Find a TenderAwarded
Published 29 Apr 2026, 12:12 BST

Official UK procurement notice

Dogger Bank South (East) · UK public procurement notice

Official notice

Authority: The Crown Estate (Public body)

Services
Awarded value£1published contract · exc. VAT
Awarded 17 Jan 2023
Awarded to RWE Renewables UK Dogger Bank South (East) Limited

What is being bought

Published requirement description

No description was published on the notice. See the official documents.

CPV: Electricity · Electricity, heating, solar and nuclear energy · Offshore installation services · Wind turbines

The lotProcurement structure

single lot · no lot value published
Lot #1

This notice relates to the modification of a concession contract for the award of seabed rights for the development, construction and operation of an offshore wind farm which was entered into by The Crown Estate and RWE Renewables UK Dogger Bank South (East) Limited on 17 January 2023, following the completion of The Crown Estate’s Offshore Wind Leasing Round 4 process.

Delivery: UK

Procedure terms & legal framework

From the official record
Legal basis
CELEX · 32014L0023 Concession Contracts Regulations 2016 (Directive 2014/23/EU)
Procurement category
Services
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
29 Apr 2026, 12:12 BST
Last source update
29 Apr 2026, 12:12 BST
FTS notice number
2026/S 000-039119
Classification (CPV)
ElectricityElectricity, heating, solar and nuclear energyOffshore installation servicesWind turbines
Delivery area
UK
Official registry OCID
ocds-h6vhtk-068dda Find a Tender

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £11 contract exc. VAT
Contracts signed 1latest 17 Jan 2023
Awarded toValueDateStatus
RWE Renewables UK Dogger Bank South (East) Limited£1 †—Awarded

Contracts

  • Dogger Bank South (East) · RWE Renewables UK Dogger Bank South (East) Limited

    Signed
    17 Jan 2023
    Value
    £1
    Status
    active
    • Change The modifications to the contract which are the subject of this notice are that for a period up to the expiration of the option in the Agreement for Lease, (i) developers will pay pro rata monthly, rather than annual, option fee payments with a balancing payment due on completion of the Lease pursuant to the Agreement for Lease. That balancing payment will be equal to the annual Option Fee which would have been payable in respect of the relevant year less the monthly payments actually made in that year; and (ii) the Agreement for Lease may be terminated without payment of the break payment, and with no Option Fee balancing payment. The Crown Estate considers that these changes are required due to circumstances which it was not possible to foresee at the time of the original award., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The contract needs to be modified due to circumstances which The Crown Estate could not have foreseen and is being modified in accordance with the requirements of regulation 43(1)(c) of the Concession Contracts Regulations 2016. The modifications were made necessary by the following unforeseeable circumstances: (a) The abrupt change in the HVDC transmission infrastructure supply chain supply/demand profile. (b) Change to the Grid Connection processes (Holistic Network Design, followed by Connections Reform) which required more reinforcement works, themselves being subject to planning permission. (c) Additionally to each of the individual unforeseen circumstances set out above, a change to environmental compensation requirements, including increased requirements of statutory nature bodies, and the introduction of the Marine Recovery Fund route to compensation. The first limb of the unforeseeable circumstances test is therefore met. The second limb of the unforeseeable circumstances test is satisfied as there is no alteration to the overall nature of the contract, which will remain a public services concession. The object and purpose of the contract will remain the same under the modifications. The third limb of the unforeseeable circumstances test is also satisfied as the modifications will not exceed 50% of the value of the original concession contract.

Contracting authority & participating public bodies

The Crown Estate

Contracting authorityPublic body 1 St James's Market, London, UKContact email

Dispute resolution & review bodies

  • Royal Courts of JusticeReview body London

Bidders & participating suppliers

2 commercial parties on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.