Find a TenderAwardedContract award notice
Published 16 May 2025, 10:12 BST

Official UK procurement notice

Framework Agreement for the provision of Responsive Property Maintenance and Minor Works

Official notice

Authority: Staffordshire County Council (Local council)

Framework agreement5 lotsWorksOpen procedureAbove thresholdSME suitableVCSE suitable
Framework ceiling (notional)£9,000,000total for 5 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 20 Jul 2026awarded 9 Oct 2026
Award (standstill) to Fenax Developments Limited – T/A Fdl Contractors +7 more15 awards
Framework period 2 yrsends 4 Oct 2028 · up to 4 Oct 2030 with extensions · starts 5 Oct 2026

What is being bought5 lots · detail below

Published requirement description

The Council has procured a Framework Agreement to provide responsive property maintenance and minor works split into the below lots:

  • Lot 1 - Building Works
  • Lot 2 - Plumbing
  • Lot 3 - Mechanical
  • Lot 4 - Electrical
  • Lot 5 - Drainage

The work orders across all lots will be for works under £5,000.

The above works will be undertaken in the following eight administrative areas of the County of Staffordshire:

  • Cannock Chase
  • East Staffordshire
  • Lichfield
  • Newcastle
  • South Staffordshire
  • Stafford Borough
  • Staffordshire Moorlands
  • Tamworth

The properties include all types of buildings operated by a Local Authority including (but not limited to) educational, residential care homes, civic buildings, offices, fire stations, enterprise centres and small industrial units.

Emergency Call Out Response - It is mandatory that successful suppliers adhere to a strict maximum attendance within 2 hours of receipt of oral request. The requirement is to cover 365 days of the year, 24 hours per day including weekends and bank holidays.

  • The authority expects to re-tender this requirement around 1 Apr 2030, 23:59 BST.

CPV: Building completion work · Building installation work · Drainage and surface works · Drainage works · Electrical services · Ground-drainage work · Other building completion work · Repair and maintenance services

How this framework works

From the published notice
Type
Open framework
Call-offs
call-offs may be awarded directly or by further competition
Places
up to 5 suppliers · 20 bids on the busiest of 5 lots (4.0 per place) · 12 appointed (full)
Framework period
2 yrs · up to 4 yrs from 5 Oct 2026
Supplier levy on call-offs (max %)
0.50% of call-off value · Please review the Framework Agreement, clause 15.
Who may buy through it

Stafford Borough Council, Cannock Chase District Council, South Staffordshire District Council, John Taylor MAT, Shaw Education Trust may call off from the Framework once awarded.

Published description of the framework

Awards under the Framework Agreement - Due to the nature of this Framework being re-active maintenance the first-choice route will be Awards without re-opening Competition.

  1. Awards without re-opening Competition - can Direct Award to a supplier on the relevant lot/district coverage with lowest price tendered rate within the time band e.g. within normal working hours (8am-6pm) and out of hours (6pm-8am).
  2. Awards following Further Competition - invite all the suppliers on the relevant lot/district coverage to provide a quote.

Lots and requirements (5)Procurement structure

5 lots · all with a published value · same evaluation weights on every lot

Every one of these 3 lots carries the same published figure, £2,500,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Building WorksAwardedRenewal 2 yrsSMEVCSEceiling above

The source published no individual description for this lot.

Contract period: 5 Oct 2026 – 4 Oct 2028 (2 yrs) · up to 4 Oct 2030 with extensions
Delivery: West MidlandsEligibility: SME eligibleVCSE eligible
Extensions: 2x12 months to 4th October 2029 and 4th October 2030
Pre-qualification & selection criteria (PQQ)1
  • Technical & professional ability

    Staffordshire County Council requires the successful Supplier to have ongoing 3rd party accreditations which meet the following requirements during the term of the Framework:

    1. To have a compliant Health & Safety accreditation performed by a Safety Schemes in Procurement ('SSIP'). For more information refer to the link ssip.org.uk/members/ ↗

    2: Valid and compliant member of an independent pre-qualification accrediting body. for example, Constructionline (accredited to a minimum membership level of 'GOLD') or other equivalent bodies, offer such a service.

    Note 1 - the accrediting bodies must allow for annual refreshes/vetting of the Supplier in the areas

    Note 2 - where brand names are mentioned, the Authority will consider equivalents

    Note 3 - evidence of the above accreditations MUST be provided to the Authority by successful Supplier prior to Contract Award

    Competency requirements - Have at least one employee with the following qualifications:

    City & Guilds Level 6 NVQ Diploma in Construction Site Management (6578)

    City & Guilds Level 2 Technical Certificate in Site Carpentry (7906-20)

    City & Guilds Level 2 Technical Certificate in Bricklaying (7905-20)

    City & Guilds Level 2 Diploma in Plastering (6708-23)

    City & Guilds Level 2 Diploma in Painting & Decorating (6707-23)

    City & Guilds Level 2 Diploma in Roof Slating and Tiling (6718-02)

    Any personnel utilised on this contract must have an Enhanced DBS check

Lot #2PlumbingAwardedRenewal 2 yrsSMEVCSEPublished value£500,000

The source published no individual description for this lot.

Contract period: 5 Oct 2026 – 4 Oct 2028 (2 yrs) · up to 4 Oct 2030 with extensionsValue: £500,000 exc. VAT · £600,000 inc. VAT
Delivery: West MidlandsEligibility: SME eligibleVCSE eligible
Extensions: 2x12 months to 4th October 2029 and 4th October 2030
Pre-qualification & selection criteria (PQQ)1
  • Technical & professional ability

    Staffordshire County Council requires the successful Supplier to have ongoing 3rd party accreditations which meet the following requirements during the term of the Framework:

    1. To have a compliant Health & Safety accreditation performed by a Safety Schemes in Procurement ('SSIP'). For more information refer to the link ssip.org.uk/members/ ↗

    2: Valid and compliant member of an independent pre-qualification accrediting body. for example, Constructionline (accredited to a minimum membership level of 'GOLD') or other equivalent bodies, offer such a service.

    Note 1 - the accrediting bodies must allow for annual refreshes/vetting of the Supplier in the areas

    Note 2 - where brand names are mentioned, the Authority will consider equivalents

    Note 3 - evidence of the above accreditations MUST be provided to the Authority by successful Supplier prior to Contract Award

    Competency requirements - Have at least one employee with Level 2 NVQ Diploma in Plumbing and Heating

    Any personnel utilised on this contract must have an Enhanced DBS check

Lot #3MechanicalAwardedRenewal 2 yrsSMEVCSEceiling above

The source published no individual description for this lot.

Contract period: 5 Oct 2026 – 4 Oct 2028 (2 yrs) · up to 4 Oct 2030 with extensions
Delivery: West MidlandsEligibility: SME eligibleVCSE eligible
Extensions: 2x12 months to 4th October 2029 and 4th October 2030
Pre-qualification & selection criteria (PQQ)1
  • Technical & professional ability

    Staffordshire County Council requires the successful Supplier to have ongoing 3rd party accreditations which meet the following requirements during the term of the Framework:

    1. To have a compliant Health & Safety accreditation performed by a Safety Schemes in Procurement ('SSIP'). For more information refer to the link ssip.org.uk/members/ ↗

    2: Valid and compliant member of an independent pre-qualification accrediting body. for example, Constructionline (accredited to a minimum membership level of 'GOLD') or other equivalent bodies, offer such a service.

    Note 1 - the accrediting bodies must allow for annual refreshes/vetting of the Supplier in the areas

    Note 2 - where brand names are mentioned, the Authority will consider equivalents

    Note 3 - evidence of the above accreditations MUST be provided to the Authority by successful Supplier prior to Contract Award

    Competency requirements - Have at least one engineer that is Gas Safe registered to cover all of non-domestic and domestic disciplines including but not limited to the list below:

    1. Air Heating
    • Direct Fired Appliances NG
    • Indirect Fired Heating Appliances NG
    1. Catering - Commercial Catering NG (CORE)
    2. Pipework - First Fix Commercial Pipe work NG
    3. Pipework Commissioning - NON DOM Testing & Purging up to 1m3 NG
    4. Water Central Heating - Indirect Fired Heating Appliances NG

    Any personnel utilised on this contract must have an Enhanced DBS check

Lot #4ElectricalAwardedRenewal 2 yrsSMEVCSEceiling above

The source published no individual description for this lot.

Contract period: 5 Oct 2026 – 4 Oct 2028 (2 yrs) · up to 4 Oct 2030 with extensions
Delivery: West MidlandsEligibility: SME eligibleVCSE eligible
Extensions: 2x12 months to 4th October 2029 and 4th October 2030
Pre-qualification & selection criteria (PQQ)1
  • Technical & professional ability

    Staffordshire County Council requires the successful Supplier to have ongoing 3rd party accreditations which meet the following requirements during the term of the Framework:

    1. To have a compliant Health & Safety accreditation performed by a Safety Schemes in Procurement ('SSIP'). For more information refer to the link ssip.org.uk/members/ ↗

    2: Valid and compliant member of an independent pre-qualification accrediting body. for example, Constructionline (accredited to a minimum membership level of 'GOLD') or other equivalent bodies, offer such a service.

    Note 1 - the accrediting bodies must allow for annual refreshes/vetting of the Supplier in the areas

    Note 2 - where brand names are mentioned, the Authority will consider equivalents

    Note 3 - evidence of the above accreditations MUST be provided to the Authority by successful Supplier prior to Contract Award

    Competency requirements:

    Company: Hold a recognised accrediting body, examples include NICEIC or NAPIT. This covers independent auditing, H&S practice, certification and building regs.

    Engineer Competency: Hold an ECS Gold Card. At present this is a level 3 NVQ in an electrotechnical based award, ECS H&S assessment and 18th edition wiring regulations. This covers what may be defined as a "skilled" worker.

    Any personnel utilised on this contract must have an Enhanced DBS check

Lot #5DrainageAwardedRenewal 2 yrsSMEVCSEPublished value£1,000,000

The source published no individual description for this lot.

Contract period: 5 Oct 2026 – 4 Oct 2028 (2 yrs) · up to 4 Oct 2030 with extensionsValue: £1,000,000 exc. VAT · £1,200,000 inc. VAT
Delivery: West MidlandsEligibility: SME eligibleVCSE eligible
Extensions: 2x12 months to 4th October 2029 and 4th October 2030
Pre-qualification & selection criteria (PQQ)1
  • Technical & professional ability

    Staffordshire County Council requires the successful Supplier to have ongoing 3rd party accreditations which meet the following requirements during the term of the Framework:

    1. To have a compliant Health & Safety accreditation performed by a Safety Schemes in Procurement ('SSIP'). For more information refer to the link ssip.org.uk/members/ ↗

    2: Valid and compliant member of an independent pre-qualification accrediting body. for example, Constructionline (accredited to a minimum membership level of 'GOLD') or other equivalent bodies, offer such a service.

    Note 1 - the accrediting bodies must allow for annual refreshes/vetting of the Supplier in the areas

    Note 2 - where brand names are mentioned, the Authority will consider equivalents

    Note 3 - evidence of the above accreditations MUST be provided to the Authority by successful Supplier prior to Contract Award

    Any personnel utilised on this contract must have an Enhanced DBS check

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 5 lots
Quality: 20%Price: 80%
Published sub-criteria (4)
  • Working Example: 10%
  • Experience / Case Study: 5%
  • Complaints Procedure: 5%
  • Price: 80%
Published award criteria (4)
  • Price
  • Working Example
  • Experience / Case Study
  • Complaints Procedure
What this means for your bid
  • Price carries 80 of 100 points: a 10% discount moves about 8 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Framework Agreement for the provision of Responsive Property…” is a framework: the contest is a place on its panel, up to 5 suppliers, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Stafford Borough Council, Cannock Chase District Council, South Staffordshire District Council, John Taylor MAT, Shaw Education Trust may call off from the Framework once awarded.
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Yes · next expected 1 Apr 2030
First published
16 May 2025, 10:12 BST
Last source update
13 Oct 2026, 10:42 BST
Award evaluation window
Submission end – 8 Sept 2026
Authority reference
IA3557
FTS notice number
2026/S 000-056807
Latest notice
Contract award notice (UK6)
Classification (CPV)
Building completion workBuilding installation workDrainage and surface worksDrainage worksElectrical servicesGround-drainage workOther building completion workRepair and maintenance services
Delivery area
UKWest Midlands (UKG2)
Official registry OCID
ocds-h6vhtk-051564 Find a Tender
Review and risk notes
Risks

Local Government Re-organisation

1.1 In December 2024 the Government issued a White Paper on Local Government Re-Organisation entitled the "English Devolution White Paper".

1.2 In March 2025 Staffordshire County Council submitted their suggested re-organisation plan to the Government and are awaiting a response.

1.3 Final proposals will be submitted in November 2025 and implementation of the changes is expected by Government to be by 2028 at the earliest.

1.4 Whilst the expected impact of most changes to Local Government will be settled at Government Level (Change in Law) please be aware that it may be government policy or expedient that any affected party will be recommended to agree bi-lateral or multi-lateral changes to their existing contractual arrangements.

1.5 Updates on proposals and changes can be found on the Staffordshire County Council Website and at other media outlets

2 The parties agree that in the event of a Local Government Re-organisation:-

2.1 that reorganisation of local authorities may result in the transfer assignment or novation of this Agreement in whole or in part to a successor authority or successor authorities. Such transfer assignment or novation shall not constitute a breach or require consent and the [contracting party] consents to the transfer assignment or novation of this Agreement in whole or in parts to any successor authority(ies) established under the local government reorganisation legislation and that as a consequence the obligations and rights under this Agreement shall continue to apply and be enforceable by or against any successor authority(ies) following a local government reorganisation; and

2.2 the parties acknowledge that if applicable the Transfer of Undertakings (Protection of Employment) Regulations 2006 may apply and agree to comply with all consequential and reasonable obligations arising thereunder

2.3 the parties acknowledge that any new organisation(s) may utilise or create and manage all and any existing or required framework agreements relating to the provision of the [goods and] services provided under this current agreement.

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
20 Jul 2026, 12:00 BST
Clarification deadline
13 Jul 2026, 23:59 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)
call-off levy · 0.50% of call-off value · Please review the Framework Agreement, clause 15.
Detailed submission instructions & authority contactsFrom official release

The tender documents are available through Staffordshire County Councils e-tendering system 'Proactis'.

supplierlive.proactisp2p.com ↗

All bids must be submitted back to Proactis prior to the tender deadline. Any questions regarding the tender must go through the e-tendering system via the message function.

Timeline

16 May 2025 → 22 Oct 2026 · 10 dates
  1. Planning notice published
    16 May 2025, 10:12 BST
  2. Next notice expected261 days ago
    1 Feb 2026, 23:59 GMT
  3. Tender notice published127 days ago
    16 Jun 2026, 16:30 BST
  4. Clarification questions by99 days ago
    13 Jul 2026, 23:59 BST
  5. Admission / appointment period ends93 days ago · period end, not a bid countdown
    20 Jul 2026, 12:00 BST
  6. Award decision expected by42 days ago
    8 Sept 2026, 23:59 BST
  7. Contract starts16 days ago
    5 Oct 2026, 00:00 BST
  8. Assessment summaries sent8 days ago
    13 Oct 2026, 00:00 BST
  9. Latest notice published8 days ago
    13 Oct 2026, 10:42 BST
  10. Today
    21 Oct 2026
  11. Standstill endsin 2 days
    22 Oct 2026, 23:59 BST

Notice history

9 events · 3 releases on Find a Tender · since 16 May 2025
  1. Pipeline notice published
    16 May 2025, 10:12 BST
    UK1
  2. Tender notice published
    16 Jun 2026, 16:30 BST
    UK4
  3. Published value published: £9,000,000
    16 Jun 2026, 16:30 BST
  4. Status changed to active
    16 Jun 2026, 16:30 BST
  5. Procurement method changed
    16 Jun 2026, 16:30 BST
  6. Deadline published: 20 Jul 2026, 12:00 BST
    16 Jun 2026, 16:30 BST
  7. Contract award notice published
    13 Oct 2026, 10:42 BST
    UK6
  8. Status changed to complete
    13 Oct 2026, 10:42 BST
  9. Contract signature expected
    27 Oct 2026, 23:59 GMT
    scheduled

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 1225 awards · see the list ↓
Bids received 2019 from SMEs · busiest of 5 lots

£2,500,000 is the framework's published maximum, restated by the publisher on 12 award rows. It is one ceiling, not 12 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Lot 1 · Building Works2 awards
Fenax Developments Limited – T/A Fdl ContractorsSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
Fords of Blythe Bridge LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
Lot 2 · Plumbing1 award
G Evans (Services) LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030£500,0009 Oct 2026standstill to 22 Oct 2026Standstill
Lot 3 · Mechanical5 awards
Fords of Blythe Bridge LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
M.W. CRIPWELL LIMITEDSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
Plumbing & Heating ServicesSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
Heatelect LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
G Evans (Services) LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
Lot 4 · Electrical5 awards
Fenax Developments Limited – T/A Fdl ContractorsSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
Roy Dyke Electrical LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
M.W. CRIPWELL LIMITEDSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
G Evans (Services) LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
Connect Electrical (Staffs) LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030ceiling above9 Oct 2026standstill to 22 Oct 2026Standstill
Lot 5 · Drainage2 awards
Fords of Blythe Bridge LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030£1,000,0009 Oct 2026standstill to 22 Oct 2026Standstill
G Evans (Services) LtdSME9 Nov 2026 – 8 Nov 2028 · up to 8 Nov 2030Extensions: 2 x 1 years to 8th November 2029 and 8th November 2030£1,000,0009 Oct 2026standstill to 22 Oct 2026Standstill

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Building Works10final-stage tenders · 11 at stage one100—
2 · Plumbing14final-stage tenders · 17 at stage one140—
3 · Mechanical9final-stage tenders · 12 at stage one90—
4 · Electrical20final-stage tenders · 23 at stage one190—
5 · Drainage10final-stage tenders · 11 at stage one90—

Contracting authority & participating public bodies

Staffordshire County Council

Contracting authorityPublic authority - sub-central government GB-PPON: PZDG-2995-QQMD 1 Staffordshire Place, Tipping Street,, Stafford, West Midlands, ST16 2DHContact email

Framework contractors & participating bidders

12 commercial parties on the notice
  • BIOMARSH ENVIRONMENTAL LTDFramework contractorGB-COH: 01124715GB-PPON: PMZC-5955-JWQZ Peartree Farm, Waltham Abbey, East of England, EN9 2EWContact email
  • CONNECT ELECTRICAL (STAFFS) LTDFramework contractorGB-COH: 06989601GB-PPON: PJTV-8437-WBLL 6 Turner Street, Stoke-On-Trent, West Midlands, ST1 2NJContact email
  • DRAINTECH SERVICES (MIDLANDS) LIMITEDFramework contractorGB-COH: 06421649GB-PPON: PXPH-9281-MGWN The Barns, Meriden, West Midlands, CV7 7JEContact email
  • FENAX DEVELOPMENTS LIMITEDFramework contractorGB-COH: 07755706GB-PPON: PPCY-9954-RHVM 23 Bilston Street, Dudley, West Midlands, DY3 1JAContact email
  • FORDS OF BLYTHE BRIDGE LIMITEDFramework contractorGB-COH: 01273930GB-PPON: PYGV-7484-HNMV 203 Grindley Lane, Stoke-On-Trent, West Midlands, ST11 9JSContact email
  • G.EVANS SERVICES LIMITEDFramework contractorGB-COH: 03549255GB-PPON: PLMB-3841-WGMQ Tudor House, Bilston, West Midlands, WV14 6JDContact email
  • HEATELECT LIMITEDFramework contractorGB-COH: 02224000GB-PPON: PHNN-4228-NMRH The Coach House, 12A Dixons Green Road, Dudley, West Midlands, DY2 7DHContact email
  • M.W. CRIPWELL LIMITEDFramework contractorGB-COH: 01207642GB-PPON: PTHP-4736-XGZQ 119A Derby Street, Burton-On-Trent, West Midlands, DE14 2LEContact email
  • PLUMBING & HEATING SERVICES (STAFFS) LTDFramework contractorGB-COH: 05407854GB-PPON: PNXR-7818-WZNX Houghwood Bottom Farm, Stoke on Trent, West Midlands, ST9 9LLContact email
  • R A EDWARDS & PARTNERS LIMITEDFramework contractorGB-COH: 03492561GB-PPON: PWZG-2676-LRTR Unit 2 Tilcon Avenue, Stafford, West Midlands, ST18 0YJContact email
Show 2 more suppliers
  • ROY DYKE ELECTRICAL LIMITEDFramework contractorGB-COH: 03652010GB-PPON: PYBQ-5315-QBJD 44 Poole Crescent, Bilston, West Midlands, WV14 8SUContact email
  • THREE PINES BUILDING CO. LIMITEDFramework contractorGB-COH: 01064152GB-PPON: PMJQ-9459-GHCY Cullwick Court, Wolverhampton, West Midlands, WV1 2URContact email

Official documents & specifications (29)

Official links; attachments are not copied

Tender pack and attachments

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
Show 19 more notices
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender