Find a Tender
complete
Official procurement procedure
ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
Construction work
Consultative engineering and construction services
Engineering design services
+3 more
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: THE PIRBRIGHT INSTITUTE: "ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | THE PIRBRIGHT INSTITUTE | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: THE PIRBRIGHT INSTITUTE
Market Analytics
Derived from OCDS awards & bid statistics
Published history for THE PIRBRIGHT INSTITUTE. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
2Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 1 active published awards; 1 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityTHE PIRBRIGHT INSTITUTE | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published21 Feb 2025, 15:12 GMT | Last source update21 Feb 2025, 15:12 GMT | Recurring procurementNot published |
ClassificationConstruction work, Consultative engineering and construction services, Engineering design services, Installation services of waste incinerators, Other miscellaneous construction materials, Waste incinerators | ||
Delivery area | ||
OCIDocds-h6vhtk-04994a | ||
What is being bought
Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers.
The scope of works will involve:
• Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation.
• Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops.
• Deconstruction of existing refractory lining and Anchors (Disposal of waste by others)
• Installation of the new anchors and refractory lining as per agreed detailed design.
• Management of drying out and curing of the lining.
• Management of all subcontractors employed by the supplier to complete these works.
• Submission of O&M containing all required details as per PIF and separate section to provide information needed for the Health and Safety File. Please see Contract Scope section in ITT document.
What changed
From the official release history
- tender value changed
21 Feb 2025, 15:12 GMT - Status changed to complete
21 Feb 2025, 15:12 GMT - Official notice release published
21 Feb 2025, 15:12 GMT - Submission deadline changed to published date
21 Feb 2025, 15:12 GMT - Published value updated to £405,000
9 Sept 2024, 15:15 BST - Status changed to active
9 Sept 2024, 15:15 BST - Official notice release published
9 Sept 2024, 15:15 BST - Submission deadline changed to 11 Oct 2024, 12:00 BST
9 Sept 2024, 15:15 BST - Buyer information updated
9 Sept 2024, 15:15 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedThe contract is for a single supplier to provide Design and Build of Work Package 5 - Incinerator Kiln Refractory Lining Upgrade to the Primary and Secondary Combustion Chambers, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF. The scope of this contract is to replace the Kiln Refractory Lining for the Primary and Secondary Incinerator Chambers to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years. The scope of works will involve: • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation. • Supply and delivery of all refractory materials and anchors. o This would include any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops. • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others) • Installation of the new anchors and refractory lining as per agreed detailed design. • Management of drying out and curing of the lining. • Management of all subcontractors employed by the supplier to complete these works. • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and a separate section which provides details of the following o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome. o Details on how the curing burners are set up and how the ventilation and ID fans are set up to draw away the heat. • As part of the works, the supplier should also provide the following: o Provision to ensure safe access and egress to confined spaces (Gas monitors, Rescue Personnel, Outside Watchman, etc) o All provisions for the deconstruction, installation and drying / curing of the refractory, including but not limited to: All necessary machinery and equipment required for the works. Provision of lighting in the individual plant sections. Provision of transport vehicles required for the works which is not listed as part of the CDM site below. Provision of weather protection for any equipment and materials used/stored outside. Air compressor and fuel. Extraction fans and filtration to minimise dust generation within area of works. All PPE required for safe working during all works. Equipment and fuel required for drying and curing of the refractory lining. Recommend diesel burner as gas would be difficult to arrange on site. A CDM Construction site will be set up as part of the overall project which will provide for the following: • Site Supervision • HERRAS fencing and appropriate signage around CDM area • Site Office • Welfare Office including changing areas • Waste skips • Scissor lift • Fork-lift truck / telehandler • CDM documentation / inductions / daily logs / management of RAMS Additional information: As part of the tender, the supplier is to provide option costs and timescales for the following: • Completion of both chambers within a single visit based on normal working hours only. • Completion of both chambers within a single visit based on normal and extended working hours. • Completion of both chambers over two visits (i.e. one chamber per visit) based on normal working hours only. • Completion of both chambers over two visits (i.e. one chamber per visit) based on normal and extended working hours.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
21 Feb 2025, 15:12 GMT - Award active
Not published · Not published - Contract active
Signed 9 Dec 2024, 00:00 GMT · £454,525
Commercial outcome and competition
Awards Fuel Conservation services Ltd Not published · Not published · active |
Contracts Contract £454,525 · signed 9 Dec 2024, 00:00 GMT · active |
Bid statistics bids: 2 (lot 1) |
Buyer and organisations in this procedure
THE PIRBRIGHT INSTITUTE
Contracting authority GB-COH-559784Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published