Criterion Quay Flow Development Environmental and Consenting Work

Official notice

Authority: Milford Haven Port Authority (Public body)

Services
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected 25 Aug 2023from the planned procurement notice

What is being bought

Published requirement description

We expect that our current framework consultant will produce a scoping report. The tender for this work will cover the resulting EIA which we expect will cover a wide range of typical issues for a marine project in close proximity to a Special Area of Conservation

The consenting work is included in this package and will comprise obtaining consent from Pembrokeshire County Council and Natural Resources Wales. A Harbour Revision Order is not required for this work.

CPV: Environmental services · Infrastructure works consultancy services

The lotProcurement structure

single lot · no lot value published
Lot #1The Hobbs Point Floating Offshore Wind Development Project is envisioned to support…Planned

The Hobbs Point Floating Offshore Wind Development Project is envisioned to support the deployment of floating offshore wind infrastructure in the Celtic Sea. Delivery of this project will fortify the Pembroke Dock Marine project currently in development at Pembroke Dock, which is designed to create a world class centre for green energy development, acting as a catalyst for inward investment and the development of a regional Marine Centre of Excellence for current and future technology. Delivery of Hobbs Point Floating offshore wind will support the diversification of a strategic UK fossil fuel energy hub into a centre for the renewable energy industry. This will protect both the region and UK in terms of energy security, economy and inclusivity while also working towards achieving decarbonisation targets.

Milford Haven Port Authority (PoMH), as part of its ongoing programme of development at Pembroke Port (PP) intends to rebuild and expand a facility at Criterion Way/Criterion Quay, initially to support Floating Offshore Wind (FLOW) Test and Demonstration stage projects.

The currently envisaged works comprise the following:

  • Construction of a heavy lift jetty with associated mooring structures
  • Dredging (substantially in rock, some possibly requiring drilling and blasting)
  • Reclamation of about 2 Hectares of land over an intertidal area with anticipated beneficial use of the dredged material
  • Remediation of existing land
  • Surfacing of the reclaimed and remediated land with surface drainage

-Perimeter security fencing and gates- Installation of internal electricity supplies for lighting and heavy duty power

  • Provision of external services and connections
  • Small ancillary buildings
  • Environmental mitigation measures

The works are subject to grant funding which will have strict time limits.

Delivery: Wales · Pembroke Dock

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Services
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
10 Jul 2023, 08:51 BST
Last source update
10 Jul 2023, 08:51 BST
FTS notice number
2023/S 000-019562
Classification (CPV)
Environmental servicesInfrastructure works consultancy services
Delivery area
Wales (UKL1)
Official registry OCID
ocds-h6vhtk-03e018 Find a Tender

Publisher note: NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=133048. (WA Ref:133048)

How it was run

Official notice
Submission deadline
—

Timeline

10 Jul 2023 → 25 Aug 2023 · 2 dates
  1. Notice published
    10 Jul 2023, 08:51 BST
  2. Tender notice expected
    25 Aug 2023, 00:00 BST

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Milford Haven Port Authority

Contracting authorityPublic bodyPort Operations Gorsewood Drive, Milford Haven, Pembrokeshire, Wales, SA73 3ERContact email, phone

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.