Blade Test Facility 3 - ORE/22/089

Official notice

Authority: Offshore Renewable Energy Catapult

WorksCompetitive procedure with negotiation
Budget not disclosedValue not published
Submissions closed 29 Nov 2022
Contract term Ends 31 Jul 2024

What is being bought

Published requirement description

ORE Catapult intends to expand its wind turbine test capabilities by constructing a new blade test facility (“BTF3”), capable of full-scale testing of blades up to 150m in length, and optionally expanding to test blades up to 180m. ORE Catapult intends to appoint a single contractor (or consortium) to design, procure, construct and commission BTF3 at its Blyth site, which may comprise of a reaction structure onto which the blades are mounted, appropriate floor structures, a building to totally or partially encompass the test site and associated hydraulics, mechanical, electrical, instrumentation & control systems.

CPV: Research and testing facilities construction work

The lotProcurement structure

single lot · no lot value published
Lot #1This tender is being issued by the Offshore Renewable Energy Catapult (‘ORE Catapult’)…

This tender is being issued by the Offshore Renewable Energy Catapult (‘ORE Catapult’) as a competitive procurement exercise in accordance with the ‘Competitive Procedure with Negotiation’ for tendering under the Public Contracts Regulations 2015 (as amended from time to time).

ORE Catapult intends to expand its wind turbine test capabilities by constructing a new blade test facility (“BTF3”), capable of full-scale testing of blades up to 150m in length, and optionally expanding to test blades up to 180m. ORE Catapult intends to appoint a single contractor (or consortium) to design, procure, construct and commission BTF3 at its Blyth site, which may comprise of a reaction structure onto which the blades are mounted, appropriate floor structures, a building to totally or partially encompass the test site and associated hydraulics, mechanical, electrical, instrumentation & control systems.

Due to funding arrangement this will be an aggressive build programme. Therefore, ORE Catapult reserve the right to vary the Contract term following discussion with suppliers during the Competitive Procedure with Negotiation process.

ORE Catapult reserve the right to add additional requirements to the minimum Scope of the Works during the Contract life, as it is deemed appropriate within the Scope of the Works.

ORE Catapult has determined that the requirement is not suitable for dividing into lots as it is not appropriate to have the various elements of the Works delivered by separate suppliers due to the complexity of the requirements. Accordingly, ORE Catapult intends to award a single contract for the requirement.

Phases of the procurement process:

Stage 1 — Selection Questionnaire to a minimum of 3 (three) capable suppliers, where there are less than 3 (three) capable suppliers, all suitably qualified tenderers will be invited to proceed to Stage 2 Invitation to Participate (“ITP”).

Stage 2 - Non-Disclosure Agreement (NDA). Preferred Tenderers will enter into a NDA within two (2) weeks to facilitate full disclosure of all other relevant sensitive and proprietary Operation & Maintenance (“O&M”) documentation. Tenderers unable to agree an NDA within this time period may be eliminated from further competition

Stage 3 - This stage will include the preliminary design / FEED. ORE Catapult has set aside funding for this stage to allow tenderers to submit preliminary designs, together with cost estimates as part of their Initial ITP Response. Expected outputs from Preliminary Design phase shall be as follows:

  • Project charter including participants, roles and responsibilities
  • Methodology and programme for detailed design phase
  • Outline programme showing key dates and project completion
  • General arrangement drawings of WTBTF components
  • Outline target cost plan
  • List of assumptions
  • Clarifications required and outstanding information needed
  • Preliminary Risk Register

Tenderers shall be required to submit an initial Tender which shall be the basis for any subsequent negotiations.

Stage 4 — Draft ITP submissions - Tenderers shall be required to submit tenders, including preliminary design, in accordance with the details / instructions set out in the ITP.

Stage 5 — Negotiations - ORE Catapult reserve the right to award a Contract on the basis of the initial tender without entering into negotiation where it is in their best interest to do so. ORE Catapult also reserve the right to carry out the Competitive procedures with Negotiation in successive stages in order to reduce the number of tenders to be negotiated. ORE Catapult will inform remaining tenderers of the common deadline to submit new or revised tenders.

Stage 5 — Final Tender submission (Best and Final Offer “BAFO”) ORE Catapult verify best and final tenders to ensure they conform to minimum requirements and evaluate on the basis of the published award criteria in ITP.

Stage 6 — Contract Award / Mandatory Standstill period observed.

Finally, please note that a site visit / bidders conference has been provisionally arranged for 08 November 2022 commencing at 1000 hrs. Due to capacity issues at the venue, we have to restrict attendance to a maximum of 2 (two) people from each interested company.

Contract period: … – 31 Jul 2024
Delivery: North East
Variant bids: not allowed

Procedure terms & legal framework

From the official record
Procedure method
Competitive procedure with negotiation
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
28 Oct 2022, 16:26 BST
Last source update
28 Oct 2022, 16:26 BST
Authority reference
DN639964
FTS notice number
2022/S 000-030574
Classification (CPV)
Research and testing facilities construction work
Delivery area
North East (UKC21)
Official registry OCID
ocds-h6vhtk-037d70 Find a Tender

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Submission deadline
29 Nov 2022, 12:00 GMT
Submission channel
{"electronicSubmission"}
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

28 Oct 2022 → 29 Nov 2022 · 2 dates
  1. Notice published
    28 Oct 2022, 16:26 BST
  2. Submission deadline
    29 Nov 2022, 12:00 GMT

Contracting authority & participating public bodies

Offshore Renewable Energy Catapult

Contracting authorityCompliance with grant funding agreementResearch & Development Offshore House, Albert Street,, Blyth, North East, NE24 1LZContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Royal Courts of JusticeMediation bodyReview body London

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.