Official UK procurement notice
FEW1153 - Development Agreement Plot 3a-c Exploration Drive, Leicester
Authority: Leicester City Council (Local council)
Re-procurement plannedLeicester Station - Development Works · tender expected
What is being bought
Published requirement descriptionThe Dock 3 scheme will deliver approx. 6,000sq.m of commercial space. This space will be approx. 4,000sq.m of offices in 2 buildings and 2,000sq.m of industrial space in a terrace of 9 units. The accommodation will be delivered on a turnkey basis and will be net carbon zero operationally
CPV: Architectural, construction, engineering and inspection services · Construction work
The lotProcurement structure
single lot · no lot value publishedProcedure terms & legal framework
From the official record- Procedure method
- Award procedure without prior publication of a call for competition
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Direct award (no call for competition)
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 22 Jul 2022, 09:00 BST
- Last source update
- 22 Jul 2022, 09:00 BST
- Authority reference
DN623372- FTS notice number
2022/S 000-019966- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0354a6Find a Tender
- Why no open competition
The works, supplies or services can be provided only by a particular economic operator due to protection of exclusive rights, including intellectual property rights
- Published justification
The supplier has the benefit of an option over part of the site. The option gives them a contractual right to acquire the land and bring forward its redevelopment. To carry out the further development of Dock 3 – this is based on the way in which the site is being developed such that the proposed terrace of office units’ straddle both the existing site and the land the subject of the option. The supplier was commissioned to carry out design, enabling and other works to the whole site. To appoint a developer following the completion of those works would thereby incur a time delay, in understanding the site. It is likely the buildings on site will be heated by a series of ground source heat pumps. This sort of technical approach will only work on a site-wide basis. Surface water drainage to serve the site, also requires a site-wide approach. Finally, there are other practical issues in having two developers working on the same site. We understand that it in particular the developers would need to agree on how and when levels would be tied up and how and when they would work adjacent to each other on a tight site. Dock 2 was built out with the compound on the adjacent site which is the subject site here. There is no adjacent land left. If one developer develops the site, they are going to need to move a compound around. If there are two developers, it will be very difficult to have two compounds moving around a 3-acre site during a tight development programme.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Brackley Property Developments Limited | £14,250,000 † | — | Awarded |
Contracts
Contract 019966-2022-FEW1153-1 · Brackley Property Developments Limited
- Signed
- 21 Jul 2022
- Value
- £14,250,000
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 1bids · 0 electronic | 1 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Construction and Technology Court (Queens Bench Division)Review body
Bidders & participating suppliers
1 commercial party on the notice- BRACKLEY PROPERTY DEVELOPMENTS LIMITEDAwarded supplier
Official documents & specifications