Find a TenderAwarded without competition
Published 19 Jun 2023, 16:45 BST

Official UK procurement notice

Decarbonisation Programme - Project CoPPA

Official notice

Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)

GoodsAward procedure without prior publication of a call for competition
Awarded value£79,800,000published contract · exc. VAT
Awarded 16 Jun 2023no call for competition
Awarded to EDF Energy Renewables Ltd2 awards

What is being bought

Published requirement description

The procurement falls outside the scope of application of the regulations

Explanation:

This notice relates to a permitted modification to revise the price of a corporate power purchase agreement (the cPPA) originally awarded on 28 July 2022, following a competitive award process using the negotiated procedure in accordance with the Utilities Contracts Regulations 2016 (UCR). The cPPA is a national contract for the supply to NR of a target P50 volume of 63.8GWh per annum of renewable electricity for 15 years. The renewable electricity will be generated by a solar PV facility to be constructed, operated and maintained by the supplier. The solar PV facility will have a target installed capacity of 60 MWp ± 10%, with the supplier guaranteeing a minimum technical availability of 93%. The renewable electricity to be supplied to NR under the cPPA will be supplied on an "as available" basis using a sleeving arrangement with a third party licensed electricity supplier and the relevant volumes supplied will be utilised by NR's non-traction business (e.g. managed stations, offices and depots).

Please note that certain of the core supplier requirements referred to above differ from those listed in the contract award notice published on 19 August 2022 as the core supplier requirements stated herein represent the final core supplier requirements in the executed cPPA entered into between NR and the supplier on 28 July 2022.

The cPPA was made conditional on the supplier achieving a final investment decision (FID) by 31 March 2023 (FID Milestone Delivery Date).

Following a series of successive, substantial and unforeseen rises in the European Central Bank (ECB) interest rates for Main Refinancing Operations (fixed rate tenders) over the period from 30 November 2021 to 12 May 2022, the underlying financial model supporting the original cPPA pricing could no longer produce a return on investment for the supplier to reach FID.

Accordingly, the supplier has proposed, and NR has agreed to make, a revision to the total price of the cPPA that results in an increase of under 50%, from £53.32 million to £79.80 million. The price increase involves the ECB interest rates increasing from 0% in November 2021 to 3.75% in May 2023.. There will also be a new FID Milestone Delivery Date of 30 September 2023 in the revised cPPA.

NR is revising the cPPA through a variation agreement. The revision of the cPPA by NR is a permitted modification under the UCR. It is permitted by the exemption in Regulation 88(1)(c). For completeness, and to maximise transparency, NR will also publish a modification notice under Regulation 88(2) in due course after the variation agreement is entered into.

CPV: Electricity · Electricity, heating, solar and nuclear energy

The lotProcurement structure

single lot · no lot value published
Lot #1Decarbonisation Programme - Project CoPPA

This notice relates to a permitted modification to revise the price of a corporate power purchase agreement (the cPPA) originally awarded on 28 July 2022, following a competitive award process using the negotiated procedure in accordance with the Utilities Contracts Regulations 2016 (UCR). The cPPA is a national contract for the supply to NR of a target P50 volume of 63.8GWh per annum of renewable electricity for 15 years. The renewable electricity will be generated by a solar PV facility to be constructed, operated and maintained by the supplier. The solar PV facility will have a target installed capacity of 60 MWp ± 10%, with the supplier guaranteeing a minimum technical availability of 93%. The renewable electricity to be supplied to NR under the cPPA will be supplied on an "as available" basis using a sleeving arrangement with a third party licensed electricity supplier and the relevant volumes supplied will be utilised by NR's non-traction business (e.g. managed stations, offices and depots).

Delivery: UK · Throughout the UK

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Goods
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
19 Jun 2023, 16:45 BST
Last source update
27 Jul 2023, 15:43 BST
FTS notice number
2023/S 000-021864
Classification (CPV)
ElectricityElectricity, heating, solar and nuclear energy
Delivery area
UK
Official registry OCID
ocds-h6vhtk-03d7a7 Find a Tender
Why no open competition
The procurement falls outside the scope of application of the directive
Published justification

See II.2.4) Description of the procurement for explanation.

Publisher note: This notice relates to a permitted modification to revise the price of a corporate power purchase agreement (the cPPA) originally awarded on 28 July 2022, following a competitive award process using the negotiated procedure in accordance with the Utilities Contracts Regulations 2016 (UCR). A voluntary ex antre transparency notice in respect of this modification was published on 19 June (Reference: 2023/S 000-017404).

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 2
Awarded value £79,800,0001 contract exc. VAT
Contracts signed 2latest 16 Jun 2023
Awarded toValueDateStatus
EDF Energy Renewables LtdSubcontracting: declared——Awarded
EDF Energy Renewables Ltd£79,800,000 †—Awarded

Contracts

  • Contract 017404-2023-1 · EDF Energy Renewables Ltd

    Signed
    16 Jun 2023
    Value
    —
    Status
    active
  • Decarbonisation Programme - Project CoPPA · EDF Energy Renewables Ltd

    Signed
    16 Jun 2022
    Value
    £79,800,000
    Status
    active
    • Change See II.2.4) Description of the procurement for explanation., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: See II.2.4) Description of the procurement for explanation.

Contracting authority & participating public bodies

Network Rail Infrastructure Ltd

Contracting authorityCentral GovernmentRailway services 2904587 Waterloo General Offices, London, UK, SE1 8SWContact email, phone

Dispute resolution & review bodies

  • The High CourtReview body London

Bidders & participating suppliers

2 commercial parties on the notice
  • EDF Energy Renewables LtdAwarded supplier06456689 Alexander House, 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, UK, DH4 5RA
  • EDF Energy Renewables LtdAwarded supplier0645668 Alexander House, 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, UK, DH4 5RA

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.