Find a TenderAwarded
Published 9 Mar 2023, 14:02 GMT

Official UK procurement notice

Framework Agreement C1 Road Maintenance and Minor Civil Engineering Works up to 1,500,000 GBP in Value

Official notice

Authority: Fife Council (Local council)

Framework agreement3 lotsWorksOpen procedureSME suitable
Framework ceiling (notional)£32,000,000total for 3 lots · framework ceiling, not attributable revenue
Submissions closed 11 Apr 2023awarded 14 Aug 2023
Lots 3see the lot list below
Framework period 2 yrsends 11 May 2025 · extension options published · starts 12 May 2023

What is being bought3 lots · detail below

Published requirement description
  1. Roads Construction and maintenance works for carriageways, footways, car parks, cycleways, junctions, surface water drainage, pedestrian crossings, traffic calming schemes, loop detector installations, pedestrian guardrails/handrails and associated roads lighting, road marking, signing and accommodation works.
  2. Structures Construction and maintenance works for bridges, culverts and retaining walls.
  3. Harbours, Flood and Coast Construction and maintenance works for coastal structures, harbours and related works.

CPV: Works for complete or part construction and civil engineering work

How this framework works

From the published notice
Places
up to 12 suppliers · 13 bids on the busiest of 3 lots (1.1 per place) · 11 appointed
Framework period
2 yrs from 12 May 2023

Lots and requirements (3)Procurement structure

3 lots · all with a published value · same evaluation weights on every lot

Every one of these 2 lots carries the same published figure, £1,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1RoadsCancelledRenewal 2 yrsPublished value£28,000,000

Construction and maintenance works for carriageways, footways, car parks, cycleways, junctions, surface water drainage, pedestrian crossings, traffic calming schemes, loop detector installations, pedestrian guardrails/handrails and associated roads lighting, road marking, signing and accommodation works.

Contract period: 12 May 2023 – 11 May 2025 (2 yrs)
Delivery: Scotland · Fife
Extensions: 24 monthsVariant bids: not allowed
Lot #2StructuresCancelledRenewalceiling above

Construction and maintenance works for bridges, culverts and retaining walls..

Delivery: Scotland · Fife
Extensions: 24 MonthsVariant bids: not allowed
Lot #3Harbour, Flood and CoastalCancelledRenewalceiling above

Construction and maintenance works for coastal structures, harbours and related works.

Delivery: Scotland · Fife
Extensions: 24 MonthsVariant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 3 lots
Quality: 20%Price: 80%
Published award criteria (2)
  • quality: 20
  • Price: 80
Conditions of participation1
  • Suitability

    he Specification for Highway Works (SHW) applies to all Work packages issued through this Framework Agreement. Not all of the National Highway Sector Schemes (NHSS) from Appendix A of the SHW will be mandatory. Appendix 0/2 of Volume 2 of the Framework Agreement stipulates the NHSS schemes that are mandatory and those that are not. Those listed as mandatory will apply to all businesses undertaking any of these Works/ Services unless the business complies with any alternative requirement that may be stipulated in the comments column of Appendix A of SHW. If your business subcontracts the work, you do not have to be registered but any subcontractor you use must be.

Staff
Names and qualifications of delivery staff must be submitted
What this means for your bid
  • Price carries 80 of 100 points: a 10% discount moves about 8 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Framework Agreement C1 Road Maintenance and Minor Civil Engineering…” is a framework: the contest is a place on its panel, up to 12 suppliers, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
9 Mar 2023, 14:02 GMT
Last source update
14 Aug 2023, 16:26 BST
Award evaluation window
10 Apr 2023 – …
Authority reference
C01
FTS notice number
2023/S 000-023776
Classification (CPV)
Works for complete or part construction and civil engineering work
Delivery area
Scotland (UKM72)
Official registry OCID
ocds-h6vhtk-03b0f5 Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic payment
Performance terms

as defined in the Contract Documents - see Performance Appraisal.

Publisher note: Any Tender Queries should be submitted through the PCS Question & Answer portal. (SC Ref:741596)

How it was run

Official notice
Run through: Public Contracts Scotland · Who buys & how to bid on PCS
Supplier login requiredLanguage: EN
Access & registration note: Free single registration for Scotland; PCS-Tender (Jaggaer) for full bidding

Tender documents are also served through a separate tool: https://www.publiccontractsscotland.gov.uk/authority/noticecreate/Question602.aspx?ID=725260 ↗

Appointment period ends
11 Apr 2023, 12:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bids opened
10 Apr 2023, 12:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

10 Apr 2023 → 14 Aug 2023 · 4 dates
  1. Bids opened
    10 Apr 2023, 12:00 BST
  2. Admission / appointment period endsperiod end, not a bid countdown
    11 Apr 2023, 12:00 BST
  3. Contract starts
    12 May 2023, 00:00 BST
  4. Notice published
    14 Aug 2023, 16:26 BST

Notice history

2 events · 3 releases on Find a Tender · since 20 Mar 2023
  1. Deadline moved to 11 Apr 2023, 12:00 BST
    20 Mar 2023, 15:30 GMT
    +1 days · was 10 Apr 2023, 12:00 BST
  2. Status changed to complete
    14 Aug 2023, 16:26 BST
Published amendments (1 · 1 deadline change)
WhenWhatBeforeAfterShift
—DeadlineTime limit · IV.2.210 Apr 202311 Apr 2023+1 d
—Bid openingConditions for opening of tenders · IV.2.710 Apr 202311 Apr 2023+1 d

Due to easter holidays

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 11admitted to the panel · see the list ↓
Bids received 1310 from SMEs · busiest of 3 lots
Contracts signed 3latest 14 Aug 2023

3 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 2 of these contracts carry the same published figure, £2,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Roads

    Signed
    14 Aug 2023
    Value
    £40,000,000
    Period
    … – 11 May 2025
    Status
    active
  • Structures

    Signed
    14 Aug 2023
    Value
    ceiling above
    Status
    active
  • Harbour, Flood and Coastal

    Signed
    14 Aug 2023
    Value
    ceiling above
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Roads13bids · 13 electronic · 13 from abroad10——
2 · Structures8bids · 8 electronic · 8 from abroad6——
3 · Harbour, Flood and Coastal5bids · 5 electronic · 5 from abroad3——

Contracting authority & participating public bodies

Fife Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services SCO64413 Bankhead Central 1, Glenrothes, Scotland, KY7 6GHContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Institute of Civil EngineersMediation body GlasgowContact email, phone
  • Sheriff Court KirkcaldyReview bodyReview contact point KirkcaldyContact email, phone

Framework contractors & participating bidders

11 commercial parties on the notice

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria