Find a TenderAwarded
Published 7 May 2021, 06:35 BST

Official UK procurement notice

IA2269 Framework Agreement for the Provision of Repairs and Treatment of Flat Roofs

Official notice

Authority: Staffordshire County Council (Local council)

Framework agreementWorksOpen procedureSME suitable
Framework ceiling (notional)£10,000,000framework ceiling, not attributable revenue
Submissions closed 18 Jun 2021awarded 1 Sept 2021
Framework period 3 yrsends 30 Nov 2024 · extension options published · starts 1 Dec 2021

What is being bought

Published requirement description

This Framework Agreement is to provide Staffordshire County Council with an agreed

schedule of rates for the renewal and repair of flat roofs on County Council owned buildings

throughout the whole county of Staffordshire. This includes County Council offices, Schools

and Academy buildings.

The term flat roof could mean any roof up to a pitch of 15 degrees and the roofs being worked

on could be of a steel, timber or concrete construction. Most roofs will be single storey or

two storey structures with the occasional three and four storey buildings. The work/service

will generally consist of providing a responsive maintenance service for carrying out patch

repairs to flat felt and asphalt roofs and for providing a comprehensive service to renew the

roof finishes to roofs that have been identified as requiring repair through condition surveys

and asset management plans.

The work will be to carry out traditional built up felt roofing with either pour and roll or torch

on systems and cold applied adhesive system and occasional liquid applied systems.

Individual projects will include all labour and associated works, for example, renewal of roof

lights, scaffolding, perimeter protection, site compounds, welfare facilities and waste

management as a minimum. There will be a great emphasis placed on associated Health and

Safety issues.

  • Recurrence: It is envisaged that contract advert notices for the next Framework Agreement may be placed within the next 2or 3 years. This cannot be guaranteed.

CPV: Bituminous roof-covering work · Roof · Roof maintenance work · Roof repair · Roof repair and maintenance work · Roof works and other special trade construction works · Roof-covering work

How this framework works

From the published notice
Places
up to 3 suppliers · 8 bids received (2.7 per place) · 3 appointed (full)
Framework period
3 yrs from 1 Dec 2021

The lotProcurement structure

single lot · value published
Lot #1AwardedRenewal 3 yrsPublished value£10,000,000
Contract period: 1 Dec 2021 – 30 Nov 2024 (3 yrs)
Delivery: West Midlands · Staffordshire
Extensions: Option to extend by 12 months to 30th November 2025 · option to extend by 12 months to 30th November 2025Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 20%Price: 80%
Published award criteria (2)
  • Quality: 20
  • Price: 80
What this means for your bid
  • Price carries 80 of 100 points: a 10% discount moves about 8 points. This one is won on the number: sharpen the price before polishing the prose.
  • “IA2269 Framework Agreement for the Provision of Repairs and Treatment…” is a framework: the contest is a place on its panel, up to 3 suppliers, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement

Yes · It is envisaged that contract advert notices for the next Framework Agreement may be placed within the next 2or 3 years. This cannot be guaranteed.

First published
7 May 2021, 06:35 BST
Last source update
1 Sept 2021, 07:18 BST
Award evaluation window
18 Jun 2021 – …
Authority reference
DN1225
FTS notice number
2021/S 000-021543
Classification (CPV)
Bituminous roof-covering workRoofRoof maintenance workRoof repairRoof repair and maintenance workRoof works and other special trade construction worksRoof-covering work
Delivery area
West Midlands (UKG2)
Official registry OCID
ocds-h6vhtk-02ae28 Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment
Performance terms

Continued appointment to the Framework Agreement are in accordance with suppliers

adherence to pre-established, ongoing, Key Performance Indicators. See the procurement

documentation.

Review and risk notes
Review procedure

The Contracting Authority will incorporate a minimum 10 calendar day standstill period (or 15

days where non-electronic or fax methods are used) at the point that an award decision

notice is communicated to tenderers.

The award decision process will specify the criteria for the award of the contract/framework

agreement, the reasons for the decision, including the characteristics and relative

advantages, the name and score of the successful tender(s), and will specify when the

standstill period is expected to end or the date before which the Contracting Authority will

not conclude the contract / framework agreement.

If an appeal regarding the award of a contract / framework agreement has not been

successfully resolved, the Public Contracts Regulations 2015 provide for aggrieved parties

who have been harmed or are at risk of a breach of the rules to take action in the High Court

(England, Wales and Northern Ireland).

Any such action must be brought promptly (generally within 3 months). The Court may order

the setting aside of the award decision or may order the Contracting Authority to amend any

document and may award damages.

If an agreement has been entered into the Court may make a declaration of ineffectiveness

or may order that the duration of any relevant specific contract be shortened and

additionally may award damages.

The time limit for seeking such a declaration is generally 30 days from notification of the award (either by award decision notification or contract award notice depending upon the

circumstances) or otherwise 6 months.

Publisher note: This is an electronic tender. All submission must be made via the formal Contracting Authority electronic tendering platform. All requests for information to be sent through the electronic tendering portal and message facility on the Proactis electronic tendering system. How to register - follow the link to Proactis electronic tendering: — https://supplierlive.proactisp2p.com/Account/Login If you require urgent assistance regarding the initial usage of the e-Tendering package please contact the Contracting Authority point-of-contact in Section I.1 of this notice. On failure to reach this contact, please immediately email the nature of the difficulty to [email protected] This procurement is for a Framework Agreement between the appointed providers(s) and the Contracting Authority, to supply predominately services on an ad-hoc call-off basis, as and when required. The Contracting Authority or its public sector partners/Customers makes no guarantee as to the volume of business on offer or to be awarded, and any volumes given are indicative only and intended as a general guide. There is no commitment at the time of tendering from any parties outside of the Contracting Authority and this should be taken into consideration when bidding. All framework management, post-tender, will be in accordance with the Public Contracts Regulations 2015. The call-off orders will be allocated by terms laid down in the framework. Please see the tender documentation for further details. The Contracting Authority also reserves the right to operate a public tender or quotations outside of the framework where so required. As part of the Governments National Procurement Strategy, collaborative working and supporting other Authorities now forms part of the Contracting Authority's procurement remit. This agreement may be made available to other Contracting Authorities including without limitation Councils and Public Bodies within Staffordshire and neighboring geographical areas as prescribed by the NUTS codes in this notice. These will include Health and NHS Bodies, Local Authorities, Contracting Authorities, any other Government Department, Defence, Police and Emergency Services, Metropolitan / District Councils, Utilities, Educational Establishments, and Utilities, including the Contracting Authorities named in this notice. These organisations will be afforded third party rights or be named as beneficiaries under the contract or contracts where appropriate. Financing / Payment: — payments may be made following acceptance by the banking agents of Staffordshire County Council. Legal form of groups of providers: — no special legal form is required by the grouping of providers but each provider will be required to be come jointly or severally responsible for the contract before acceptance. For reference the following website outlines the Contracting Authority's policy on the Community Right to Challenge: — http://www.staffordshire.gov.uk/business/procurement/Community-Right-to- Challenge/Community-Right-to-Challenge.aspx

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
18 Jun 2021, 12:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bid validity
90 days from the deadline
Bids opened
18 Jun 2021, 13:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

18 Jun 2021 → 1 Dec 2021 · 4 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    18 Jun 2021, 12:00 BST
  2. Bids opened
    18 Jun 2021, 13:00 BST
  3. Notice published
    1 Sept 2021, 07:18 BST
  4. Contract starts
    1 Dec 2021

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    1 Sept 2021, 07:18 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 3admitted to the panel · see the list ↓
Bids received 87 from SMEs
Contracts signed 3latest 1 Sept 2021

3 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 3 of these contracts carry the same published figure, £10,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • IA2269 Framework Agreement for the Provision of Repairs and Treatment of Flat Roofs

    Signed
    1 Sept 2021
    Value
    ceiling above
    Period
    … – 30 Nov 2024
    Status
    active
  • Contract 021543-2021-IA2269-2

    Signed
    1 Sept 2021
    Value
    ceiling above
    Period
    … – 30 Nov 2024
    Status
    active
  • Contract 021543-2021-IA2269-3

    Signed
    1 Sept 2021
    Value
    ceiling above
    Period
    … – 30 Nov 2024
    Status
    active

Bid statistics published by the authority

BidsSMEVCSEValid bid range
8bids · 8 electronic7——

Contracting authority & participating public bodies

Staffordshire County Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services 2 Staffordshire Place, Tipping Street, Stafford, West Midlands, ST16 2DHContact name, email, phone Published organisation website ↗

Framework contractors & participating bidders

3 commercial parties on the notice

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria