ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement

Official notice

Authority: THE PIRBRIGHT INSTITUTE (Public body)

GoodsOpen procedure
Published estimate£405,000≈ £374k / year12.2% above published estimate
Submissions closed 11 Oct 2024awarded 9 Dec 2024
Awarded to Fuel Conservation services Ltd
Contract term 1 yr 1 moends 31 Dec 2025 · starts 19 Nov 2024

What is being bought

Published requirement description

Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers.

The scope of works will involve:

  • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation.
  • Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops.
  • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others)
  • Installation of the new anchors and refractory lining as per agreed detailed design.
  • Management of drying out and curing of the lining.
  • Management of all subcontractors employed by the supplier to complete these works.
  • Submission of O&M containing all required details as per PIF and separate section to provide information needed for the Health and Safety File. Please see Contract Scope section in ITT document.

CPV: Construction work · Consultative engineering and construction services · Engineering design services · Installation services of waste incinerators · Other miscellaneous construction materials · Waste incinerators

The lotProcurement structure

single lot · no lot value published
Lot #1The contract is for a single supplier to provide Design and Build of Work Package 5 -…Awarded 1 yr 1 mo

The contract is for a single supplier to provide Design and Build of Work Package 5 - Incinerator Kiln Refractory Lining Upgrade to the Primary and Secondary Combustion Chambers, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF.

The scope of this contract is to replace the Kiln Refractory Lining for the Primary and Secondary Incinerator Chambers to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years.

The scope of works will involve:

  • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation.
  • Supply and delivery of all refractory materials and anchors.

o This would include any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops.

  • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others)
  • Installation of the new anchors and refractory lining as per agreed detailed design.
  • Management of drying out and curing of the lining.
  • Management of all subcontractors employed by the supplier to complete these works.
  • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and a separate section which provides details of the following

o Brief Description of the works being carried out.

o Project Risk Assessment.

o Key structural principals.

o Hazardous materials used.

o Information on the future removal of installed plant.

o H&S information about equipment provided for cleaning or maintaining installed plant.

o The nature, location and markings of significant services.

o Information and as built drawings of buildings, plant and equipment.

o Step by step activities to carry out the works.

o Lesson Learnt, challenges met and how they were overcome.

o Details on how the curing burners are set up and how the ventilation and ID fans are set up to draw away the heat.

  • As part of the works, the supplier should also provide the following:

o Provision to ensure safe access and egress to confined spaces (Gas monitors, Rescue Personnel, Outside Watchman, etc)

o All provisions for the deconstruction, installation and drying / curing of the refractory, including but not limited to:

 All necessary machinery and equipment required for the works.

 Provision of lighting in the individual plant sections.

 Provision of transport vehicles required for the works which is not listed as part of the CDM site below.

 Provision of weather protection for any equipment and materials used/stored outside.

 Air compressor and fuel.

 Extraction fans and filtration to minimise dust generation within area of works.

 All PPE required for safe working during all works.

 Equipment and fuel required for drying and curing of the refractory lining. Recommend diesel burner as gas would be difficult to arrange on site.

A CDM Construction site will be set up as part of the overall project which will provide for the following:

  • Site Supervision
  • HERRAS fencing and appropriate signage around CDM area
  • Site Office
  • Welfare Office including changing areas
  • Waste skips
  • Scissor lift
  • Fork-lift truck / telehandler
  • CDM documentation / inductions / daily logs / management of RAMS

Additional information:

As part of the tender, the supplier is to provide option costs and timescales for the following:

  • Completion of both chambers within a single visit based on normal working hours only.
  • Completion of both chambers within a single visit based on normal and extended working hours.
  • Completion of both chambers over two visits (i.e. one chamber per visit) based on normal working hours only.
  • Completion of both chambers over two visits (i.e. one chamber per visit) based on normal and extended working hours.
Contract period: 19 Nov 2024 – 31 Dec 2025 (1 yr 1 mo)
Delivery: South East
Variant bids: allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 50%Price: 50%
Published sub-criteria (3)
  • Technical/Quality Aspects: 50%
  • Price: 30%
  • Other Commercial Aspects: 20%
Published award criteria (3)
  • Technical/Quality Aspects: 50
  • Price: 30
  • Other Commercial Aspects: 20
What this means for your bid
  • Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
9 Sept 2024, 15:15 BST
Last source update
21 Feb 2025, 15:12 GMT
Award evaluation window
11 Oct 2024 – …
Authority reference
BC22-004
FTS notice number
2025/S 000-006885
Classification (CPV)
Construction workConsultative engineering and construction servicesEngineering design servicesInstallation services of waste incineratorsOther miscellaneous construction materialsWaste incinerators
Delivery area
South East (UKJ25)
Official registry OCID
ocds-h6vhtk-04994a Find a Tender

Publisher note: This requirement has also been advertised on Contracts Finder. https://www.contractsfinder.service.gov.uk/Notice/68f650ff-b91d-4efe-b3a2-4c0ec9c59c2b The ITT package can be found on Contracts Finder or on request from [email protected]. Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to [email protected] asap. Then and only then will access to the full ITT package (Appendix E1 - Site Documents, Appendix E2 - Incinerator Dimensions and Appendix E3 - Front Plate Technical Datasheets) be granted to the requester.

How it was run

Official notice
Run through: portal not identified
Language: EN
Submission deadline
11 Oct 2024, 12:00 BST
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Participation fee
document
Bid validity
180 days from the deadline
Bids opened
11 Oct 2024, 14:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

11 Oct 2024 → 21 Feb 2025 · 4 dates
  1. Submission deadline
    11 Oct 2024, 12:00 BST
  2. Bids opened
    11 Oct 2024, 14:00 BST
  3. Contract starts
    19 Nov 2024
  4. Notice published
    21 Feb 2025, 15:12 GMT

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    21 Feb 2025, 15:12 GMT

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £454,5251 contract exc. VAT
Bids received 2
Contracts signed 1latest 9 Dec 2024
Awarded toValueDateStatus
Fuel Conservation services Ltd£454,525 †—Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
2bids———

Contracting authority & participating public bodies

THE PIRBRIGHT INSTITUTE

Contracting authorityPublic bodyInstituteAnimal Research GB-COH: 559784 THE PIRBRIGHT INSTITUTE, WOKING, South East, GU240NFContact email Published organisation website ↗

Dispute resolution & review bodies

  • Institute of Chartered EngineersReview body London

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.