Official UK procurement notice
Framework Agreement for the Provision of Highways Capital Delivery Services
Authority: West Sussex County Council (Local council)·Consortium: 2 public authorities
What is being bought4 lots · detail below
Published requirement descriptionA Framework Agreement for the provision of Highway Services was tendered by West Sussex County Council (WSCC) in accordance with the Public Contracts Regulations 2015 (PCR 2015).<br/><br/>Bidders were invited to tender for multiple Lots. A summary of the Requirement is given below.<br/><br/>
- The appointment of a maximum of five Contractors to each Lot described below under the Highways Services Framework to provide Highways Services across the county of West Sussex. The Framework Services comprise four lots, incorporating:<br/><br/>
- Lot 4 - Carriageway and Footway Resurfacing<br/>o Mobilisation/demobilisation services<br/>o Carriageway Resurfacing (including in-situ recycling, Traffic Management, lining and studs)<br/>o Footway Resurfacing (resurfacing, reconstruction and in-situ recycling)<br/><br/>
- Lot 5 - Carriageway Surface Dressing and Carriageway & Footway Treatments<br/>o Mobilisation/demobilisation services<br/>o Carriageway surface dressing<br/>o Carriageway treatments, high friction surfacing, re-texturing, joint sealing (including in-situ recycling, Traffic Management, lining and studs<br/>o Footway services (repairs, micro surfacing)<br/><br/>
- Lot 6 - Infrastructure Improvement<br/>o Mobilisation/demobilisation services<br/>o Highway improvement schemes - £25k<£2m<br/><br/>
- Lot 7 - Carriageway Structural Patching<br/>o Mobilisation/demobilisation services<br/>o Carriageway Structural Patching<br/>o PSD Patching<br/>o Minor Carriageway Associated Civils<br/>o Footway Resurfacing (resurfacing, reconstruction, and in-situ recycling)
CPV: Construction work for highways · Construction work for highways, roads
How this framework works
From the published notice- Places
- up to 20 suppliers · 6 bids on the busiest of 3 lots (0.3 per place) · 16 appointed
- Framework period
- 4 yrs from 1 Apr 2024
Lots and requirements (4)Procurement structure
4 lots · all with a published value · evaluation weights differ by lotLot #1Carriageway and Footway ResurfacingAwardedRenewalPublished value£80,000,000
A Framework Agreement for the provision of Highway Services is being tendered by West Sussex <br/>County Council (WSCC) in accordance with the Public Contracts Regulations 2015 (PCR 2015).<br/>For the purposes of this procurement exercise, the term Works or Services is used to describe the <br/>full range of Works or Services required. Bidders are invited to tender for multiple Lots but should <br/>note that separate tenders for each Lot they wish to be considered for must be submitted. A <br/>summary of the Requirement is given below.<br/>
- The appointment of a maximum of five Contractors to each Lot described below under <br/>the Highways Services Framework to provide Highways Services across the county of <br/>West Sussex. The Framework Services comprise four lots, incorporating:<br/>
- Lot 4 - Carriageway and Footway Resurfacing<br/>o Mobilisation/demobilisation services<br/>o Carriageway Resurfacing (including in-situ recycling, Traffic Management, lining <br/>and studs)<br/>o Footway Resurfacing (resurfacing, reconstruction and in-situ recycling) Additional information: Where changes to UK public procurement regulations or legislation during the life of the Framework Agreement permit, extensions to this Framework Agreement may be applied at the Councils discretion to a total term of 6-years. The total contract values shall be adjusted accordingly by the annual values presented.<br/><br/>The Framework Agreement is for the use of WSCC and the following partner authorities: <br/>
- The District and Borough Councils of West Sussex<br/>
- The Town Councils of West Sussex<br/>
- The Parish Councils of West Sussex
Lot #2Carriageway Surface Dressing and Carriageway & Footway TreatmentsAwardedRenewalPublished value£40,000,000
A Framework Agreement for the provision of Highway Services is being tendered by West Sussex <br/>County Council (WSCC) in accordance with the Public Contracts Regulations 2015 (PCR 2015).<br/>For the purposes of this procurement exercise, the term Works or Services is used to describe the <br/>full range of Works or Services required. Bidders are invited to tender for multiple Lots but should <br/>note that separate tenders for each Lot they wish to be considered for must be submitted. A <br/>summary of the Requirement is given below.<br/>
- The appointment of a maximum of five Contractors to each Lot described below under <br/>the Highways Services Framework to provide Highways Services across the county of <br/>West Sussex. The Framework Services comprise four lots, incorporating:<br/>Lot 5 - Carriageway Surface Dressing and Carriageway & Footway Treatments<br/>o Mobilisation/demobilisation services<br/>o Carriageway surface dressing<br/>o Carriageway treatments, high friction surfacing, re-texturing, joint sealing <br/>(including in-situ recycling, Traffic Management, lining and studs<br/>o Footway services (repairs, micro surfacing) Additional information: Where changes to UK public procurement regulations or legislation during the life of the Framework Agreement permit, extensions to this Framework Agreement may be applied at the Councils discretion to a total term of 6-years. The total contract values shall be adjusted accordingly by the annual values presented.<br/><br/>The Framework Agreement is for the use of WSCC and the following partner authorities: <br/>
- The District and Borough Councils of West Sussex<br/>
- The Town Councils of West Sussex<br/>
- The Parish Councils of West Sussex
Lot #3Infrastructure ImprovementCancelledRenewalPublished value£58,000,000
A Framework Agreement for the provision of Highway Services is being tendered by West Sussex <br/>County Council (WSCC) in accordance with the Public Contracts Regulations 2015 (PCR 2015).<br/>For the purposes of this procurement exercise, the term Works or Services is used to describe the <br/>full range of Works or Services required. Bidders are invited to tender for multiple Lots but should <br/>note that separate tenders for each Lot they wish to be considered for must be submitted. A <br/>summary of the Requirement is given below.<br/>
- The appointment of a maximum of five Contractors to each Lot described below under <br/>the Highways Services Framework to provide Highways Services across the county of <br/>West Sussex. The Framework Services comprise four lots, incorporating:<br/>Lot 6 - Infrastructure Improvement<br/>o Mobilisation/demobilisation services<br/>o Highway improvement schemes - £25k<£2m. Additional information: Where changes to UK public procurement regulations or legislation during the life of the Framework Agreement permit, extensions to this Framework Agreement may be applied at the Councils discretion to a total term of 6-years. The total contract values shall be adjusted accordingly by the annual values presented.<br/><br/>The Framework Agreement is for the use of WSCC and the following partner authorities: <br/>
- The District and Borough Councils of West Sussex<br/>
- The Town Councils of West Sussex<br/>
- The Parish Councils of West Sussex
Lot #4Carriageway Structural PatchingAwardedRenewalPublished value£20,000,000
A Framework Agreement for the provision of Highway Services is being tendered by West Sussex <br/>County Council (WSCC) in accordance with the Public Contracts Regulations 2015 (PCR 2015).<br/>For the purposes of this procurement exercise, the term Works or Services is used to describe the <br/>full range of Works or Services required. Bidders are invited to tender for multiple Lots but should <br/>note that separate tenders for each Lot they wish to be considered for must be submitted. A <br/>summary of the Requirement is given below.<br/>
- The appointment of a maximum of five Contractors to each Lot described below under <br/>the Highways Services Framework to provide Highways Services across the county of <br/>West Sussex. The Framework Services comprise four lots, incorporating:<br/>Lot 7 - Carriageway Structural Patching<br/>o Mobilisation/demobilisation services<br/>o Carriageway Structural Patching<br/>o PSD Patching<br/>o Minor Carriageway Associated Civils<br/>o Footway Resurfacing (resurfacing, reconstruction, and in-situ recycling) Additional information: Where changes to UK public procurement regulations or legislation during the life of the Framework Agreement permit, extensions to this Framework Agreement may be applied at the Councils discretion to a total term of 6-years. The total contract values shall be adjusted accordingly by the annual values presented.<br/><br/>The Framework Agreement is for the use of WSCC and the following partner authorities: <br/>
- The District and Borough Councils of West Sussex<br/>
- The Town Councils of West Sussex<br/>
- The Parish Councils of West Sussex
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Lots publish different evaluation splits; there is no single procedure weighting.
| Lot | Quality | Price | Split |
|---|---|---|---|
| 1 · Carriageway and Footway Resurfacing | 70% | 30% | |
| 2 · Carriageway Surface Dressing and Carriageway & Footway Treatments | 70% | 30% | |
| 3 · Infrastructure Improvement | 70% | 30% | |
| 4 · Carriageway Structural Patching | 70% | 30% |
- Suitability
As per the tender pack.
- Staff
- Names and qualifications of delivery staff must be submitted
- Price carries 30 points on every lot: a 10% discount moves about 3 points.
- “Framework Agreement for the Provision of Highways Capital Delivery…” is a framework: the contest is a place on its panel, up to 20 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 19 Oct 2023, 09:55 BST
- Last source update
- 15 Oct 2024, 13:51 BST
- Award evaluation window
- 4 Dec 2023 – …
- Authority reference
C17440- FTS notice number
2024/S 000-033147- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-040d44Find a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Performance terms
As per the tender pack.
Publisher note: Where changes to UK public procurement regulations or legislation during the life of the Framework Agreement permit, extensions to this Framework Agreement may be applied at the Councils discretion to a total term of 6-years. The total contract values shall be adjusted accordingly by the annual values presented.
How it was run
Official notice- Appointment period ends
- 4 Dec 2023, 12:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 120 days from the deadline
- Bids opened
- 4 Dec 2023, 12:00 GMT
Timeline
4 Dec 2023 → 15 Oct 2024 · 4 dates- Admission / appointment period endsperiod end, not a bid countdown4 Dec 2023, 12:00 GMT
- Bids opened4 Dec 2023, 12:00 GMT
- Contract starts1 Apr 2024, 00:00 BST
- Notice published15 Oct 2024, 13:51 BST
Notice history
2 events · 2 releases on Find a Tender · since 15 Oct 2024- Status changed to complete15 Oct 2024, 13:51 BST
- Buyer details updated15 Oct 2024, 13:51 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast19 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 5 of these contracts carry the same published figure, £16,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Carriageway and Footway Resurfacing
- Signed
- 31 Mar 2024
- Value
- ceiling above
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Surface Dressing and Carriageway & Footway Treatments
- Signed
- 31 Mar 2024
- Value
- £8,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Infrastructure Improvement
- Signed
- 31 Mar 2024
- Value
- £11,600,000
- Period
- … – 31 Mar 2028
- Status
- active
Infrastructure Improvement
- Signed
- 31 Mar 2024
- Value
- £11,600,000
- Period
- … – 31 Mar 2028
- Status
- active
Infrastructure Improvement
- Signed
- 31 Mar 2024
- Value
- £11,600,000
- Period
- … – 31 Mar 2028
- Status
- active
Infrastructure Improvement
- Signed
- 31 Mar 2024
- Value
- £11,600,000
- Period
- … – 31 Mar 2028
- Status
- active
Infrastructure Improvement
- Signed
- 31 Mar 2024
- Value
- £11,600,000
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Structural Patching
- Signed
- 31 Mar 2024
- Value
- £5,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Structural Patching
- Signed
- 31 Mar 2024
- Value
- £5,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Structural Patching
- Signed
- 31 Mar 2024
- Value
- £5,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Structural Patching
- Signed
- 31 Mar 2024
- Value
- £5,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway and Footway Resurfacing
- Signed
- 31 Mar 2024
- Value
- ceiling above
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway and Footway Resurfacing
- Signed
- 31 Mar 2024
- Value
- ceiling above
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway and Footway Resurfacing
- Signed
- 31 Mar 2024
- Value
- ceiling above
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway and Footway Resurfacing
- Signed
- 31 Mar 2024
- Value
- ceiling above
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Surface Dressing and Carriageway & Footway Treatments
- Signed
- 31 Mar 2024
- Value
- £8,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Surface Dressing and Carriageway & Footway Treatments
- Signed
- 31 Mar 2024
- Value
- £8,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Surface Dressing and Carriageway & Footway Treatments
- Signed
- 31 Mar 2024
- Value
- £8,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Carriageway Surface Dressing and Carriageway & Footway Treatments
- Signed
- 31 Mar 2024
- Value
- £8,000,000
- Period
- … – 31 Mar 2028
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Carriageway and Footway Resurfacing | 6bids · 6 electronic | 0 | — | — |
| 2 · Carriageway Surface Dressing and Carriageway & Footway Treatments | 5bids · 5 electronic | 0 | — | — |
| 4 · Carriageway Structural Patching | 4bids · 4 electronic | 0 | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- Public Procurement Review ServiceMediation bodyReview bodyReview contact point
Framework contractors & participating bidders
16 commercial parties on the notice- Aggregate Industries UK LimitedFramework contractor
- Associated Asphalt Contracting LtdFramework contractor
- B and M McHugh LtdFramework contractor
- Breheny Civil EngineeringFramework contractor
- Colas LtdFramework contractor
- Connor Construction (South West) LtdFramework contractor
- Edburton Contractors LtdFramework contractor
- Eurovia Infrastructure LimitedFramework contractor
- FM Conway LimitedFramework contractor
- GW HighwaysFramework contractor
Show 6 more suppliers
- Hazell and Jefferies LtdFramework contractor
- JPCS LimitedFramework contractor
- Kier TransportationFramework contractor
- Landbuild LtdFramework contractor
- Octavius Infrastructure LtdFramework contractor
- Tarmac Trading LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria