TenderlineUK
Procurement Intelligence
Official OCDS
Find a Tender
complete
Official procurement procedure

Immersive Studio Installation

Motion picture and video services
Simulators
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Coventry University: "Immersive Studio Installation". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityCoventry UniversityScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Coventry University
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Coventry University. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
4Bids / Report
0% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 8 active published awards; 1 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityCoventry University
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published23 Jun 2022, 13:55 BST
Last source update23 Jun 2022, 13:55 BST
Recurring procurementNot published
ClassificationMotion picture and video services, Simulators
OCIDocds-h6vhtk-0349d5
What is being bought
Coventry University seeks a sole supplier to deliver a project to 'fit-out' the Immersive studio spaces within the new Delia Derbyshire Building, as part of the FAH redevelopment project. This is a highly specialised supply and installation project requiring a high-degree of bespoke design, a particular specification, and project-service integration.
What changed
From the official release history
  1. Status changed to complete
    23 Jun 2022, 13:55 BST
  2. Official notice release published
    23 Jun 2022, 13:55 BST
  3. Buyer information updated
    23 Jun 2022, 13:55 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    Status not published
    Published valueNot published
    Coventry University seeks a sole supplier to deliver a project to 'fit-out' the Immersive studio spaces within the new Delia Derbyshire Building, as part of the FAH redevelopment project. This is a highly specialised supply and installation project requiring a high-degree of bespoke design, a particular specification, and project-service integration. Due to the technical complexity and the critical nature of the project, as well as the frequent cycles of technology re-fresh in this field, Faculty colleagues undertook a pre-market engagement some months ago seeking professional advice and guidance to establish a broad project requirement/specification for the complete delivery of a highly innovative Immersive studio capability in our new building. This high-level engagement made clear that one supplier: Gren Spencer / Wireframe Extended Reality, had by far the most comprehensive understanding of the parameters of the project requirement and provided the most credible proposal and the areas which needed to be developed further. The FAH Redevelopment Project team has had to continue to undertake the very significant pre-engagement activity with Gren Spencer / Wireframe Extended Reality, including user-case workshops and focus-groups, in order to develop the planned delivery of the technical solution, which is itself highly complex and defined within a number of constraints. This pre-engagement has required direct dialogue between Gren Spencer / Wireframe Extended Reality, the Faculty as end-users, and McLaughlin & Harvey the main project contractor, in order to resolve questions about the interaction between the building's physical infrastructure and the two immersive studio installations - e.g. the requirements for room-in-room sound-insulation and e.g. the relationship between the specialist servers for the studios, the buildings data network and the Digital Asset Management system. The sound proofing for immersive installation had to be designed in direct consultation between the main contractor, the project architects, and the identified supplier. The resulting proposed design solution has been worked-up with Gren Spencer / Wireframe Extended Reality and is a fully bespoke installation, which sits within the infrastructure of the building-space and its physical/ M&E and Data network parameters. The installations of the highly specialist, binaural sound and 360 AR/VR capture technologies need to interface precisely with the power and data infrastructure as it has been delivered by the main construction contractor. A major aspect of these bespoke designs is that whilst they use some generic components - they are custom solutions made to fit within the spaces and the M&E and Digital Data infrastructure, which has itself been specifically designed in collaboration with the main contractor. The collaboration that we have established with Gren Spencer / Wireframe Extended Reality has brought a high degree of added-value to the project, both in terms of the efficacy of the design proposal, which has been achieved because of their market-leading capability in design and supply of such systems; but also, the establishment of lines of communication and collaboration between them as the supplier, our estates project management team and the main redevelopment project contractors. As a result of the above Gren Spencer / Wireframe Extended Reality are able to meet the needs of this now highly specific project brief and provide the best available end-to-end solution and added-value to this critical project.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    23 Jun 2022, 13:55 BST
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 23 Jun 2022, 00:00 BST · Not published
Commercial outcome and competition
Awards
Wireframe Extended Reality
Not published · Not published · active
Contracts
Contract
Not published · signed 23 Jun 2022, 00:00 BST · active
Bid statistics
highestValidBidValue: 350000 (lot 1)
lowestValidBidValue: 250000 (lot 1)
Buyer and organisations in this procedure

Coventry University

Contracting authority GB-FTS-32803
View buyer profile
  • Coventry University
    buyer

    PRIORY STREET, COVENTRY, UKG33, CV15FB
    +44 7392096976
  • Coventry University
    reviewBody

    Coventry
  • Wireframe Extended Reality
    supplier

    lutterworth, UKF22
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published
Planning and rationale
Planning budgetNot published
No-engagement rationaleNot published
Procedure rationaleCoventry University seeks a sole supplier to deliver a project to 'fit-out' the Immersive studio spaces within the new Delia Derbyshire Building, as part of the FAH redevelopment project. This is a highly specialised supply and installation project requiring a high-degree of bespoke design, a particular specification, and project-service integration. Due to the technical complexity and the critical nature of the project, as well as the frequent cycles of technology re-fresh in this field, Faculty colleagues undertook a pre-market engagement some months ago seeking professional advice and guidance to establish a broad project requirement/specification for the complete delivery of a highly innovative Immersive studio capability in our new building. This high-level engagement made clear that one supplier: Gren Spencer / Wireframe Extended Reality, had by far the most comprehensive understanding of the parameters of the project requirement and provided the most credible proposal and the areas which needed to be developed further. The FAH Redevelopment Project team has had to continue to undertake the very significant pre-engagement activity with Gren Spencer / Wireframe Extended Reality, including user-case workshops and focus-groups, in order to develop the planned delivery of the technical solution, which is itself highly complex and defined within a number of constraints. This pre-engagement has required direct dialogue between Gren Spencer / Wireframe Extended Reality, the Faculty as end-users, and McLaughlin & Harvey the main project contractor, in order to resolve questions about the interaction between the building's physical infrastructure and the two immersive studio installations - e.g. the requirements for room-in-room sound-insulation and e.g. the relationship between the specialist servers for the studios, the buildings data network and the Digital Asset Management system. The sound proofing for immersive installation had to be designed in direct consultation between the main contractor, the project architects, and the identified supplier. The resulting proposed design solution has been worked-up with Gren Spencer / Wireframe Extended Reality and is a fully bespoke installation, which sits within the infrastructure of the building-space and its physical/ M&E and Data network parameters. The installations of the highly specialist, binaural sound and 360 AR/VR capture technologies need to interface precisely with the power and data infrastructure as it has been delivered by the main construction contractor. A major aspect of these bespoke designs is that whilst they use some generic components - they are custom solutions made to fit within the spaces and the M&E and Digital Data infrastructure, which has itself been specifically designed in collaboration with the main contractor. The collaboration that we have established with Wireframe Extended Reality has brought a high degree of added-value to the project, both in terms of the efficacy of the design proposal, which has been achieved because of their market-leading capability in design and supply of such systems; but also, the establishment of lines of communication and collaboration between them as the supplier, our estates project management team and the main redevelopment project contractors. As a result of the above Wireframe Extended Reality are able to meet the needs of this now highly specific project brief and provide the best available end-to-end solution and added-value to this critical project.