Depot Plant Replacement · UK public procurement notice
Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)
The Supply, Maintenance and Repair of Plant and attachment's for us at Network Rail's Material Handling Depots and Aggregate Handling Depots. Published lot titles: Material Handlers, Loading Shovels, Articulated Dump Trucks and Attachments; Telehandlers; Forklifts.
What is being bought3 lots · detail below
Published requirement descriptionThe Supply, Maintenance and Repair of Plant and attachment's for us at Network Rail's Material Handling Depots and Aggregate Handling Depots
CPV: Industrial machinery
How this framework works
From the published notice- Places
- up to 1 suppliers
Lots and requirements (3)Procurement structure
3 lots · 2 with a published valueLot #1Material Handlers, Loading Shovels, Articulated Dump Trucks and AttachmentsPublished value£20,710,000
The Supply, Maintenance and Repair of Material Handlers, Loading Shovels, Articulated Dump Trucks and Attachments
Lot #2TelehandlersPublished value£900,000
The Supply, Maintenance and Repairs of Telehandlers
Lot #3ForkliftsLot estimate not published
The Supply, Maintenance and Repair of Forklifts
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
Network Rail has a requirement to renew the current life expired fleet materials handling plant which works within the Supply Chain Operations facilities.
This programme intends to deliver new and sustainable MHPs with Safety, Reliability and Maintainability designed into the equipment.
The intention is for this to be future proof in-terms of hardware and software as well as the alignment with programs such as decarbonisation. in line with the new NR specification
(NR/SP/6121
- Shortlisting
- Price is not the only award criterion and all criteria are stated only in the procurement documents
- “Depot Plant Replacement” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Goods
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 10 Mar 2022, 22:45 GMT
- Last source update
- 10 Mar 2022, 22:45 GMT
- Authority reference
project_29749- FTS notice number
2022/S 000-006647- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-032091Find a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Review procedure
Network Rail will incorporate a minimum 10 calendar day standstill period at the point when the information on the award of the contract, is communicated to tenderers.
Applications/tenderers who are unsuccessful shall be informed by Network Rail as soon as possible after the decision has been made as to the reasons why the applicant/tenderer was unsuccessful.
If an appeal regarding the award of the contract has not been successfully resolved, the Utilities Contracts Regulations 2016 provide for aggrieved parties who have been harmed or are at risk of harm by breach of the rules to take legal action. Any such action must be brought within the applicable limitation period. Where a contract has not been entered into, the Court may order the setting aside of the award decision or order for any documents to be amended. The purpose of the standstill period referred to above is to allow the parties to apply to the Courts to review the award decision before the contract is entered into
How it was run
Official noticeTender documents are also served through a separate tool: http://www.networkrail.bravosolution.co.uk ↗
- Appointment period ends
- 14 Apr 2022, 12:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 90 days from the deadline
Timeline
10 Mar 2022 → 14 Apr 2022 · 2 dates- Notice published10 Mar 2022, 22:45 GMT
- Admission / appointment period endsperiod end, not a bid countdown14 Apr 2022, 12:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Royal Court LondonMediation bodyReview body
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria