.

Based on the information provided, Historic England's preferred option currently involves:

  • Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions.
  • Rationalisation of archive environmental zones to improve operational efficiency.
  • Fabric improvements to enhance thermal performance and airtightness.
  • Fire safety upgrades and associated building works.
  • Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth.

Scope of Services

The appointed design team will be required to lead the project through:

RIBA Stage 3 – Spatial Coordination

Including but not limited to:

  • Review and validation of the completed RIBA Stage 2 outputs.
  • Development of the preferred design solution.
  • Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions.
  • Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations.
  • Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design.
  • Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios.
  • Planning application preparation and submission.
  • Cost planning and value management exercises.
  • Development of a robust whole-life cost and carbon assessment.
  • Stakeholder engagement and workshop facilitation.
  • Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.

CPV: Architectural and related services · Architectural design services · Architectural, engineering and planning services · Engineering design services · Environmental engineering consultancy services · Environmental improvement works · Project and design preparation, estimation of costs

Open work like this

This notice no longer takes bids · live search, filters set

The lotProcurement structure

single lot · value published
Lot #1Renewal 8 moPublished value£149,000
Contract period: 28 Jan 2027 – 30 Sept 2027 (8 mo) · up to 30 Aug 2028 with extensionsValue: £149,000 exc. VAT · £178,000 inc. VAT
Extensions: RIBA stage 4 - we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3).

What it takes to win
i

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 70%Price: 30%
Published sub-criteria (2)
  • Quality: 70%
  • Pricing: 30%
Published award criteria (2)
  • Pricing: RIBA Stage 3 fixed price schedule RIBA Stage 3 Rate table RIBA Stage 4 Rate table
  • Quality: Quality 1 - Understanding of Project Objectives and Option Review Approach Quality 2 - Methodology for Option Validation, Design Development and Technical Delivery Quality 3 - Understanding of Archive Collection Requirements Quality 4 - Archive Collections and Environmental Risk Management Quality 5 - Relevant Experience and Lessons Learned Quality 6 - Cost Management and Buildability Quality 7 - Project Team and Resource Commitment Social Value 1 - Environmental stewardship, skills and wider benefit
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
9 Oct 2026, 18:33 BST
Last source update
9 Oct 2026, 18:33 BST
Award evaluation window
Submission end – 12 Jan 2027
Authority reference
P/REF 00000632
FTS notice number
2026/S 000-095864
Latest notice
Tender notice (UK4)
Classification (CPV)
Architectural and related servicesArchitectural design servicesArchitectural, engineering and planning servicesEngineering design servicesEnvironmental engineering consultancy servicesEnvironmental improvement worksProject and design preparation, estimation of costs
Delivery area
Not published
Official registry OCID
ocds-h6vhtk-078534 Find a Tender
How it runs

Stage 1 - Using Procurement Specific Questionnaire (Conditions of participation) to reduce the number of suppliers to be invited to submit final tenders. If supplier passes all Stage 1 questions, then they will be invited to participate to Stage 2.

Stage 2 - Invitation To Tender (ITT) - Quality and Pricing evaluation questions.

How it was run

Official notice
Run through: In-tend · Who buys & how to bid on In-tend
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · one account per buying organisation's portal · reCAPTCHA on signup
Requests to participate (first stage)
4 Nov 2026, 09:30 GMT
Submission deadline
4 Nov 2026, 09:30 GMT
Clarification deadline
28 Oct 2026, 17:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Please find further details of the project and submit any questions / submit your response to the procurement specific questionnaire (conditions of participation) via our free procurement portal : supplier.in-tend.co.uk/historicengland/home ↗

Please be aware at this Stage 1 (procurement specific questionnaire (conditions of participation)), we do not require a Tender returned. Only the stage 1 document.

Timeline

9 Oct 2026 → 28 Jan 2027 · 5 dates
  1. Tender notice published45 days ago
    9 Oct 2026, 18:33 BST
  2. Clarification questions by26 days ago
    28 Oct 2026, 17:00 GMT
  3. Submission deadline19 days ago
    4 Nov 2026, 09:30 GMT
  4. Today
    24 Nov 2026
  5. Award decision expected byin 49 days
    12 Jan 2027, 23:59 GMT
  6. Contract startsin 64 days
    28 Jan 2027

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    9 Oct 2026, 18:33 BST
    UK4

Contracting authority & participating public bodies

Historic England

Contracting authorityPublic authority - central government GB-PPON: PXLY-5862-RMML The Engine House, Swindon, South West, SN22EHContact email

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender