Find a TenderPast planning notice
Published 16 Aug 2021, 22:45 BST

Official UK procurement notice

Energy Storage Systems · UK public procurement notice

Official notice

Authority: Highways England

Goods
Planned pipeline value£60,000,000pipeline notice, not a live tender
Tender notice expected 8 Mar 2022from the planned procurement notice

What is being bought

Published requirement description

Highways England is developing a procurement strategy to procure the supply, installation and maintenance of Energy Storage Systems throughout England. Energy Storage Systems deliver temporary provision of supplementary electricity capacity as well as load balancing (decreasing demands on the permanent electricity networks) at various locations without upgrade of supply, in accordance with Highways England’s standards and objectives. Initial thinking is that such Energy Storage Systems will have capacity of between 0.5MW and 2.5MW at each location targeted.

Once procured, the first project utilising this contract will contribute to the Government’s commitment of a minimum of six high powered electric vehicle charge points at all Motorway Service Areas (MSA) in England by 2023 by enabling rollout at locations where existing DNO (Distribution Network Operator) or National Grid capacity is insufficient to support delivering the commitment within the required timescales up to the estimated value of £11m (Tranche 1), and the cost of adding new capacity is commercially unviable. This market engagement seeks to discuss both specification and service requirement with contractors to fully develop the procurement strategy prior to tender.

CPV: Batteries · Battery chargers · Construction materials · Construction materials and associated items · Construction work for power plant · Electrical apparatus for switching or protecting electrical circuits · Electrical circuit components · Electrical equipment and apparatus · Electrical installation work · Electrical installation work of electrical distribution apparatus · Electrical installation work of heating and other electrical building-equipment · Electrical parts of machinery or apparatus · +8 more

The lotProcurement structure

single lot · no lot value published
Lot #1Highways England is exploring opportunities to set up a contract, potentially an…Planned

Highways England is exploring opportunities to set up a contract, potentially an enabled framework, for the supply, installation and maintenance of Energy Storage Systems throughout England. The solution is to deliver temporary provision of supplementary electricity capacity as well as load balancing (decreasing demands on the permanent electricity networks) without upgrade of supply, in accordance with Highways England’s standards and objectives. Initial thinking is that such Energy Storage Systems will have capacity of between 0.5MW and 2.5MW at each location targeted.

Highways England’s objective is for this to contribute to the Government’s commitment of a minimum of six high powered electric vehicle charge points at all MSAs in England by 2023 by enabling rollout at locations where DNO (Distribution Network Operator) or National Grid capacity is insufficient to support delivering the commitment within the required timescales up to the value of £11m (Tranche 1). The full specification of our requirements will be released with tender documentation.

Delivery: UK · Sites throughout England which are yet to be specified.

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
16 Aug 2021, 22:45 BST
Last source update
16 Aug 2021, 22:45 BST
FTS notice number
2021/S 000-020012
Classification (CPV)
BatteriesBattery chargersConstruction materialsConstruction materials and associated itemsConstruction work for power plantElectrical apparatus for switching or protecting electrical circuitsElectrical circuit componentsElectrical equipment and apparatusElectrical installation workElectrical installation work of electrical distribution apparatus
+10 moreElectrical installation work of heating and other electrical building-equipmentElectrical parts of machinery or apparatus
Delivery area
UK
Official registry OCID
ocds-h6vhtk-02d59a Find a Tender

Publisher note: Early Engagement Highways England wishes to engage early with potential suppliers, through a series of virtual meetings and possible visits (dependent upon Covid restrictions). The aim of which is to develop the specification and procurement strategy to enable multiple bodies to procure a variety of size options for this unit. Initial thinking is that such Energy Storage Systems will have capacity of between 0.5MW and 2.5MW at each location targeted. The potential value of the contract is up to a maximum of £60m over a 4-year period. The procurement will take place in tranches. Tranche 1 –estimated up to £11m to meet the requirements for the first project, procured directly by Highways England for the supply of units to Motorway Service Areas, for which specific locations are yet to be determined. Highways England’s aim is that following early engagement with the supply chain, an efficient and effective commercial model that works for all stakeholders will be developed, culminating in a more accurate estimate of the contract value in readiness for the invitation of tenders. Appointment times will be limited, therefore please only register your interest if your company can fulfil the requirements and may be interested in tendering for this opportunity. To register your interest in a first meeting during week commencing 13 September, please email Laurence Potts at [email protected] by 8 September 2021.

How it was run

Official notice
Submission deadline
—

Timeline

16 Aug 2021 → 8 Mar 2022 · 2 dates
  1. Notice published
    16 Aug 2021, 22:45 BST
  2. Tender notice expected
    8 Mar 2022

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Highways England

Contracting authorityNational or federal agency/officeGeneral public services Bridge House, 1 Walnut Tree Close, Guildford, UK, GU1 4LZContact email

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.