Find a TenderAwardedContract award notice
Published 5 Jun 2025, 13:59 BST

Official UK procurement notice

C396 (2025) SUPPLY OF SUMP PUMPS

Official notice

Authority: Northern Ireland Electricity Networks Limited (Public body)

Framework agreement2 lotsGoodsCompetitive flexible procedureAbove thresholdUtilities
Framework ceiling (notional)£2,098,016total for 2 lots · framework ceiling, not attributable revenue
Submissions closed 4 Jul 2025awarded 4 Jun 2026
Awarded to Andel Limited
Framework period 5 yrsends 31 Oct 2030 · up to 31 Oct 2033 with extensions · starts 1 Nov 2025

What is being bought2 lots · detail below

Published requirement description

NIE Networks wishes to establish a Framework Agreement and appoint supplier(s) for the supply and delivery of submersible group water sumps pumps complete with control panels and compliant with Supervisory Control and Data Acquisition (SCADA) for use in High Voltage switch house basements.

In addition to these will be the need for oil separator units capable of class 1 discharge standard as per BS EN 858 with submersible sump pump complete with control panels compliant with SCADA. These are to be used in transformer and generator oil containment systems.

  • The authority expects to re-tender this requirement around 1 Nov 2032, 23:59 GMT.
  • How the procedure runs: As specified within the RTP and/or tender documents available from the address specified within this notice with the reference project C396 (2025) SUPPLY OF SUMP PUMPS

CPV: Electric pumps · Pumps · Pumps and compressors · Pumps for liquids · Submersible pumps · Water pumps · Water purification plant construction work

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Framework period
5 yrs · up to 8 yrs from 1 Nov 2025
Published description of the framework

As specified within the RTP and/or tender documents available from the address specified within this notice with the reference project C396 (2025) SUPPLY OF SUMP PUMPS

Lots and requirements (2)Procurement structure

2 lots · all with a published value · same evaluation weights on every lot

Every one of these 2 lots carries the same published figure, £2,098,016: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Submersible Ground Water Sump PumpsAwardedRenewal 5 yrsceiling above

The source published no individual description for this lot.

Contract period: 1 Nov 2025 – 31 Oct 2030 (5 yrs) · up to 31 Oct 2033 with extensions
Extensions: The Framework Agreement period is five years with the option, exercisable exclusively by NIE Networks, to extend the Framework Agreement for up to a further three years. · The Framework Agreement period is five years with the option, exercisable exclusively by NIE Networks, to extend the Framework Agreement for up to a further three years.Second stage: up to 2 candidates invited to tender
Lot #2Submersible Ground Water Sump Pump with Oil Separating (Class 1)AwardedRenewal 5 yrsceiling above

The source published no individual description for this lot.

Contract period: 1 Nov 2025 – 31 Oct 2030 (5 yrs) · up to 31 Oct 2033 with extensions
Extensions: The Framework Agreement period is five years with the option, exercisable exclusively by NIE Networks, to extend the Framework Agreement for up to a further three years. · The Framework Agreement period is five years with the option, exercisable exclusively by NIE Networks, to extend the Framework Agreement for up to a further three years.Second stage: up to 2 candidates invited to tender

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 2 lots
Quality: 30%Price: 70%
Published award criteria (2)
  • Quality: As specified within the RTP and/or tender documents available from the address specified within this notice with the reference project C396 (2025) SUPPLY OF SUMP PUMPS
  • Price: As specified within the RTP and/or tender documents available from the address specified within this notice with the reference project C396 (2025) SUPPLY OF SUMP PUMPS
What this means for your bid
  • Price carries 70 of 100 points: a 10% discount moves about 7 points. This one is won on the number: sharpen the price before polishing the prose.
  • “C396 (2025) SUPPLY OF SUMP PUMPS” is a framework: the contest is a place on its panel, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Yes · next expected 1 Nov 2032
First published
5 Jun 2025, 13:59 BST
Last source update
4 Jun 2026, 10:57 BST
Award evaluation window
Submission end – 1 Nov 2025
Authority reference
C396 (2025) SUPPLY OF SUMP PUMPS
FTS notice number
2025/S 000-030261
Latest notice
Contract award notice (UK6)
Classification (CPV)
Electric pumpsPumpsPumps and compressorsPumps for liquidsSubmersible pumpsWater pumpsWater purification plant construction work
Delivery area
Northern Ireland (UKN)
Official registry OCID
ocds-h6vhtk-0543a6 Find a Tender
How it runs

As specified within the RTP and/or tender documents available from the address specified within this notice with the reference project C396 (2025) SUPPLY OF SUMP PUMPS

How it was run

Official notice
Run through: Jaggaer · Who buys & how to bid on JAGGAER
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail
Requests to participate (first stage)
4 Jul 2025, 15:00 BST
Appointment period ends
4 Jul 2025, 15:00 BST
Clarification deadline
27 Jun 2025, 15:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

5 Jun 2025 → 4 Jun 2026 · 7 dates
  1. Tender notice published
    5 Jun 2025, 13:59 BST
  2. Clarification questions by
    27 Jun 2025, 15:00 BST
  3. Admission / appointment period endsperiod end, not a bid countdown
    4 Jul 2025, 15:00 BST
  4. Contract starts355 days ago
    1 Nov 2025
  5. Award decision expected by354 days ago
    1 Nov 2025, 23:59 GMT
  6. Assessment summaries sent140 days ago
    4 Jun 2026, 00:00 BST
  7. Latest notice published140 days ago
    4 Jun 2026, 10:57 BST

Notice history

5 events · 3 releases on Find a Tender · since 5 Jun 2025
  1. Tender notice published
    5 Jun 2025, 13:59 BST
    UK4
  2. Tender notice published
    5 Jun 2025, 15:38 BST
    UK4
  3. Contract award notice published
    4 Jun 2026, 10:57 BST
    UK6
  4. Status changed to complete
    4 Jun 2026, 10:57 BST
  5. Contract signature expected
    16 Jun 2026, 23:59 BST
    scheduled
Published amendments (1)

"Maximum number of suppliers to be invited to tender for this lot(UK4_100)" was set at 2 in error, this has now been amended for both lots.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awarded toValueDateStatus
Across several lots1 award
Andel LimitedSME1 Jul 2026 – 30 Jun 2031 · up to 30 Jun 2034Extensions: The framework will be awarded for a period of 5 years, with the option to extend (entirely at the discretion of NIE Networks) for a further 36-month period · Options: The framework will be awarded for a period of 5 years, with the option to extend (entirely at the discretion of NIE Networks) for a further 36-month period£1,715,2994 Jun 2026Awarded

Contracting authority & participating public bodies

Northern Ireland Electricity Networks Limited

Contracting authorityPrivate utilityNorthern Irish devolved regulations apply GB-COH: NI026041 120 Malone Road, Belfast, UK, BT9 5HTContact email

Framework contractors & participating bidders

1 commercial party on the notice
  • Andel LimitedFramework contractorGB-PPON: PZQQ-1133-CBTG Unit 1, Dodworth Business Park, Dodworth, Yorkshire & Humber, S75 3SPContact email

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender