Official UK procurement notice
FA08-03 - SEWERAGE REPAIR AND MAINTENANCE
Authority: NORTHUMBRIAN WATER LIMITED (Public body)
What is being bought3 lots · detail below
Published requirement descriptionThe Client is looking to either appoint one Contractor (full Northumbrian Water Operating region) or two Contractors (one in the North and one in the South of the Northumbrian Water Operating Region) to deliver reactive sewerage repair and maintenance services.
The scope includes, but is not limited to, reactive repairs and maintenance (including alterations and enhancements) of approximately 30,000km of the Client's sewerage network. This includes reactive attendance to all customer reported issues and subsequent maintenance.
The services will largely be reactive emergency services in response to customer contacts and other short-term work where there is an immediate and repeated adverse impact on customer service or other serviceability measures.
This entails the provision of 24/7/365 emergency call out cover for all customer reported issues which could include:
- Internal, external, highway and other flooding
- Pollution
- Odours
- Blockages
- Collapses
-Dangerous manholes
The Client's in-house Technical Support team will attend the majority of flooding contacts and all reported pollution contacts as well as any others deemed necessary alongside the crew to oversee the resolution of the issue, complete root cause analysis and communicate with the customer. Investigations undertaken will often include looksee CCTV, dye testing, locating manholes, cleansing, root cutting and proactive mapping.
Following the initial reactive attendance further remedial or investigation work may be required this may include:
- Further investigation encompassing network tracing, dye testing
- CCTV including probe and mark
- Sewer cleansing
- Ultra high-pressure jet cutting or use of specialist cutting equipment such as Picote, Bladder or robotic cutters
- Root cutting
- Drawdowns
- Rod retrievals
Any activity which identifies as causing a potential risk of flooding from operations, all employees must follow strict mitigation procedures outlined by the Client, this may include:
- Bunging connections
- Wrapping toilets
- Venting manholes
- Drawdowns
- Use of alternative methods such as rodding
If required sewer repairs are undertaken, this may include:
- Dig down repairs
- Emergency burst rising main repairs
- Trenchless patch or lining repairs
- Pipe bursting
- Minor building over sewer diversions
- New manholes, manhole repairs, manhole cover and frame replacement and/or repairs
- Manhole trap removal
- Minor pipe-bridge & sewer outfall repairs
In any instance where a repair disrupts or damages the ground surface this area will be replaced like for like.
Other services where required may include, but are not limited to:
- Large clean ups which may involve removal of contaminated material
- Vegetation clearance
- Landscaping
- Pump hire and overpumping hire and set-up
- Security
- Site set-up activities which may include provision and installation of track mats etc
- Provision and installation of pollution mitigation measure such as straw bales and booms
- Specialist CSO maintenance services
- Fabrication and installation of specialist ironworks such as penstocks or gattic covers
Contractors(s) will be required to use the Client's apps and systems. They will be required to follow processes for updating these and recording asset information.
All planning and necessary customer service activity is to be undertaken by the Contractor(s).
NWL will either award to Lot 1 and 2, or Lot 3 only. This will be assessed using an objective mechanism which will be detailed in the tender documents.
CPV: Drainage works · Pipelaying construction work · Sewer construction work · Sewerage work
How this framework works
From the published notice- Places
- up to 1 suppliers
Lots and requirements (3)Procurement structure
3 lots · all with a published valueEvery one of these 2 lots carries the same published figure, £80,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1North of Northumbrian Water Operating RegionRenewalceiling above
Lot 1 covers the provision of the works in the North of Northumbrian Water's operating region. Map of regions are in the tender documents.
The scope includes, but is not limited to, reactive repairs and maintenance (including alterations and enhancements) of approximately 14,000km of the Client's sewerage network. This includes reactive attendance to all customer reported issues and subsequent maintenance.
The services will largely be reactive emergency services in response to customer contacts and other short-term work where there is an immediate and repeated adverse impact on customer service or other serviceability measures.
This entails the provision of 24/7/365 emergency call out cover for all customer reported issues which could include:
- Internal, external, highway and other flooding
- Pollution
- Odours
- Blockages
- Collapses
-Dangerous manholes
The Client's in-house Technical Support team will attend the majority of flooding contacts and all reported pollution contacts as well as any others deemed necessary alongside the crew to oversee the resolution of the issue, complete root cause analysis and communicate with the customer. Investigations undertaken will often include looksee CCTV, dye testing, locating manholes, cleansing, root cutting and proactive mapping.
Following the initial reactive attendance further remedial or investigation work may be required this may include:
- Further investigation encompassing network tracing, dye testing
- CCTV including probe and mark
- Sewer cleansing
- Ultra high-pressure jet cutting or use of specialist cutting equipment such as Picote, Bladder or robotic cutters
- Root cutting
- Drawdowns
- Rod retrievals
Any activity which identifies as causing a potential risk of flooding from operations, all employees must follow strict mitigation procedures outlined by the Client, this may include:
- Bunging connections
- Wrapping toilets
- Venting manholes
- Drawdowns
- Use of alternative methods such as rodding
If required sewer repairs are undertaken, this may include:
- Dig down repairs
- Emergency burst rising main repairs
- Trenchless patch or lining repairs
- Pipe bursting
- Minor building over sewer diversions
- New manholes, manhole repairs, manhole cover and frame replacement and/or repairs
- Manhole trap removal
- Minor pipe-bridge & sewer outfall repairs
In any instance where a repair disrupts or damages the ground surface this area will be replaced like for like.
Other services where required may include, but are not limited to:
- Large clean ups which may involve removal of contaminated material
- Vegetation clearance
- Landscaping
- Pump hire and overpumping hire and set-up
- Security
- Site set-up activities which may include provision and installation of track mats etc
- Provision and installation of pollution mitigation measure such as straw bales and booms
- Specialist CSO maintenance services
- Fabrication and installation of specialist ironworks such as penstocks or gattic covers
Contractors(s) will be required to use the Client's apps and systems. They will be required to follow processes for updating these and recording asset information.
All planning and necessary customer service activity is to be undertaken by the Contractor(s).
NWL will either award to Lot 1 and 2, or Lot 3 only. This will be assessed using an objective mechanism which will be detailed in the tender documents. Additional information: NWL will either award to Lot 1 and 2, or Lot 3 only. This will be assessed based on best value to the Client, using an objective mechanism which will be detailed in the tender documents.
Best value will be determined by the most commercially advantageous bid, subject to achieving a number of minimum quality thresholds.
Lot #2South of Northumbrian Water's Operating RegionRenewalceiling above
Lot 2 cover the provision of the works in the South of Northumbrian Water's operating region. Map of regions are in the tender documents
The scope includes, but is not limited to, reactive repairs and maintenance (including alterations and enhancements) of approximately 16,000km of the Client's sewerage network. This includes reactive attendance to all customer reported issues and subsequent maintenance.
The services will largely be reactive emergency services in response to customer contacts and other short-term work where there is an immediate and repeated adverse impact on customer service or other serviceability measures.
This entails the provision of 24/7/365 emergency call out cover for all customer reported issues which could include:
- Internal, external, highway and other flooding
- Pollution
- Odours
- Blockages
- Collapses
-Dangerous manholes
The Client's in-house Technical Support team will attend the majority of flooding contacts and all reported pollution contacts as well as any others deemed necessary alongside the crew to oversee the resolution of the issue, complete root cause analysis and communicate with the customer. Investigations undertaken will often include looksee CCTV, dye testing, locating manholes, cleansing, root cutting and proactive mapping.
Following the initial reactive attendance further remedial or investigation work may be required this may include:
- Further investigation encompassing network tracing, dye testing
- CCTV including probe and mark
- Sewer cleansing
- Ultra high-pressure jet cutting or use of specialist cutting equipment such as Picote, Bladder or robotic cutters
- Root cutting
- Drawdowns
- Rod retrievals
Any activity which identifies as causing a potential risk of flooding from operations, all employees must follow strict mitigation procedures outlined by the Client, this may include:
- Bunging connections
- Wrapping toilets
- Venting manholes
- Drawdowns
- Use of alternative methods such as rodding
If required sewer repairs are undertaken, this may include:
- Dig down repairs
- Emergency burst rising main repairs
- Trenchless patch or lining repairs
- Pipe bursting
- Minor building over sewer diversions
- New manholes, manhole repairs, manhole cover and frame replacement and/or repairs
- Manhole trap removal
- Minor pipe-bridge & sewer outfall repairs
In any instance where a repair disrupts or damages the ground surface this area will be replaced like for like.
Other services where required may include, but are not limited to:
- Large clean ups which may involve removal of contaminated material
- Vegetation clearance
- Landscaping
- Pump hire and overpumping hire and set-up
- Security
- Site set-up activities which may include provision and installation of track mats etc
- Provision and installation of pollution mitigation measure such as straw bales and booms
- Specialist CSO maintenance services
- Fabrication and installation of specialist ironworks such as penstocks or gattic covers
Contractors(s) will be required to use the Client's apps and systems. They will be required to follow processes for updating these and recording asset information.
All planning and necessary customer service activity is to be undertaken by the Contractor(s).
NWL will either award to Lot 1 and 2, or Lot 3 only. This will be assessed using an objective mechanism which will be detailed in the tender documents. Additional information: NWL will either award to Lot 1 and 2, or Lot 3 only. This will be assessed based on best value to the Client, using an objective mechanism which will be detailed in the tender documents.
Best value will be determined by the most commercially advantageous bid, subject to achieving a number of minimum quality thresholds.
Lot #3Northumbrian Water's Full Operating Region (North & South)RenewalPublished value£160,000,000
Lot 3 covers the provision of the works in Northumbrian Water's full operating region (North & South). Map of regions are in the tender documents
The scope includes, but is not limited to, reactive repairs and maintenance (including alterations and enhancements) of approximately 30,000km of the Client's sewerage network. This includes reactive attendance to all customer reported issues and subsequent maintenance.
The services will largely be reactive emergency services in response to customer contacts and other short-term work where there is an immediate and repeated adverse impact on customer service or other serviceability measures.
This entails the provision of 24/7/365 emergency call out cover for all customer reported issues which could include:
- Internal, external, highway and other flooding
- Pollution
- Odours
- Blockages
- Collapses
-Dangerous manholes
The Client's in-house Technical Support team will attend the majority of flooding contacts and all reported pollution contacts as well as any others deemed necessary alongside the crew to oversee the resolution of the issue, complete root cause analysis and communicate with the customer. Investigations undertaken will often include looksee CCTV, dye testing, locating manholes, cleansing, root cutting and proactive mapping.
Following the initial reactive attendance further remedial or investigation work may be required this may include:
- Further investigation encompassing network tracing, dye testing
- CCTV including probe and mark
- Sewer cleansing
- Ultra high-pressure jet cutting or use of specialist cutting equipment such as Picote, Bladder or robotic cutters
- Root cutting
- Drawdowns
- Rod retrievals
Any activity which identifies as causing a potential risk of flooding from operations, all employees must follow strict mitigation procedures outlined by the Client, this may include:
- Bunging connections
- Wrapping toilets
- Venting manholes
- Drawdowns
- Use of alternative methods such as rodding
If required sewer repairs are undertaken, this may include:
- Dig down repairs
- Emergency burst rising main repairs
- Trenchless patch or lining repairs
- Pipe bursting
- Minor building over sewer diversions
- New manholes, manhole repairs, manhole cover and frame replacement and/or repairs
- Manhole trap removal
- Minor pipe-bridge & sewer outfall repairs
In any instance where a repair disrupts or damages the ground surface this area will be replaced like for like.
Other services where required may include, but are not limited to:
- Large clean ups which may involve removal of contaminated material
- Vegetation clearance
- Landscaping
- Pump hire and overpumping hire and set-up
- Security
- Site set-up activities which may include provision and installation of track mats etc
- Provision and installation of pollution mitigation measure such as straw bales and booms
- Specialist CSO maintenance services
- Fabrication and installation of specialist ironworks such as penstocks or gattic covers
Contractors(s) will be required to use the Client's apps and systems. They will be required to follow processes for updating these and recording asset information.
All planning and necessary customer service activity is to be undertaken by the Contractor(s).
NWL will either award to Lot 1 and 2, or Lot 3 only. This will be assessed using an objective mechanism which will be detailed in the tender documents. Additional information: NWL will either award to Lot 1 and 2, or Lot 3 only. This will be assessed based on best value to the Client, using an objective mechanism which will be detailed in the tender documents.
Best value will be determined by the most commercially advantageous bid, subject to achieving a number of minimum quality thresholds.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Legal form for consortia
- Upon award, any bidders who submitted as a Joint Venture (JV) must be incorporated with joint and several liability and cross indemnities. For non-incorporated JVs or newly proposed JVs, please refer to the PQQ instructions for guidance on how to submit. NWL reserve the right to reject an application where insufficient evidence and detail is provided to give NWL confidence in the proposed JV.
- “FA08-03 - SEWERAGE REPAIR AND MAINTENANCE” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 28 Jun 2024, 13:17 BST
- Last source update
- 28 Jun 2024, 13:17 BST
- Authority reference
FA08-03- FTS notice number
2024/S 000-019809- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-047866Find a Tender
Publisher note: Applicants are asked to note that this procurement process will be conducted electronically with all documents and communications being managed through the Northumbrian Water eSourcing Spend Management portal called 'Ariba'. Expressions of interest for this tender must be sent to the e-mail address [email protected] before the deadline of 19 July 2024 at 12 noon. Once expression of interest has been received that contains the details below, applicants will be given access to the Ariba portal within 48 hours from request. This portal will contain all the tender documents associated with this procurement that are available at the time. The deadline for the return of the completed PQQ is 26 July 2024 at 12 noon. When sending expression of interest, applicants must provide the following information: 1) Full Company Name 2) Main contact details of the person who will be given access to the Ariba portal - Name, job title, e-mail address and telephone.
How it was run
Official notice- Appointment period ends
- 19 Jul 2024, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Deposits and guarantees
If the Dun and Bradstreet credit rating returns a rating of 'above average risk' or 'high risk', the contracting entity will request further financial information for review and a parent company guarantee or performance bond may be required.
Timeline
28 Jun 2024 → 19 Jul 2024 · 2 dates- Notice published28 Jun 2024, 13:17 BST
- Admission / appointment period endsperiod end, not a bid countdown19 Jul 2024, 12:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- NWL Legal DepartmentReview body
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria