Electricity Distributors Network Supplier Framework
Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)
What is being bought
Published requirement descriptionNetwork Rail (NR) owns, operates and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's largest stations while all the others, over 2,500, are managed by the country’s train operating companies.
NR are undertaking a Decarbonisation/ Energy Efficiency Programme across a range of assets in all UK Regions. This project is part of the Decarbonisation Programme aimed at supporting NR to meet its targets for zero carbon emissions as part of the Government’s Road to Zero strategy.
The NR Targets
- Net Zero by 2050 (2045 in Scotland) – Government declared Climate Emergency
- 40% Carbon reduction in the next five years.
To help meet these targets NR aim to set up a framework agreement with electricity distributors network suppliers. NR has a large portfolio of sites that will require various power capacity upgrades or connections to achieve its net zero targets. Feasibility studies are currently being carried out and various sites have been identified which may require an upgrade to accommodate the additional power requirements for charging EV vehicles, transition from gas use to electric or to enable the connection of renewables.
Works will be procured on a site-by-site basis. Detailed documents indicating the extent of the Works, performance requirements and technical standards for each call off will be developed by NR Engineers.
Our objective is to establish a framework with suppliers capable of delivering contestable works across the electricity distribution network for the delivery of power upgrades in line with NR project management governance, namely PACE phases 2-4 (delivery programme).
Interested suppliers should register at networkrail.bravosolution.co.uk ↗ and register an interest in pqq_3400 and itt_16662.
Suppliers must register for both PQQ and ITT and respond to both.
CPV: Electrical power systems design services · Electricity distribution and control apparatus · Power distribution cables
How this framework works
From the published notice- Places
- up to 20 suppliers
The lotProcurement structure
single lot · value publishedLot #1Published value£45,000,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
Suppliers must hold an OFGEM Licence to work on the UK electricity distribution system.
- “Electricity Distributors Network Supplier Framework” is a framework: the contest is a place on its panel, up to 20 suppliers, not a single contract.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 24 May 2024, 17:28 BST
- Last source update
- 24 May 2024, 17:28 BST
- Award evaluation window
- 24 Jun 2024 – …
- FTS notice number
2024/S 000-016534- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-046b8bFind a Tender
- Electronic trading
- e-invoicing allowed · electronic payment
How it was run
Official notice- Appointment period ends
- 24 Jun 2024, 11:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Bids opened
- 24 Jun 2024, 15:00 BST
Timeline
24 May 2024 → 24 Jun 2024 · 3 dates- Notice published24 May 2024, 17:28 BST
- Admission / appointment period endsperiod end, not a bid countdown24 Jun 2024, 11:00 BST
- Bids opened24 Jun 2024, 15:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- The High Court of England and WalesReview body
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria