CHARM Groundworks Tender Package

Buyer: ACCORD HOUSING ASSOCIATION LTD →

BuyerACCORD HOUSING ASSOCIATION LTD
StatusAwarded
DeadlineNot published
ValueValue not published
Published7 Jul 2021

What is being bought

This is a subcontracts package to carry out groundworks for the CHARM virtually plastic free homes in Redditch, Worcestershire. The main tender information is in the Invitation to Tender document (supplied in PDF and Word versions below).

Delivery location

UKG

Categories

Construction work 45000000Construction work 45000000

Lot details

Lot 1

The following works are to be included within the Groundworks package:- 1) Generally -All setting out is to be undertaken by the Sub-contractor. -Temporary roads -Stone for the Main Contractors compound and the maintenance of the same in accordance with the attached drawing -Tolerances - oversite concrete slab should be constructed within the following tolerances:- Line +/- 5mm Level +/- 5mm -All abnormals met by the sub-contractor in the course of undertaking the sub-contractworks shall be deemed to be included by the sub-contractor with the exception of breakingout rock met during excavations. A rate for this work to be submitted with the Tender. Any voids met during excavation works are to be collapsed and compacted. -To include pile setting out, proof testing of pile positions, removal of near surface obstructions. 2) Site Clearance -To include the removal of all trees not required within the final scheme. -Topsoil to be stripped and preserved on site. 3) Excavate to reduce levels -All excavation required in order to establish formation levels shall be included by the subcontractor. 4) Roads and Footpaths -Construct all adoptable and non-adoptable roads and associated footpaths in accordance with Engineers drawings. 5) Drainage -Construct all adoptable and non-adoptable drainage in accordance with Engineers recommendations. This is to include all final connections to existing drainage and domestic drainage to each plot. The foul plot connections will include all works up to and including the drainage through the slab. The rainwater plot connections shall include all works up to the connection to rainwater downpipes. -Any storm water drainage required in order to ensure the collection and dissipation of water collected on private drives and individual drives shall be included by the subcontractor. -Any diversion of existing drainage in order to facilitate new drainage works shall be included by the sub-contractor. -Land drains required to assist site drainage shall be included by the sub-contractor. 6) Substructures - Construct substructures in accordance with engineers drawings, including all drainage, service entries and insulation. The sub-contractor is to be responsible for supplying and laying the plastic pipework used from the Water Company stop tap to the stop tap within the dwelling. -All brickwork and blockwork below and including DPC shall be undertaken by the subcontractor including the provision of air vents. 7) Private drives and public car parking areas Construct all private and individual plot drives as detailed on the site layout. 8) Landscaping - The sub-contractor is to allow for cleaning around and removing from site any discarded building materials immediately following the dismantle of scaffolding; the completion of plasterboarding; prior to handover. - Topsoil to be imported if necessary should there be any deficiency between that required and amounts collected during site strip. - All landscape areas are to be graded and prepared to receive planting or turf where applicable. -All plot paths are to be constructed by the sub-contractor. These shall be constructed either in-situ or of pre-cast concrete slabs - see specification. In-situ paths to be brushed finish with trowelled margin and rounded edges. - The sub-contractor to allow for concreting and erection of a rotary line to each property. 9) Screen /Retaining Walls -The sub-contractor is to allow for forming the foundations to all screen and retaining walls. Further earthworks required in the formation of the retaining walls shall be allowed for by the sub-contractor. 10) Services -Allow for all excavation and associated works for services distribution. It is intended that a Common Services trench should be adopted thus minimising excavations. 11) Street Lighting Allow for all excavation, bedding and dusting materials in association with street lighting works. 12) Pruning / clipping Allow for pruning / clipping trees / shrubs as required. The sub-contractors estimate is to be analysed into the following elements:- 1) Preliminaries 2) Site Preparation 3) Roads 4) Footpaths 5) Road Drainage (all drainage beneath the road construction) 6) Mains Drainage (drainage not on plot or beneath the road) 7) Domestic Drainage (on plot drainage) 8) Services Installations (including Street Lighting) 9) Sub-structures 10) Private / Individual Drives, Parking Areas, Access Ways 11) Plot Paths and Paving 12) Screen Wall/ Retaining walls Foundations 13) Substation 14) Garden and Landscaped Areas 15) Bins and Cycle Store Bases Generally, all of the groundworks on the site are to be performed by a single subcontractor. Therefore any works not specifically detailed within this document, but which are necessary to carry out and complete the groundworks shall be deemed to be included in the subcontract price. If you are unsure over any specific item of work, then please contact the contractor

Statuscancelled

Award criteria
Plastic free working/commitment — 25
Ability/examples of working to the programme — 10
Experience working with housing providers — 10
Period of completion — 10
Technical assistance available for this contract — 10
Price (excl. provision of access equipment) — 35

What is included

ItemCategoryQuantity
1Construction workNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Construction work (45000000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 4517,1334 median · 30.3 average (5,651 of 17,133 with a bid count)3.8 average (6,250 of 17,133 with named award suppliers)Not published
Same buyer52 median · 2 average (1 of 5 with a bid count)1 average (1 of 5 with named award suppliers)Not published
Delivery region: UKG9565 median · 72.1 average (260 of 956 with a bid count)6.8 average (284 of 956 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byNot published
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Contracts

015631-2021-1

Statusactive
Value£214,453

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-029c8b
Latest release ID015631-2021
Latest release timestampWed Jul 07 2021 08:24:32 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodopen
Procurement method detailsOpen procedure
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release1
Contracts in latest release1
Parties in latest release3

Notice history

DateEventReference
7 Jul 2021award, contract015631-2021
17 Mar 2021tender005402-2021

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "015631-2021",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 2,
        "measure": "bids",
        "relatedLot": "1"
      }
    ]
  },
  "date": "2021-07-07T09:24:32+01:00",
  "ocid": "ocds-h6vhtk-029c8b",
  "buyer": {
    "id": "GB-FTS-3807",
    "name": "ACCORD HOUSING ASSOCIATION LTD"
  },
  "awards": [
    {
      "id": "015631-2021-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-21724",
          "name": "Norcon Construction Limited"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-029c8b",
    "lots": [
      {
        "id": "1",
        "status": "cancelled",
        "hasOptions": false,
        "description": "The following works are to be included within the Groundworks package:-\n1) Generally\n-All setting out is to be undertaken by the Sub-contractor.\n-Temporary roads\n-Stone for the Main Contractors compound and the maintenance of the same in\naccordance with the attached drawing\n-Tolerances - oversite concrete slab should be constructed within the following tolerances:-\nLine +/- 5mm\nLevel +/- 5mm\n-All abnormals met by the sub-contractor in the course of undertaking the sub-contractworks shall be deemed to be included by the sub-contractor with the exception of\nbreakingout rock met during excavations. A rate for this work to be submitted with the\nTender. Any voids met during excavation works are to be collapsed and compacted.\n-To include pile setting out, proof testing of pile positions, removal of near surface\nobstructions.\n2) Site Clearance\n-To include the removal of all trees not required within the final scheme.\n-Topsoil to be stripped and preserved on site.\n3) Excavate to reduce levels\n-All excavation required in order to establish formation levels shall be included by the\nsubcontractor.\n4) Roads and Footpaths\n-Construct all adoptable and non-adoptable roads and associated footpaths in accordance\nwith Engineers drawings.\n5) Drainage\n-Construct all adoptable and non-adoptable drainage in accordance with Engineers\nrecommendations. This is to include all final connections to existing drainage and domestic\ndrainage to each plot. The foul plot connections will include all works up to and including the drainage through the slab. The rainwater plot connections shall include all works up to the connection to rainwater downpipes.\n-Any storm water drainage required in order to ensure the collection and dissipation of water collected on private drives and individual drives shall be included by the subcontractor.\n-Any diversion of existing drainage in order to facilitate new drainage works shall be included by the sub-contractor.\n-Land drains required to assist site drainage shall be included by the sub-contractor.\n6) Substructures\n- Construct substructures in accordance with engineers drawings, including all drainage, service entries and insulation. The sub-contractor is to be responsible for supplying and laying the plastic pipework used from the Water Company stop tap to the stop tap within the\ndwelling.\n-All brickwork and blockwork below and including DPC shall be undertaken by the\nsubcontractor\nincluding the provision of air vents.\n7) Private drives and public car parking areas\nConstruct all private and individual plot drives as detailed on the site layout.\n8) Landscaping\n- The sub-contractor is to allow for cleaning around and removing from site any discarded\nbuilding materials immediately following the dismantle of scaffolding; the completion of\nplasterboarding; prior to handover.\n- Topsoil to be imported if necessary should there be any deficiency between that required\nand amounts collected during site strip.\n- All landscape areas are to be graded and prepared to receive planting or turf where\napplicable.\n-All plot paths are to be constructed by the sub-contractor. These shall be constructed either\nin-situ or of pre-cast concrete slabs - see specification. In-situ paths to be brushed finish with\ntrowelled margin and rounded edges.\n- The sub-contractor to allow for concreting and erection of a rotary line to each property.\n9) Screen /Retaining Walls\n-The sub-contractor is to allow for forming the foundations to all screen and retaining walls.\nFurther earthworks required in the formation of the retaining walls shall be allowed for by the\nsub-contractor.\n10) Services\n-Allow for all excavation and associated works for services distribution. It is intended that a\nCommon Services trench should be adopted thus minimising excavations.\n11) Street Lighting\nAllow for all excavation, bedding and dusting materials in association with street lighting\nworks.\n12) Pruning / clipping\nAllow for pruning / clipping trees / shrubs as required.\nThe sub-contractors estimate is to be analysed into the following elements:-\n1) Preliminaries\n2) Site Preparation\n3) Roads\n4) Footpaths\n5) Road Drainage (all drainage beneath the road construction)\n6) Mains Drainage (drainage not on plot or beneath the road)\n7) Domestic Drainage (on plot drainage)\n8) Services Installations (including Street Lighting)\n9) Sub-structures\n10) Private / Individual Drives, Parking Areas, Access Ways\n11) Plot Paths and Paving\n12) Screen Wall/ Retaining walls Foundations\n13) Substation\n14) Garden and Landscaped Areas\n15) Bins and Cycle Store Bases\nGenerally, all of the groundworks on the site are to be performed by a single subcontractor.\nTherefore any works not specifically detailed within this document, but which are\nnecessary to carry out and complete the groundworks shall be deemed to be included in the\nsubcontract price. If you are unsure over any specific item of work, then please contact the contractor",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Plastic free working/commitment",
              "type": "cost",
              "description": "25"
            },
            {
              "name": "Ability/examples of working to the programme",
              "type": "cost",
              "description": "10"
            },
            {
              "name": "Experience working with housing providers",
              "type": "cost",
              "description": "10"
            },
            {
              "name": "Period of completion",
              "type": "cost",
              "description": "10"
            },
            {
              "name": "Technical assistance available for this contract",
              "type": "cost",
              "description": "10"
            },
            {
              "name": "Price (excl. provision of access equipment)",
              "type": "cost",
              "description": "35"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKG"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45000000",
            "scheme": "CPV",
            "description": "Construction work"
          }
        ]
      }
    ],
    "title": "CHARM Groundworks Tender Package",
    "status": "complete",
    "procedure": {
      "isAccelerated": true,
      "acceleratedRationale": "This procurement procedure is an accelerated open procedure as there is urgency in\npublicity of this tender. This is because we first initially failed to publish this on Contracts\nFinder as well. Therefore, we had to re-tender this work package and if we were to go through\nthe standard procedure, it will lead to loss of finance due to interest cost on the site and on\ncosts associated with the building site set up. In addition to the grant programme has a\nnumber of grant milestones that the additional delay would put at a risk the spending of the\nEU public funding."
    },
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "This is a subcontracts package to carry out groundworks for the CHARM\nvirtually plastic free homes in Redditch, Worcestershire. The main tender information is in the Invitation to Tender document (supplied in PDF and Word versions below).",
    "classification": {
      "id": "45000000",
      "scheme": "CPV",
      "description": "Construction work"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-FTS-3807",
      "name": "ACCORD HOUSING ASSOCIATION LTD",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG",
        "locality": "WEST BROMWICH",
        "postalCode": "B706QG",
        "countryName": "United Kingdom",
        "streetAddress": "178 Birmingham Road"
      },
      "details": {
        "url": "https://accordgroup.org.uk/",
        "classifications": [
          {
            "scheme": "TED_CA_TYPE",
            "description": "Sub-Central Contracting Authority"
          },
          {
            "id": "06",
            "scheme": "COFOG",
            "description": "Housing and community amenities"
          }
        ]
      },
      "identifier": {
        "legalName": "ACCORD HOUSING ASSOCIATION LTD"
      },
      "contactPoint": {
        "name": "Mary Doria",
        "email": "Mary.Doria@accordgroup.org.uk",
        "telephone": "+44 7772281019"
      }
    },
    {
      "id": "GB-FTS-21724",
      "name": "Norcon Construction Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG",
        "locality": "Redditch",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Norcon Construction Limited"
      }
    },
    {
      "id": "GB-FTS-19673",
      "name": "GreenSquareAccord",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "West Bromwich",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "GreenSquareAccord"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "015631-2021-1",
      "value": {
        "amount": 214453,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "015631-2021-1",
      "dateSigned": "2021-07-05T00:00:00+01:00"
    }
  ],
  "initiationType": "tender"
}
Complete JSON history (2 releases)
7 Jul 2021 · 015631-2021 · award, contract
{
  "id": "015631-2021",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 2,
        "measure": "bids",
        "relatedLot": "1"
      }
    ]
  },
  "date": "2021-07-07T09:24:32+01:00",
  "ocid": "ocds-h6vhtk-029c8b",
  "buyer": {
    "id": "GB-FTS-3807",
    "name": "ACCORD HOUSING ASSOCIATION LTD"
  },
  "awards": [
    {
      "id": "015631-2021-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-21724",
          "name": "Norcon Construction Limited"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-029c8b",
    "lots": [
      {
        "id": "1",
        "status": "cancelled",
        "hasOptions": false,
        "description": "The following works are to be included within the Groundworks package:-\n1) Generally\n-All setting out is to be undertaken by the Sub-contractor.\n-Temporary roads\n-Stone for the Main Contractors compound and the maintenance of the same in\naccordance with the attached drawing\n-Tolerances - oversite concrete slab should be constructed within the following tolerances:-\nLine +/- 5mm\nLevel +/- 5mm\n-All abnormals met by the sub-contractor in the course of undertaking the sub-contractworks shall be deemed to be included by the sub-contractor with the exception of\nbreakingout rock met during excavations. A rate for this work to be submitted with the\nTender. Any voids met during excavation works are to be collapsed and compacted.\n-To include pile setting out, proof testing of pile positions, removal of near surface\nobstructions.\n2) Site Clearance\n-To include the removal of all trees not required within the final scheme.\n-Topsoil to be stripped and preserved on site.\n3) Excavate to reduce levels\n-All excavation required in order to establish formation levels shall be included by the\nsubcontractor.\n4) Roads and Footpaths\n-Construct all adoptable and non-adoptable roads and associated footpaths in accordance\nwith Engineers drawings.\n5) Drainage\n-Construct all adoptable and non-adoptable drainage in accordance with Engineers\nrecommendations. This is to include all final connections to existing drainage and domestic\ndrainage to each plot. The foul plot connections will include all works up to and including the drainage through the slab. The rainwater plot connections shall include all works up to the connection to rainwater downpipes.\n-Any storm water drainage required in order to ensure the collection and dissipation of water collected on private drives and individual drives shall be included by the subcontractor.\n-Any diversion of existing drainage in order to facilitate new drainage works shall be included by the sub-contractor.\n-Land drains required to assist site drainage shall be included by the sub-contractor.\n6) Substructures\n- Construct substructures in accordance with engineers drawings, including all drainage, service entries and insulation. The sub-contractor is to be responsible for supplying and laying the plastic pipework used from the Water Company stop tap to the stop tap within the\ndwelling.\n-All brickwork and blockwork below and including DPC shall be undertaken by the\nsubcontractor\nincluding the provision of air vents.\n7) Private drives and public car parking areas\nConstruct all private and individual plot drives as detailed on the site layout.\n8) Landscaping\n- The sub-contractor is to allow for cleaning around and removing from site any discarded\nbuilding materials immediately following the dismantle of scaffolding; the completion of\nplasterboarding; prior to handover.\n- Topsoil to be imported if necessary should there be any deficiency between that required\nand amounts collected during site strip.\n- All landscape areas are to be graded and prepared to receive planting or turf where\napplicable.\n-All plot paths are to be constructed by the sub-contractor. These shall be constructed either\nin-situ or of pre-cast concrete slabs - see specification. In-situ paths to be brushed finish with\ntrowelled margin and rounded edges.\n- The sub-contractor to allow for concreting and erection of a rotary line to each property.\n9) Screen /Retaining Walls\n-The sub-contractor is to allow for forming the foundations to all screen and retaining walls.\nFurther earthworks required in the formation of the retaining walls shall be allowed for by the\nsub-contractor.\n10) Services\n-Allow for all excavation and associated works for services distribution. It is intended that a\nCommon Services trench should be adopted thus minimising excavations.\n11) Street Lighting\nAllow for all excavation, bedding and dusting materials in association with street lighting\nworks.\n12) Pruning / clipping\nAllow for pruning / clipping trees / shrubs as required.\nThe sub-contractors estimate is to be analysed into the following elements:-\n1) Preliminaries\n2) Site Preparation\n3) Roads\n4) Footpaths\n5) Road Drainage (all drainage beneath the road construction)\n6) Mains Drainage (drainage not on plot or beneath the road)\n7) Domestic Drainage (on plot drainage)\n8) Services Installations (including Street Lighting)\n9) Sub-structures\n10) Private / Individual Drives, Parking Areas, Access Ways\n11) Plot Paths and Paving\n12) Screen Wall/ Retaining walls Foundations\n13) Substation\n14) Garden and Landscaped Areas\n15) Bins and Cycle Store Bases\nGenerally, all of the groundworks on the site are to be performed by a single subcontractor.\nTherefore any works not specifically detailed within this document, but which are\nnecessary to carry out and complete the groundworks shall be deemed to be included in the\nsubcontract price. If you are unsure over any specific item of work, then please contact the contractor",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Plastic free working/commitment",
              "type": "cost",
              "description": "25"
            },
            {
              "name": "Ability/examples of working to the programme",
              "type": "cost",
              "description": "10"
            },
            {
              "name": "Experience working with housing providers",
              "type": "cost",
              "description": "10"
            },
            {
              "name": "Period of completion",
              "type": "cost",
              "description": "10"
            },
            {
              "name": "Technical assistance available for this contract",
              "type": "cost",
              "description": "10"
            },
            {
              "name": "Price (excl. provision of access equipment)",
              "type": "cost",
              "description": "35"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKG"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45000000",
            "scheme": "CPV",
            "description": "Construction work"
          }
        ]
      }
    ],
    "title": "CHARM Groundworks Tender Package",
    "status": "complete",
    "procedure": {
      "isAccelerated": true,
      "acceleratedRationale": "This procurement procedure is an accelerated open procedure as there is urgency in\npublicity of this tender. This is because we first initially failed to publish this on Contracts\nFinder as well. Therefore, we had to re-tender this work package and if we were to go through\nthe standard procedure, it will lead to loss of finance due to interest cost on the site and on\ncosts associated with the building site set up. In addition to the grant programme has a\nnumber of grant milestones that the additional delay would put at a risk the spending of the\nEU public funding."
    },
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "This is a subcontracts package to carry out groundworks for the CHARM\nvirtually plastic free homes in Redditch, Worcestershire. The main tender information is in the Invitation to Tender document (supplied in PDF and Word versions below).",
    "classification": {
      "id": "45000000",
      "scheme": "CPV",
      "description": "Construction work"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-FTS-3807",
      "name": "ACCORD HOUSING ASSOCIATION LTD",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG",
        "locality": "WEST BROMWICH",
        "postalCode": "B706QG",
        "countryName": "United Kingdom",
        "streetAddress": "178 Birmingham Road"
      },
      "details": {
        "url": "https://accordgroup.org.uk/",
        "classifications": [
          {
            "scheme": "TED_CA_TYPE",
            "description": "Sub-Central Contracting Authority"
          },
          {
            "id": "06",
            "scheme": "COFOG",
            "description": "Housing and community amenities"
          }
        ]
      },
      "identifier": {
        "legalName": "ACCORD HOUSING ASSOCIATION LTD"
      },
      "contactPoint": {
        "name": "Mary Doria",
        "email": "Mary.Doria@accordgroup.org.uk",
        "telephone": "+44 7772281019"
      }
    },
    {
      "id": "GB-FTS-21724",
      "name": "Norcon Construction Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG",
        "locality": "Redditch",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Norcon Construction Limited"
      }
    },
    {
      "id": "GB-FTS-19673",
      "name": "GreenSquareAccord",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "West Bromwich",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "GreenSquareAccord"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "015631-2021-1",
      "value": {
        "amount": 214453,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "015631-2021-1",
      "dateSigned": "2021-07-05T00:00:00+01:00"
    }
  ],
  "initiationType": "tender"
}
17 Mar 2021 · 005402-2021 · tender
{
  "id": "005402-2021",
  "tag": [
    "tender"
  ],
  "date": "2021-03-17T12:30:56Z",
  "ocid": "ocds-h6vhtk-029c8b",
  "buyer": {
    "id": "GB-FTS-3807",
    "name": "ACCORD HOUSING ASSOCIATION LTD"
  },
  "tender": {
    "id": "ocds-h6vhtk-029c8b",
    "lots": [
      {
        "id": "1",
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "The following works are to be included within the Groundworks package:-\n1) Generally\n-All setting out is to be undertaken by the Sub-contractor.\n-Temporary roads\n-Stone for the Main Contractors compound and the maintenance of the same in\naccordance with the attached drawing\n-Tolerances - oversite concrete slab should be constructed within the following tolerances:-\n      Line +/- 5mm\n      Level +/- 5mm\n-All abnormals met by the sub-contractor in the course of undertaking the sub-contract works shall be deemed to be included by the sub-contractor with the exception of breakingout rock met during excavations. A rate for this work to be submitted with the Tender. Any voids met during excavation works are to be collapsed and compacted.\n-To include pile setting out, proof testing of pile positions, removal of near surface obstructions.\n2) Site Clearance\n-To include the removal of all trees not required within the final scheme.\n-Topsoil to be stripped and preserved on site.\n3) Excavate to reduce levels\n-All excavation required in order to establish formation levels shall be included by the subcontractor.\n4) Roads and Footpaths\n-Construct all adoptable and non-adoptable roads and associated footpaths in accordance with Engineers drawings.\n5) Drainage\n-Construct all adoptable and non-adoptable drainage in accordance with Engineers recommendations. This is to include all final connections to existing drainage and domestic drainage to each plot. The foul plot connections will include all works up to and including the drainage through the slab. The rainwater plot connections shall include all works up to the connection to rainwater downpipes.\n-Any storm water drainage required in order to ensure the collection and dissipation of water collected on private drives and individual drives shall be included by the subcontractor.\n-Any diversion of existing drainage in order to facilitate new drainage works shall be included by the sub-contractor.\n-Land drains required to assist site drainage shall be included by the sub-contractor.\n6) Substructures\n- Construct substructures in accordance with engineers drawings, including all drainage,\nservice entries and insulation. The sub-contractor is to be responsible for supplying and\nlaying the plastic pipework used from the Water Company stop tap to the stop tap within the\ndwelling.\n-All brickwork and blockwork below and including DPC shall be undertaken by the subcontractor\nincluding the provision of air vents.\n7) Private drives and public car parking areas\nConstruct all private and individual plot drives as detailed on the site layout.\n8) Landscaping\n- The sub-contractor is to allow for cleaning around and removing from site any discarded building materials immediately following the dismantle of scaffolding; the completion of plasterboarding; prior to handover.\n- Topsoil to be imported if necessary should there be any deficiency between that required and amounts collected during site strip.\n- All landscape areas are to be graded and prepared to receive planting or turf where applicable.\n-All plot paths are to be constructed by the sub-contractor. These shall be constructed either in-situ or of pre-cast concrete slabs - see specification. In-situ paths to be brushed finish with trowelled margin and rounded edges.\n- The sub-contractor to allow for concreting and erection of a rotary line to each property.\n9) Screen /Retaining Walls\n-The sub-contractor is to allow for forming the foundations to all screen and retaining walls. Further earthworks required in the formation of the retaining walls shall be allowed for by the\nsub-contractor.\n10) Services\n-Allow for all excavation and associated works for services distribution. It is intended that a Common Services trench should be adopted thus minimising excavations.\n11) Street Lighting\nAllow for all excavation, bedding and dusting materials in association with street lighting\nworks.\n12) Pruning / clipping\nAllow for pruning / clipping trees / shrubs as required.\nThe sub-contractors estimate is to be analysed into the following elements:-\n1) Preliminaries\n2) Site Preparation\n3) Roads\n4) Footpaths\n5) Road Drainage (all drainage beneath the road construction)\n6) Mains Drainage (drainage not on plot or beneath the road)\n7) Domestic Drainage (on plot drainage)\n8) Services Installations (including Street Lighting)\n9) Sub-structures\n10) Private / Individual Drives, Parking Areas, Access Ways\n11) Plot Paths and Paving\n12) Screen Wall/ Retaining walls Foundations\n13) Substation\n14) Garden and Landscaped Areas\n15) Bins and Cycle Store Bases\nGenerally, all of the groundworks on the site are to be performed by a single sub-contractor.Therefore any works not specifically detailed within this document, but which are necessary to carry out and complete the groundworks shall be deemed to be included in the subcontract price. If you are unsure over any specific item of work, then please contact the\nContractor.",
        "contractPeriod": {
          "durationInDays": 270
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryLocation": {
          "description": "Edward Street, Redditch, B97 6HA"
        },
        "deliveryAddresses": [
          {
            "region": "UKG"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45000000",
            "scheme": "CPV",
            "description": "Construction work"
          }
        ]
      }
    ],
    "title": "CHARM Groundworks Tender Package",
    "status": "active",
    "procedure": {
      "isAccelerated": true,
      "acceleratedRationale": "This procurement procedure is an accelerated open procedure as there is urgency in publicity of this tender. This is because we first initially failed to publish this on Contracts Finder as well. Therefore, we had to re-tender this work package and if we were to go through the standard procedure, it will lead to loss of finance due to interest cost on the site and on costs associated with the building site set up. In addition to the grant programme has a number of grant milestones that the additional delay would put at a risk the spending of the EU public funding."
    },
    "bidOpening": {
      "date": "2021-04-07T12:00:00+01:00"
    },
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "awardPeriod": {
      "startDate": "2021-04-07T12:00:00+01:00"
    },
    "description": "This is a subcontracts package to carry out groundworks for the CHARM\nvirtually plastic free homes in Redditch, Worcestershire. The main tender information is in the Invitation to Tender document (supplied in PDF and Word versions below). This procurement procedure is an accelerated open procedure  as there is urgency in publicity of this tender.",
    "tenderPeriod": {
      "endDate": "2021-04-01T12:00:00+01:00"
    },
    "hasRecurrence": false,
    "classification": {
      "id": "45000000",
      "scheme": "CPV",
      "description": "Construction work"
    },
    "submissionTerms": {
      "languages": [
        "en"
      ]
    },
    "submissionMethod": [
      "written"
    ],
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "Accord Housing Association, 178 Birmingham Road, West Bromwich, B70 6QG, United Kingdom. NUTS code: UKG. Mary Doria, Mary.Doria@accordgroup.org.uk, https://accordgroup.org.uk/",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-FTS-3807",
      "name": "ACCORD HOUSING ASSOCIATION LTD",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG",
        "locality": "WEST BROMWICH",
        "postalCode": "B706QG",
        "countryName": "United Kingdom",
        "streetAddress": "178 Birmingham Road"
      },
      "details": {
        "url": "https://accordgroup.org.uk/",
        "buyerProfile": "https://accordgroup.org.uk/about/supply-to-us/charm",
        "classifications": [
          {
            "scheme": "TED_CA_TYPE",
            "description": "Sub-Central Contracting Authority"
          },
          {
            "id": "06",
            "scheme": "COFOG",
            "description": "Housing and community amenities"
          }
        ]
      },
      "identifier": {
        "legalName": "ACCORD HOUSING ASSOCIATION LTD"
      },
      "contactPoint": {
        "url": "https://accordgroup.org.uk/about/supply-to-us/charm",
        "name": "Mary Doria",
        "email": "Mary.Doria@accordgroup.org.uk",
        "telephone": "+44 7772281019"
      }
    },
    {
      "id": "GB-FTS-9117",
      "name": "Accord Housing Association",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "West Bromwich",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "Accord Housing Association"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}