Find a TenderPlanned procurementPipeline notice
Published 21 May 2025, 10:04 BST

Official UK procurement notice

Automated People Mover (APM) Infrastructure

Authority: High Speed Two (HS2) Limited (Public body)

WorksAbove thresholdUtilitiesSME suitable
Planned pipeline value£154,000,000pipeline notice, not a live tender
Tender notice expected 5 May 2027from the planned procurement notice
Contract term 4 yrs 3 moends 19 Jul 2033 · starts 19 Apr 2029

What is being bought

Published requirement description

The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport. An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network. The APM network will consist of a maintenance facility and four stops detailed herein:

I. Interchange Station stop;

II. National Exhibition Centre stop;

III. Birmingham International Railway Station stop; and

IV. Birmingham Airport stop.

The APM has been designed as an elevated mass transit system, which will transport passengers between those stops detailed above. The APM route will consist of a 2.3km long viaduct, four stops and a maintenance facility. The Interchange Station Stop is at ground level and the three other stops and maintenance facility are on the viaduct (above ground level). The route has several major crossings to navigate, such as the M42 motorway, the West Coast Main Line (WCML) and Pendigo Lake at the National Exhibition Centre (NEC) site.

The key design features of the APM Infrastructure include reinforced central concrete piers, weathered steel deck and escape walkway gratings throughout the entirety of the track. To minimise impact to the existing developed site and public roads, the entire 2.3km route is on an elevated viaduct. This is made up of a range of single and twin track at various points along the route to allow trains to pass each other.The piers range from 6 metres high to 14 metres, depending on the topography along the route. In order to maintain a consistent level for the viaduct, the columns will need to vary in height.

The stops at Birmingham Airport and at Interchange Station will have a single platform face and the intermediate stops at the NEC and Birmingham International Railway Station have two platform faces. The platforms vary from 36m to 40m long and all platforms are fully covered with canopies and have step free access.

The APM Infrastructure scope includes the detailed design and delivery of all piers, viaducts, APM stops, the APM maintenance facility as well as temporary works. The APM Infrastructure Contractor will be the Principal Contractor for the works and will be responsible for managing the APM Systems Contractor as well as nominated HS2 Contractors during these works. The APM Infrastructure Contractor will be responsible for managing all the interfaces and access for the works. Further details on interfacing contractors will be provided in the Tender documentation for the APM Infrastructure procurement.

CPV: Construction work · Construction work for railways and cable transport systems

The lotProcurement structure

single lot · no lot value published
Lot #1Planned 4 yrs 3 moSME

Pipeline intelligence · planning stage: how this market runs before the tender is published

How High Speed Two (HS2) Limited buys Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523), and who usually turns up

High Speed Two (HS2) Limited’s own published record, next to the published market for the same work. Frameworks and DPS are kept out: they attract a different number of bids. Whole-market view: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 0 of 5 known-size awards · market: CPV 4523 · West Midlands, n=62
0%61%

No small-firm winners recorded among this authority’s published awards in this sample.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Here, local means registered in West Midlands.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: no winner locations published · market: CPV 4523 · West Midlands, n=74
—34%

No winner locations published for this authority. Local means a registered address in West Midlands.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: no decision dates published · market: CPV 4523 · West Midlands, n=9
—26 days

Half of these awards were announced within 26 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: exactly 0 of 5 procurements with awards had no recorded rival · market: CPV 4523 · West Midlands, n=83
0%22%

Missing bid counts may hide more single-bid awards. This share is a minimum.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer5 lots with bid counts · broad CPV 45
0% had one bid
The market17 lots with bid counts · CPV 4523 · West Midlands
6% had one bid
Buyer / market · select a colour for counts
1 bid0% / 6%
Buyer: 0 of 5 lots with published bid counts. Market: 1 of 17 lots with published bid counts.
2–30% / 24%
Buyer: 0 of 5 lots with published bid counts. Market: 4 of 17 lots with published bid counts.
4–680% / 35%
Buyer: 4 of 5 lots with published bid counts. Market: 6 of 17 lots with published bid counts.
7+20% / 35%
Buyer: 1 of 5 lots with published bid counts. Market: 6 of 17 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

Past prices are a guide, not a bid price.

Last 36 months.

This buyerNo estimate-and-award pairs published
The market16 lots with estimate and award · CPV 4523 · West Midlands
50% below estimate
Market · select a colour for counts
Below estimate50%
Market: 8 of 16 lots with an estimate and award.
Within ±2%25%
Market: 4 of 16 lots with an estimate and award.
Above estimate25%
Market: 4 of 16 lots with an estimate and award.
2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 452351 monthsSME suitablePublished estimate£154m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 17 past lots.

A forecast, not a list of bidders.

—No model forecast yet6% single-bid risk
Past bids on 17 similar lots
1 bid6%
1 of 17 similar past lots received 1 bid (6%).
2–324%
4 of 17 similar past lots received 2–3 (24%).
4–635%
6 of 17 similar past lots received 4–6 (35%).
7+35%
6 of 17 similar past lots received 7+ (35%).
Comparable past lots usually drew 4 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—No model forecast yet
No comparable awards on record for this lot’s category yet. The published estimate is £154m, and the forecast stays empty until the market has a record to read.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
21 May 2025, 10:04 BST
Last source update
26 May 2026, 12:34 BST
Authority reference
_2978
FTS notice number
2026/S 000-048677
Latest notice
Pipeline notice (UK1)
Classification (CPV)
Construction workConstruction work for railways and cable transport systems
Delivery area
UK
Official registry OCID
ocds-h6vhtk-0519dd Find a Tender

How it was run

Official notice
Submission deadline
—

Timeline

21 May 2025 → 19 Apr 2029 · 4 dates
  1. Planning notice published
    21 May 2025, 10:04 BST
  2. Latest notice published148 days ago
    26 May 2026, 12:34 BST
  3. Today
    21 Oct 2026
  4. Tender notice expectedin 196 days
    5 May 2027, 23:59 BST
  5. Contract starts
    19 Apr 2029, 00:00 BST

Notice history

2 events · 2 releases on Find a Tender · since 21 May 2025
  1. Pipeline notice published
    21 May 2025, 10:04 BST
    UK1
  2. Pipeline notice published
    26 May 2026, 12:34 BST
    UK1
Published amendments (1)

Please note change to Tender Notice date and Contract Start date.

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

High Speed Two (HS2) Limited

Contracting authorityPublic authority - sub-central government GB-PPON: PMNV-3857-LNLV Two Snowhill, Snow Hill Queensway, Birmingham, West Midlands, B4 6GAContact email

Official documents & specifications (2)

Official links; attachments are not copied

Notices published for this procedure

  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender
  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender