Design, install, operate and maintain Solar PV Canopy & EV Infrastructure - Concession
Authority: Rotherham Metropolitan Borough Council (Local council)
What is being bought
Published requirement descriptionThe Council is looking to appoint a concessionaire to design, install, maintain, operate and manage a Solar PV canopy and EV Charging infrastructure at Drummond Street car park with local connection infrastructure assets and possible battery storage (subject to design and consumption studies).
The Council is seeking proposals for a minimum inventory of EV charging infrastructure consisting of:
20 Bays Fast 7kW plus a further 20 bays pre-provisioned with ducting for expansion;
4 bays Rapid 50kW DC; and
4 bays Ultra-rapid 200kW DC.
CPV: Car park building construction work · Car park control equipment · Chargers · Civic-amenity services · Electrical installation work · Engineering works and construction works · Installation services of electrical and mechanical equipment · Site preparation work · Solar energy · Structural steel erection work · Structural steel erection work for structures
The lotProcurement structure
single lot · no lot value publishedLot #1The Council have been awarded a grant from the Local Electric Vehicle Infrastructure…
The Council have been awarded a grant from the Local Electric Vehicle Infrastructure (LEVI) Pilot fund to develop a Solar PV Canopy and connection infrastructure at Drummond Street Car Park. S65 1HP. This also requires private sector investment (minimum £330,000 ex. vat) to install and run an EV Charging concession as part of the project.
Drummond Street Car Park is a 240-space pay-and-display surface car park well used by commuters and shoppers. It is situated on the edge of Rotherham Town Centre, across the road from the central markets complex and has approximately 2000 households within a ten-minute walk time. The main town taxi rank is conveniently accessible from the car park and is approximately 200m away, as is the A630 with an annual average daily flow of 35,158 vehicles (2023).
An initial Request for Information (RFI) related to this project was issued in March 2023 and the information provided was extremely helpful. More recently a second RFI was issued for further clarification from the market (Notice reference 2024/S 000-040487).
The fixed budget for the Design & Build of the Solar PV Canopy is £1,050,000 excluding VAT.
Supplier minimum contribution for EV Infrastructure is £330,000 excluding VAT.
EV Charging revenue estimate for the proposed 15 year period is £4.158M excluding VAT.
Total contract value is £5.208M excluding VAT, £6.250M inclusive of VAT.
The contract value has been calculated by reference to the potential revenue that the Council considers could be collected by the Concessionaire through the provision of the Services for the entire contract duration. However, the value of the Contract is ultimately dependent on the vagaries of the market and the above income figure does not carry any guarantee of value or volume of business over the contract term.
Further detail can be found within the tender documents which can be accessed for free via uk.eu-supply.com/login.asp ↗
If you experience technical issues surrounding the use of the YORtender system you should request support from the system provider (Mercell) by logging a ticket at email: [email protected] or telephone: 0800 840 2050. Please note office working hours are 09:00 - 17:00.
This Contract is being tendered in accordance with the Concession Contracts Regulations 2016 as amended ("CCR 2016"). Under Regulation 30 of the CCR 2016, contracting authorities have the freedom to organise the procedure leading to the choice of Concessionaire. On that basis, the Authority is undertaking a single stage procurement process which is similar to the Open Procedure. Additional information: The design and install element of the project is expected to take up to 12 months.
The operation of the concession contract term is 15 years.
Part of the procurement documents are currently available for unrestricted and full direct access, free of charge, at yortender.eu-supply.com/login.asp ↗ and the remaining documents will be uploaded in the course of the next week, w/c 24/02/2025
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
Please refer to the tender documentation
Procedure terms & legal framework
From the official record- Legal basis
- CELEX · 32014L0023 Concession Contracts Regulations 2016 (Directive 2014/23/EU)
- Procurement category
- Services
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 10 Mar 2025, 15:44 GMT
- Last source update
- 2 Jun 2025, 17:18 BST
- Authority reference
22-294- FTS notice number
2025/S 000-029310- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04e5e8Find a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
How it was run
Official notice- Submission deadline
- 16 Jun 2025, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
Timeline
2 Jun 2025 → 16 Jun 2025 · 2 dates- Notice published2 Jun 2025, 17:18 BST
- Submission deadline16 Jun 2025, 12:00 BST
Notice history
3 events · 6 releases on Find a Tender · since 1 May 2025- Published value published: £5,207,9901 May 2025, 09:45 BST
- Status changed to active1 May 2025, 09:45 BST
- Deadline moved to 14 Apr 2025, 12:00 BST1 May 2025, 09:45 BST-14 days · was 28 Apr 2025
Published amendments (5 · 5 deadline changes)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | DeadlineDate · IV.2.2 | 14 Apr 2025 | 28 Apr 2025 | +14 d |
| — | DeadlineDate · IV.2.2 | 28 Apr 2025 | 12 May 2025 | +14 d |
| — | DeadlineIV.2.2 | 12 May 2025 | 2 Jun 2025 | +21 d |
| — | DeadlineDate · IV.2.2 | 2 Jun 2025 | 9 Jun 2025 | +7 d |
| — | DeadlineIV.2.2 | 9 Jun 2025 | 16 Jun 2025 | +7 d |
Bid deadline extended from 14th April to 28th April 2025 at 12 noon.
Deadline for clarifications extended to 06/05/2025 at 17:00 Deadline for the publication of responses to the clarification questions extended to 07/05/2025 at 17:00
3 amendments published without a description.
Routine re-releases (6)
- 2025-05: 1 release · 1 May 2025
- 2025-04: 1 release · 17 Apr 2025
- 2025-03: 1 release · 10 Mar 2025
Contracting authority & participating public bodies
Dispute resolution & review bodies
- High CourtReview body
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria