← Back to search results

OpenFind a Tender · UK4

Architect / Engineers and Cost Consultant Team - Lymington Sea Water Baths

Buyer: Lymington and Pennington Town Council →

Participate on lymingtonandpennington-tc.gov.uk ↗External submission platform

BuyerLymington and Pennington Town Council
StatusOpen
Deadline7 Sept 2026
Value£120,000
Published27 Aug 2026

What is being bought

Lymington and Pennington Town Council is seeking to appoint one integrated Architect, Engineering and Cost Consultant Team to deliver Phase 1 of the Lymington Sea Water Baths Restoration Project. The project is supported by the National Lottery Heritage Fund and will develop the technical, design and cost evidence needed to inform the future restoration and sustainable operation of the Baths. The Lymington Sea Water Baths are a nationally significant historic coastal leisure facility. The site is affected by substantial structural deterioration, marine saltwater exposure, historic settlement, potentially unstable tidal deposits, ageing infrastructure, accessibility limitations and outdated facilities. The appointed team will be responsible for delivering and coordinating the architectural, structural engineering, geotechnical engineering, mechanical and electrical engineering, marine and environmental consultancy, quantity surveying and technical survey services required to complete the Phase 1 feasibility work and develop coordinated proposals to RIBA Stage 2. The Council requires a single integrated consultant team with clear lead responsibility for the coordination, management and quality assurance of all design, engineering, survey and cost information produced through the commission. The Phase 1 services will include: Mobilisation and project coordination • Participate in an inception workshop with the Council, Project Manager and other appointed consultants. • Confirm the design and technical programme, survey schedule, responsibilities, communication arrangements and information requirements. • Review and refine the scope of services, project risks, site constraints, dependencies and opportunities. • Coordinate the architectural, engineering, cost and technical survey workstreams. • Attend project meetings and provide progress information to the Council and Project Manager. Technical surveys and investigations The appointed team will lead, commission, manage or directly undertake the technical surveys and investigations required to support RIBA Stage 2. These are expected to include: • Structural condition surveys. • Concrete sampling, testing and condition mapping. • Structural integrity assessment. • Geotechnical investigations, including boreholes, trial pits or other appropriate investigations. • Assessment of settlement, groundwater and hydrogeological conditions. • Review of existing pumping, circulation and water-management systems. • Mechanical and electrical services assessment. • Drainage, outfall and marine water-management assessment. • Electrical infrastructure and lighting assessment. • Environmental, climate resilience and sustainability assessments. • Assessment of opportunities for low-energy systems and sustainable materials. The team will be responsible for determining the precise investigations required, coordinating access and sequencing, managing survey information and ensuring that the results are incorporated into the design proposals. The required outputs will include technical survey reports, drawings, testing results, data summaries, risk information and recommendations informing the RIBA Stage 0 to 2 process. RIBA Stage 0 and Stage 1 The appointed team will undertake the appraisal, briefing and initial design work required to establish a clear and deliverable basis for the project. This will include: • Site appraisal and constraints mapping. • Review of existing infrastructure, buildings, structures, heritage features and the marine setting. • Identification of technical, operational, access, environmental and conservation constraints. • Development of the project brief in collaboration with the Council and other consultants. • Initial accessibility and inclusion strategy. • Sustainability and climate resilience principles. • Feasibility layouts and concept proposals. • Integration of relevant findings from heritage research, business analysis and community engagement. RIBA Stage 2 design development The team will prepare coordinated RIBA Stage 2 proposals for the full Baths site. The work will include: • Developed architectural layouts. • General arrangement drawings, sections and elevations. • Structural design strategy. • Geotechnical design advice. • Mechanical and electrical outline strategies. • Pumping, circulation, drainage and water-management proposals. • Accessibility and inclusive design proposals. • Landscape and public realm strategy. • Conservation-led proposals informed by the Heritage Consultant's work. • Visualisations and illustrative materials. • Sustainability and climate resilience proposals. • Programme and construction phasing strategy. • Recommendations for materials suitable for a marine and heritage environment. The design must respond to the site's heritage significance, ground conditions, structural deterioration, marine exposure, operational requirements, accessibility objectives and long-term maintenance needs. Cost consultancy The Quantity Surveyor will prepare and maintain cost information throughout the Phase 1 design process. The services will include: • Preparation of the RIBA Stage 2 cost plan. • Advice on affordability and value for money. • Construction phasing cost analysis. • Design risk and cost risk assessment. • Preparation and maintenance of a cost risk register. • Lifecycle and maintenance cost projections. • Cost advice to support the Business Options Appraisal. • Identification of assumptions, exclusions, inflation allowances and contingencies. The Quantity Surveyor will work closely with the design team, Project Manager and business planning specialists to ensure that capital and lifecycle costs are properly reflected in the wider feasibility evidence. Consultation and engagement support The team will support the appointed Consultation and Engagement Consultant by: • Preparing accessible drawings, visualisations and explanatory materials. • Attending relevant public exhibitions, workshops or design feedback sessions. • Explaining the technical and design proposals to non-specialist audiences. • Reviewing and responding to consultation findings. • Demonstrating how relevant engagement feedback has informed the final RIBA Stage 2 proposals. Collaboration with the wider consultant team The appointed team will be expected to collaborate with the Council, Project Manager, Heritage Consultant, Consultation and Engagement Consultant, business planning specialists and other project advisers. The team must ensure that design decisions are informed by: • Heritage significance and conservation principles. • Technical survey findings. • Community and stakeholder engagement. • Operational and business planning requirements. • Capital and lifecycle costs. • Accessibility and inclusion. • Climate resilience and environmental sustainability. Final Phase 1 outputs The required final outputs will include: Coordinated RIBA Stage 2 Design Report. General arrangement drawings, sections and elevations. Architectural, structural, geotechnical, mechanical and electrical design narratives. Full technical survey and investigation reports. Developed accessibility and inclusive design narrative. Sustainability and climate resilience statement. Landscape and public realm proposals. RIBA Stage 2 cost plan. Capital cost, lifecycle cost and construction phasing information. Design, technical and cost risk registers. Visualisations and materials for consultation and funding purposes. Programme and recommendations for subsequent project stages. Contributions required for National Lottery Heritage Fund reporting, evaluation and future funding evidence. All documents must be coordinated, clearly presented, accessible and suitable for use by the Council, the National Lottery Heritage Fund and other project stakeholders. The Phase 1 contract value is up to £120,000 excluding VAT. The fee must include the professional services of the architect, structural engineer, geotechnical engineer, mechanical and electrical engineer, marine or environmental specialists, Quantity Surveyor, all required technical surveys and testing, and preparation of the required drawings, reports and RIBA Stage 2 deliverables.

Delivery location

UKJ36, GB

Categories

Architectural design services 71220000Architectural, engineering and planning services 71240000Structural engineering consultancy services 71312000Environmental engineering consultancy services 71313000Engineering design services for mechanical and electrical installations for buildings 71321000Quantity surveying services for civil engineering works 71322100Geotechnical engineering services 71332000Marine survey services 71354500Site-investigation services 71510000

Lot details

Lot 1

No lot description published.

Statusactive
Value£120,000
Contract periodFrom 30 Sept 2026 to 31 Aug 2027
SME suitabilitySuitable for SMEs

What is included

ItemCategoryQuantity
1Architectural design services, Architectural, engineering and planning services, Structural engineering consultancy services, Environmental engineering consultancy services, Engineering design services for mechanical and electrical installations for buildings, Quantity surveying services for civil engineering works, Geotechnical engineering services, Marine survey services, Site-investigation servicesNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 71. The category anchor is Architectural design services (71220000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 713,4673 median · 30.6 average (895 of 3,467 with a bid count)3.6 average (994 of 3,467 with named award suppliers)Not published
Same buyer1Not publishedNot publishedNot published
Delivery region: UKJ363Not publishedNot publishedNot published
Similar published value (0.5×–2×)3413 median · 6.1 average (8 of 341 with a bid count)2.1 average (8 of 341 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byNot published
Submission policyallowed
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Documents & submission route

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-06dc46
Latest release ID081605-2026
Latest release timestampThu Aug 27 2026 08:33:56 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLhttps://www.find-tender.service.gov.uk/Notice/081605-2026
Tender statusactive
Procurement methodopen
Procurement method detailsBelow threshold - open competition
Main procurement categoryservices
Above thresholdNo
Legal basis2023/54
Tender period: startNot published
Tender period: end2026-09-07T12:00:00+01:00
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailshttps://www.lymingtonandpennington-tc.gov.uk/tender Answers to clarification questions available at https://www.lymingtonandpennington-tc.gov.uk/tender-clarifications
Submission languagesNot published
Electronic catalogue policyNot published
Total tender value£120,000
Tender lots in source1
Tender items in source1
Tender documents in source2
Awards in latest release0
Contracts in latest release0
Parties in latest release1

Notice history

DateEventReference
27 Aug 2026tenderUpdate081605-2026
5 Aug 2026tender074143-2026

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "081605-2026",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2026-08-27T09:33:56+01:00",
  "ocid": "ocds-h6vhtk-06dc46",
  "buyer": {
    "id": "GB-PPON-PTDH-6894-QYYL",
    "name": "Lymington and Pennington Town Council"
  },
  "tender": {
    "id": "SWB Arc",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 120000,
          "currency": "GBP",
          "amountGross": 144000
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "awardCriteria": {
          "description": "Tenders will be evaluated on the basis of the most advantageous tender, taking account of quality, relevant experience, technical capability, capacity and value for money. The Council is not obliged to accept the lowest-priced tender.\n1. Experience of comparable projects: 30%\nEvidence of successfully delivering similar multidisciplinary commissions, particularly projects involving:\n- heritage buildings or structures\n- coastal or marine-exposed assets\n- lidos, seawater pools, leisure facilities or comparable public assets\n- technically complex structural and geotechnical conditions\n- RIBA Stage 0 to 2 design development\n- National Lottery Heritage Fund or comparable externally funded projects\nTenderers should demonstrate the relevance, scale and complexity of the projects cited, the role undertaken by the proposed team, the challenges addressed and the outcomes achieved.\n2. Capability and experience of the proposed team: 20%\nThe qualifications, professional accreditation, experience and availability of the proposed architect, structural engineer, geotechnical engineer, mechanical and electrical engineer, Quantity Surveyor and any marine, environmental or other specialist consultants.\nParticular consideration will be given to:\n- conservation and heritage design expertise\n- structural and geotechnical experience in marine or coastal environments\n- experience of concrete deterioration and historic structures\n- multidisciplinary coordination\n- cost planning for complex heritage projects\n- continuity and availability of named personnel\n3. Quality of methodology and understanding of the commission: 20%\nThe tenderer's understanding of the site, project objectives, heritage significance, marine environment, technical risks and required Phase 1 outputs.\nThe assessment will consider the quality and clarity of the proposed approach to:\n- mobilisation and project coordination\n- technical surveys and investigations\n- RIBA Stage 0 to 2 design development\n- integration of architectural, engineering and cost information\n- risk management and quality assurance\n- heritage, accessibility, sustainability and climate resilience\n- coordination with the Project Manager and other appointed consultants\n4. Programme, capacity and ability to meet the deadline: 10%\nThe credibility of the proposed programme and the tenderer's capacity to mobilise and complete the commission within the required timescale.\nThe assessment will consider:\n- availability of the proposed team\n- sequencing of surveys and design work\n- management of dependencies and approvals\n- ability to respond to emerging technical information\n- arrangements for maintaining progress\n- ability to complete all Phase 1 outputs before the absolute deadline of 31 August 2027\n5. Price and value for money: 15%\nThe total tendered fee and the extent to which it represents value for money for the services and outputs proposed.\nThe assessment will consider:\n- overall fixed fee\n- clarity and completeness of the fee breakdown\n- allocation of resources across disciplines\n- survey and testing allowances\n- assumptions, exclusions and expenses\n- day rates and rates for additional services\n- proportionality of the proposed resources to the commission\n- evidence that the tender is deliverable within the submitted fee\nThe lowest price will not automatically receive the highest overall evaluation score unless it also represents a complete, credible and deliverable proposal.\n6. Approach to collaboration, engagement and wider project outcomes: 5%\nThe proposed approach to working collaboratively with the Council, Project Manager, Heritage Consultant, Consultation and Engagement Consultant, business planning specialists and other stakeholders.\nThis will include consideration of:\n- support for public engagement and accessible communication\n- preparation of clear visual and technical information\n- responsiveness to community and stakeholder feedback\n- commitment to inclusive design\n- sustainability and climate resilience\n- long-term maintenance and community benefit"
        },
        "contractPeriod": {
          "endDate": "2027-08-31T23:59:59+01:00",
          "startDate": "2026-09-30T00:00:00+01:00"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKJ36",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "71220000",
            "scheme": "CPV",
            "description": "Architectural design services"
          },
          {
            "id": "71240000",
            "scheme": "CPV",
            "description": "Architectural, engineering and planning services"
          },
          {
            "id": "71312000",
            "scheme": "CPV",
            "description": "Structural engineering consultancy services"
          },
          {
            "id": "71313000",
            "scheme": "CPV",
            "description": "Environmental engineering consultancy services"
          },
          {
            "id": "71321000",
            "scheme": "CPV",
            "description": "Engineering design services for mechanical and electrical installations for buildings"
          },
          {
            "id": "71322100",
            "scheme": "CPV",
            "description": "Quantity surveying services for civil engineering works"
          },
          {
            "id": "71332000",
            "scheme": "CPV",
            "description": "Geotechnical engineering services"
          },
          {
            "id": "71354500",
            "scheme": "CPV",
            "description": "Marine survey services"
          },
          {
            "id": "71510000",
            "scheme": "CPV",
            "description": "Site-investigation services"
          }
        ]
      }
    ],
    "title": "Architect / Engineers and Cost Consultant Team - Lymington Sea Water Baths",
    "value": {
      "amount": 120000,
      "currency": "GBP",
      "amountGross": 144000
    },
    "status": "active",
    "documents": [
      {
        "id": "A-20164",
        "url": "https://www.find-tender.service.gov.uk/Notice/Attachment/A-20164",
        "format": "application/pdf",
        "documentType": "biddingDocuments"
      },
      {
        "id": "081605-2026",
        "url": "https://www.find-tender.service.gov.uk/Notice/081605-2026",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2026-08-27T09:33:56+01:00"
      }
    ],
    "amendments": [
      {
        "id": "081605-2026",
        "description": "Deadline extended due to summer holidays\nLink to tender clarification answers provided"
      }
    ],
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "description": "Lymington and Pennington Town Council is seeking to appoint one integrated Architect, Engineering and Cost Consultant Team to deliver Phase 1 of the Lymington Sea Water Baths Restoration Project.\nThe project is supported by the National Lottery Heritage Fund and will develop the technical, design and cost evidence needed to inform the future restoration and sustainable operation of the Baths.\nThe Lymington Sea Water Baths are a nationally significant historic coastal leisure facility. The site is affected by substantial structural deterioration, marine saltwater exposure, historic settlement, potentially unstable tidal deposits, ageing infrastructure, accessibility limitations and outdated facilities.\nThe appointed team will be responsible for delivering and coordinating the architectural, structural engineering, geotechnical engineering, mechanical and electrical engineering, marine and environmental consultancy, quantity surveying and technical survey services required to complete the Phase 1 feasibility work and develop coordinated proposals to RIBA Stage 2.\nThe Council requires a single integrated consultant team with clear lead responsibility for the coordination, management and quality assurance of all design, engineering, survey and cost information produced through the commission.\nThe Phase 1 services will include:\nMobilisation and project coordination\n• Participate in an inception workshop with the Council, Project Manager and other appointed consultants.\n• Confirm the design and technical programme, survey schedule, responsibilities, communication arrangements and information requirements.\n• Review and refine the scope of services, project risks, site constraints, dependencies and opportunities.\n• Coordinate the architectural, engineering, cost and technical survey workstreams.\n• Attend project meetings and provide progress information to the Council and Project Manager.\nTechnical surveys and investigations\nThe appointed team will lead, commission, manage or directly undertake the technical surveys and investigations required to support RIBA Stage 2.\nThese are expected to include:\n• Structural condition surveys.\n• Concrete sampling, testing and condition mapping.\n• Structural integrity assessment.\n• Geotechnical investigations, including boreholes, trial pits or other appropriate investigations.\n• Assessment of settlement, groundwater and hydrogeological conditions.\n• Review of existing pumping, circulation and water-management systems.\n• Mechanical and electrical services assessment.\n• Drainage, outfall and marine water-management assessment.\n• Electrical infrastructure and lighting assessment.\n• Environmental, climate resilience and sustainability assessments.\n• Assessment of opportunities for low-energy systems and sustainable materials.\nThe team will be responsible for determining the precise investigations required, coordinating access and sequencing, managing survey information and ensuring that the results are incorporated into the design proposals.\nThe required outputs will include technical survey reports, drawings, testing results, data summaries, risk information and recommendations informing the RIBA Stage 0 to 2 process.\nRIBA Stage 0 and Stage 1\nThe appointed team will undertake the appraisal, briefing and initial design work required to establish a clear and deliverable basis for the project.\nThis will include:\n• Site appraisal and constraints mapping.\n• Review of existing infrastructure, buildings, structures, heritage features and the marine setting.\n• Identification of technical, operational, access, environmental and conservation constraints.\n• Development of the project brief in collaboration with the Council and other consultants.\n• Initial accessibility and inclusion strategy.\n• Sustainability and climate resilience principles.\n• Feasibility layouts and concept proposals.\n• Integration of relevant findings from heritage research, business analysis and community engagement.\nRIBA Stage 2 design development\nThe team will prepare coordinated RIBA Stage 2 proposals for the full Baths site.\nThe work will include:\n• Developed architectural layouts.\n• General arrangement drawings, sections and elevations.\n• Structural design strategy.\n• Geotechnical design advice.\n• Mechanical and electrical outline strategies.\n• Pumping, circulation, drainage and water-management proposals.\n• Accessibility and inclusive design proposals.\n• Landscape and public realm strategy.\n• Conservation-led proposals informed by the Heritage Consultant's work.\n• Visualisations and illustrative materials.\n• Sustainability and climate resilience proposals.\n• Programme and construction phasing strategy.\n• Recommendations for materials suitable for a marine and heritage environment.\nThe design must respond to the site's heritage significance, ground conditions, structural deterioration, marine exposure, operational requirements, accessibility objectives and long-term maintenance needs.\nCost consultancy\nThe Quantity Surveyor will prepare and maintain cost information throughout the Phase 1 design process.\nThe services will include:\n• Preparation of the RIBA Stage 2 cost plan.\n• Advice on affordability and value for money.\n• Construction phasing cost analysis.\n• Design risk and cost risk assessment.\n• Preparation and maintenance of a cost risk register.\n• Lifecycle and maintenance cost projections.\n• Cost advice to support the Business Options Appraisal.\n• Identification of assumptions, exclusions, inflation allowances and contingencies.\nThe Quantity Surveyor will work closely with the design team, Project Manager and business planning specialists to ensure that capital and lifecycle costs are properly reflected in the wider feasibility evidence.\nConsultation and engagement support\nThe team will support the appointed Consultation and Engagement Consultant by:\n• Preparing accessible drawings, visualisations and explanatory materials.\n• Attending relevant public exhibitions, workshops or design feedback sessions.\n• Explaining the technical and design proposals to non-specialist audiences.\n• Reviewing and responding to consultation findings.\n• Demonstrating how relevant engagement feedback has informed the final RIBA Stage 2 proposals.\nCollaboration with the wider consultant team\nThe appointed team will be expected to collaborate with the Council, Project Manager, Heritage Consultant, Consultation and Engagement Consultant, business planning specialists and other project advisers.\nThe team must ensure that design decisions are informed by:\n• Heritage significance and conservation principles.\n• Technical survey findings.\n• Community and stakeholder engagement.\n• Operational and business planning requirements.\n• Capital and lifecycle costs.\n• Accessibility and inclusion.\n• Climate resilience and environmental sustainability.\nFinal Phase 1 outputs\nThe required final outputs will include:\nCoordinated RIBA Stage 2 Design Report.\nGeneral arrangement drawings, sections and elevations.\nArchitectural, structural, geotechnical, mechanical and electrical design narratives.\nFull technical survey and investigation reports.\nDeveloped accessibility and inclusive design narrative.\nSustainability and climate resilience statement.\nLandscape and public realm proposals.\nRIBA Stage 2 cost plan.\nCapital cost, lifecycle cost and construction phasing information.\nDesign, technical and cost risk registers.\nVisualisations and materials for consultation and funding purposes.\nProgramme and recommendations for subsequent project stages.\nContributions required for National Lottery Heritage Fund reporting, evaluation and future funding evidence.\nAll documents must be coordinated, clearly presented, accessible and suitable for use by the Council, the National Lottery Heritage Fund and other project stakeholders.\nThe Phase 1 contract value is up to £120,000 excluding VAT. The fee must include the professional services of the architect, structural engineer, geotechnical engineer, mechanical and electrical engineer, marine or environmental specialists, Quantity Surveyor, all required technical surveys and testing, and preparation of the required drawings, reports and RIBA Stage 2 deliverables.",
    "tenderPeriod": {
      "endDate": "2026-09-07T12:00:00+01:00"
    },
    "aboveThreshold": false,
    "submissionTerms": {
      "electronicSubmissionPolicy": "allowed"
    },
    "otherRequirements": {
      "reservedParticipationLocation": {
        "gazetteer": {
          "scheme": "GB-ONS",
          "identifiers": [
            "K02000001"
          ]
        },
        "description": null
      }
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "services",
    "submissionMethodDetails": "https://www.lymingtonandpennington-tc.gov.uk/tender\nAnswers to clarification questions available at https://www.lymingtonandpennington-tc.gov.uk/tender-clarifications",
    "procurementMethodDetails": "Below threshold - open competition"
  },
  "parties": [
    {
      "id": "GB-PPON-PTDH-6894-QYYL",
      "name": "Lymington and Pennington Town Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKJ36",
        "country": "GB",
        "locality": "Lymington",
        "postalCode": "SO41 9ZG",
        "countryName": "United Kingdom",
        "streetAddress": "Town Council Office, Town Hall, Avenue Road"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PTDH-6894-QYYL",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "projects@lymingtonandpennington-tc.gov.uk",
        "telephone": "01590 630834"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
Complete JSON history (2 releases)
27 Aug 2026 · 081605-2026 · tenderUpdate
{
  "id": "081605-2026",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2026-08-27T09:33:56+01:00",
  "ocid": "ocds-h6vhtk-06dc46",
  "buyer": {
    "id": "GB-PPON-PTDH-6894-QYYL",
    "name": "Lymington and Pennington Town Council"
  },
  "tender": {
    "id": "SWB Arc",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 120000,
          "currency": "GBP",
          "amountGross": 144000
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "awardCriteria": {
          "description": "Tenders will be evaluated on the basis of the most advantageous tender, taking account of quality, relevant experience, technical capability, capacity and value for money. The Council is not obliged to accept the lowest-priced tender.\n1. Experience of comparable projects: 30%\nEvidence of successfully delivering similar multidisciplinary commissions, particularly projects involving:\n- heritage buildings or structures\n- coastal or marine-exposed assets\n- lidos, seawater pools, leisure facilities or comparable public assets\n- technically complex structural and geotechnical conditions\n- RIBA Stage 0 to 2 design development\n- National Lottery Heritage Fund or comparable externally funded projects\nTenderers should demonstrate the relevance, scale and complexity of the projects cited, the role undertaken by the proposed team, the challenges addressed and the outcomes achieved.\n2. Capability and experience of the proposed team: 20%\nThe qualifications, professional accreditation, experience and availability of the proposed architect, structural engineer, geotechnical engineer, mechanical and electrical engineer, Quantity Surveyor and any marine, environmental or other specialist consultants.\nParticular consideration will be given to:\n- conservation and heritage design expertise\n- structural and geotechnical experience in marine or coastal environments\n- experience of concrete deterioration and historic structures\n- multidisciplinary coordination\n- cost planning for complex heritage projects\n- continuity and availability of named personnel\n3. Quality of methodology and understanding of the commission: 20%\nThe tenderer's understanding of the site, project objectives, heritage significance, marine environment, technical risks and required Phase 1 outputs.\nThe assessment will consider the quality and clarity of the proposed approach to:\n- mobilisation and project coordination\n- technical surveys and investigations\n- RIBA Stage 0 to 2 design development\n- integration of architectural, engineering and cost information\n- risk management and quality assurance\n- heritage, accessibility, sustainability and climate resilience\n- coordination with the Project Manager and other appointed consultants\n4. Programme, capacity and ability to meet the deadline: 10%\nThe credibility of the proposed programme and the tenderer's capacity to mobilise and complete the commission within the required timescale.\nThe assessment will consider:\n- availability of the proposed team\n- sequencing of surveys and design work\n- management of dependencies and approvals\n- ability to respond to emerging technical information\n- arrangements for maintaining progress\n- ability to complete all Phase 1 outputs before the absolute deadline of 31 August 2027\n5. Price and value for money: 15%\nThe total tendered fee and the extent to which it represents value for money for the services and outputs proposed.\nThe assessment will consider:\n- overall fixed fee\n- clarity and completeness of the fee breakdown\n- allocation of resources across disciplines\n- survey and testing allowances\n- assumptions, exclusions and expenses\n- day rates and rates for additional services\n- proportionality of the proposed resources to the commission\n- evidence that the tender is deliverable within the submitted fee\nThe lowest price will not automatically receive the highest overall evaluation score unless it also represents a complete, credible and deliverable proposal.\n6. Approach to collaboration, engagement and wider project outcomes: 5%\nThe proposed approach to working collaboratively with the Council, Project Manager, Heritage Consultant, Consultation and Engagement Consultant, business planning specialists and other stakeholders.\nThis will include consideration of:\n- support for public engagement and accessible communication\n- preparation of clear visual and technical information\n- responsiveness to community and stakeholder feedback\n- commitment to inclusive design\n- sustainability and climate resilience\n- long-term maintenance and community benefit"
        },
        "contractPeriod": {
          "endDate": "2027-08-31T23:59:59+01:00",
          "startDate": "2026-09-30T00:00:00+01:00"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKJ36",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "71220000",
            "scheme": "CPV",
            "description": "Architectural design services"
          },
          {
            "id": "71240000",
            "scheme": "CPV",
            "description": "Architectural, engineering and planning services"
          },
          {
            "id": "71312000",
            "scheme": "CPV",
            "description": "Structural engineering consultancy services"
          },
          {
            "id": "71313000",
            "scheme": "CPV",
            "description": "Environmental engineering consultancy services"
          },
          {
            "id": "71321000",
            "scheme": "CPV",
            "description": "Engineering design services for mechanical and electrical installations for buildings"
          },
          {
            "id": "71322100",
            "scheme": "CPV",
            "description": "Quantity surveying services for civil engineering works"
          },
          {
            "id": "71332000",
            "scheme": "CPV",
            "description": "Geotechnical engineering services"
          },
          {
            "id": "71354500",
            "scheme": "CPV",
            "description": "Marine survey services"
          },
          {
            "id": "71510000",
            "scheme": "CPV",
            "description": "Site-investigation services"
          }
        ]
      }
    ],
    "title": "Architect / Engineers and Cost Consultant Team - Lymington Sea Water Baths",
    "value": {
      "amount": 120000,
      "currency": "GBP",
      "amountGross": 144000
    },
    "status": "active",
    "documents": [
      {
        "id": "A-20164",
        "url": "https://www.find-tender.service.gov.uk/Notice/Attachment/A-20164",
        "format": "application/pdf",
        "documentType": "biddingDocuments"
      },
      {
        "id": "081605-2026",
        "url": "https://www.find-tender.service.gov.uk/Notice/081605-2026",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2026-08-27T09:33:56+01:00"
      }
    ],
    "amendments": [
      {
        "id": "081605-2026",
        "description": "Deadline extended due to summer holidays\nLink to tender clarification answers provided"
      }
    ],
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "description": "Lymington and Pennington Town Council is seeking to appoint one integrated Architect, Engineering and Cost Consultant Team to deliver Phase 1 of the Lymington Sea Water Baths Restoration Project.\nThe project is supported by the National Lottery Heritage Fund and will develop the technical, design and cost evidence needed to inform the future restoration and sustainable operation of the Baths.\nThe Lymington Sea Water Baths are a nationally significant historic coastal leisure facility. The site is affected by substantial structural deterioration, marine saltwater exposure, historic settlement, potentially unstable tidal deposits, ageing infrastructure, accessibility limitations and outdated facilities.\nThe appointed team will be responsible for delivering and coordinating the architectural, structural engineering, geotechnical engineering, mechanical and electrical engineering, marine and environmental consultancy, quantity surveying and technical survey services required to complete the Phase 1 feasibility work and develop coordinated proposals to RIBA Stage 2.\nThe Council requires a single integrated consultant team with clear lead responsibility for the coordination, management and quality assurance of all design, engineering, survey and cost information produced through the commission.\nThe Phase 1 services will include:\nMobilisation and project coordination\n• Participate in an inception workshop with the Council, Project Manager and other appointed consultants.\n• Confirm the design and technical programme, survey schedule, responsibilities, communication arrangements and information requirements.\n• Review and refine the scope of services, project risks, site constraints, dependencies and opportunities.\n• Coordinate the architectural, engineering, cost and technical survey workstreams.\n• Attend project meetings and provide progress information to the Council and Project Manager.\nTechnical surveys and investigations\nThe appointed team will lead, commission, manage or directly undertake the technical surveys and investigations required to support RIBA Stage 2.\nThese are expected to include:\n• Structural condition surveys.\n• Concrete sampling, testing and condition mapping.\n• Structural integrity assessment.\n• Geotechnical investigations, including boreholes, trial pits or other appropriate investigations.\n• Assessment of settlement, groundwater and hydrogeological conditions.\n• Review of existing pumping, circulation and water-management systems.\n• Mechanical and electrical services assessment.\n• Drainage, outfall and marine water-management assessment.\n• Electrical infrastructure and lighting assessment.\n• Environmental, climate resilience and sustainability assessments.\n• Assessment of opportunities for low-energy systems and sustainable materials.\nThe team will be responsible for determining the precise investigations required, coordinating access and sequencing, managing survey information and ensuring that the results are incorporated into the design proposals.\nThe required outputs will include technical survey reports, drawings, testing results, data summaries, risk information and recommendations informing the RIBA Stage 0 to 2 process.\nRIBA Stage 0 and Stage 1\nThe appointed team will undertake the appraisal, briefing and initial design work required to establish a clear and deliverable basis for the project.\nThis will include:\n• Site appraisal and constraints mapping.\n• Review of existing infrastructure, buildings, structures, heritage features and the marine setting.\n• Identification of technical, operational, access, environmental and conservation constraints.\n• Development of the project brief in collaboration with the Council and other consultants.\n• Initial accessibility and inclusion strategy.\n• Sustainability and climate resilience principles.\n• Feasibility layouts and concept proposals.\n• Integration of relevant findings from heritage research, business analysis and community engagement.\nRIBA Stage 2 design development\nThe team will prepare coordinated RIBA Stage 2 proposals for the full Baths site.\nThe work will include:\n• Developed architectural layouts.\n• General arrangement drawings, sections and elevations.\n• Structural design strategy.\n• Geotechnical design advice.\n• Mechanical and electrical outline strategies.\n• Pumping, circulation, drainage and water-management proposals.\n• Accessibility and inclusive design proposals.\n• Landscape and public realm strategy.\n• Conservation-led proposals informed by the Heritage Consultant's work.\n• Visualisations and illustrative materials.\n• Sustainability and climate resilience proposals.\n• Programme and construction phasing strategy.\n• Recommendations for materials suitable for a marine and heritage environment.\nThe design must respond to the site's heritage significance, ground conditions, structural deterioration, marine exposure, operational requirements, accessibility objectives and long-term maintenance needs.\nCost consultancy\nThe Quantity Surveyor will prepare and maintain cost information throughout the Phase 1 design process.\nThe services will include:\n• Preparation of the RIBA Stage 2 cost plan.\n• Advice on affordability and value for money.\n• Construction phasing cost analysis.\n• Design risk and cost risk assessment.\n• Preparation and maintenance of a cost risk register.\n• Lifecycle and maintenance cost projections.\n• Cost advice to support the Business Options Appraisal.\n• Identification of assumptions, exclusions, inflation allowances and contingencies.\nThe Quantity Surveyor will work closely with the design team, Project Manager and business planning specialists to ensure that capital and lifecycle costs are properly reflected in the wider feasibility evidence.\nConsultation and engagement support\nThe team will support the appointed Consultation and Engagement Consultant by:\n• Preparing accessible drawings, visualisations and explanatory materials.\n• Attending relevant public exhibitions, workshops or design feedback sessions.\n• Explaining the technical and design proposals to non-specialist audiences.\n• Reviewing and responding to consultation findings.\n• Demonstrating how relevant engagement feedback has informed the final RIBA Stage 2 proposals.\nCollaboration with the wider consultant team\nThe appointed team will be expected to collaborate with the Council, Project Manager, Heritage Consultant, Consultation and Engagement Consultant, business planning specialists and other project advisers.\nThe team must ensure that design decisions are informed by:\n• Heritage significance and conservation principles.\n• Technical survey findings.\n• Community and stakeholder engagement.\n• Operational and business planning requirements.\n• Capital and lifecycle costs.\n• Accessibility and inclusion.\n• Climate resilience and environmental sustainability.\nFinal Phase 1 outputs\nThe required final outputs will include:\nCoordinated RIBA Stage 2 Design Report.\nGeneral arrangement drawings, sections and elevations.\nArchitectural, structural, geotechnical, mechanical and electrical design narratives.\nFull technical survey and investigation reports.\nDeveloped accessibility and inclusive design narrative.\nSustainability and climate resilience statement.\nLandscape and public realm proposals.\nRIBA Stage 2 cost plan.\nCapital cost, lifecycle cost and construction phasing information.\nDesign, technical and cost risk registers.\nVisualisations and materials for consultation and funding purposes.\nProgramme and recommendations for subsequent project stages.\nContributions required for National Lottery Heritage Fund reporting, evaluation and future funding evidence.\nAll documents must be coordinated, clearly presented, accessible and suitable for use by the Council, the National Lottery Heritage Fund and other project stakeholders.\nThe Phase 1 contract value is up to £120,000 excluding VAT. The fee must include the professional services of the architect, structural engineer, geotechnical engineer, mechanical and electrical engineer, marine or environmental specialists, Quantity Surveyor, all required technical surveys and testing, and preparation of the required drawings, reports and RIBA Stage 2 deliverables.",
    "tenderPeriod": {
      "endDate": "2026-09-07T12:00:00+01:00"
    },
    "aboveThreshold": false,
    "submissionTerms": {
      "electronicSubmissionPolicy": "allowed"
    },
    "otherRequirements": {
      "reservedParticipationLocation": {
        "gazetteer": {
          "scheme": "GB-ONS",
          "identifiers": [
            "K02000001"
          ]
        },
        "description": null
      }
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "services",
    "submissionMethodDetails": "https://www.lymingtonandpennington-tc.gov.uk/tender\nAnswers to clarification questions available at https://www.lymingtonandpennington-tc.gov.uk/tender-clarifications",
    "procurementMethodDetails": "Below threshold - open competition"
  },
  "parties": [
    {
      "id": "GB-PPON-PTDH-6894-QYYL",
      "name": "Lymington and Pennington Town Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKJ36",
        "country": "GB",
        "locality": "Lymington",
        "postalCode": "SO41 9ZG",
        "countryName": "United Kingdom",
        "streetAddress": "Town Council Office, Town Hall, Avenue Road"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PTDH-6894-QYYL",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "projects@lymingtonandpennington-tc.gov.uk",
        "telephone": "01590 630834"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
5 Aug 2026 · 074143-2026 · tender
{
  "id": "074143-2026",
  "tag": [
    "tender"
  ],
  "date": "2026-08-05T12:24:14+01:00",
  "ocid": "ocds-h6vhtk-06dc46",
  "buyer": {
    "id": "GB-PPON-PTDH-6894-QYYL",
    "name": "Lymington and Pennington Town Council"
  },
  "tender": {
    "id": "SWB Arc",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 120000,
          "currency": "GBP",
          "amountGross": 144000
        },
        "status": "active",
        "suitability": {
          "sme": true
        },
        "awardCriteria": {
          "description": "Tenders will be evaluated on the basis of the most advantageous tender, taking account of quality, relevant experience, technical capability, capacity and value for money. The Council is not obliged to accept the lowest-priced tender.\n1. Experience of comparable projects: 30%\nEvidence of successfully delivering similar multidisciplinary commissions, particularly projects involving:\n- heritage buildings or structures\n- coastal or marine-exposed assets\n- lidos, seawater pools, leisure facilities or comparable public assets\n- technically complex structural and geotechnical conditions\n- RIBA Stage 0 to 2 design development\n- National Lottery Heritage Fund or comparable externally funded projects\nTenderers should demonstrate the relevance, scale and complexity of the projects cited, the role undertaken by the proposed team, the challenges addressed and the outcomes achieved.\n2. Capability and experience of the proposed team: 20%\nThe qualifications, professional accreditation, experience and availability of the proposed architect, structural engineer, geotechnical engineer, mechanical and electrical engineer, Quantity Surveyor and any marine, environmental or other specialist consultants.\nParticular consideration will be given to:\n- conservation and heritage design expertise\n- structural and geotechnical experience in marine or coastal environments\n- experience of concrete deterioration and historic structures\n- multidisciplinary coordination\n- cost planning for complex heritage projects\n- continuity and availability of named personnel\n3. Quality of methodology and understanding of the commission: 20%\nThe tenderer's understanding of the site, project objectives, heritage significance, marine environment, technical risks and required Phase 1 outputs.\nThe assessment will consider the quality and clarity of the proposed approach to:\n- mobilisation and project coordination\n- technical surveys and investigations\n- RIBA Stage 0 to 2 design development\n- integration of architectural, engineering and cost information\n- risk management and quality assurance\n- heritage, accessibility, sustainability and climate resilience\n- coordination with the Project Manager and other appointed consultants\n4. Programme, capacity and ability to meet the deadline: 10%\nThe credibility of the proposed programme and the tenderer's capacity to mobilise and complete the commission within the required timescale.\nThe assessment will consider:\n- availability of the proposed team\n- sequencing of surveys and design work\n- management of dependencies and approvals\n- ability to respond to emerging technical information\n- arrangements for maintaining progress\n- ability to complete all Phase 1 outputs before the absolute deadline of 31 August 2027\n5. Price and value for money: 15%\nThe total tendered fee and the extent to which it represents value for money for the services and outputs proposed.\nThe assessment will consider:\n- overall fixed fee\n- clarity and completeness of the fee breakdown\n- allocation of resources across disciplines\n- survey and testing allowances\n- assumptions, exclusions and expenses\n- day rates and rates for additional services\n- proportionality of the proposed resources to the commission\n- evidence that the tender is deliverable within the submitted fee\nThe lowest price will not automatically receive the highest overall evaluation score unless it also represents a complete, credible and deliverable proposal.\n6. Approach to collaboration, engagement and wider project outcomes: 5%\nThe proposed approach to working collaboratively with the Council, Project Manager, Heritage Consultant, Consultation and Engagement Consultant, business planning specialists and other stakeholders.\nThis will include consideration of:\n- support for public engagement and accessible communication\n- preparation of clear visual and technical information\n- responsiveness to community and stakeholder feedback\n- commitment to inclusive design\n- sustainability and climate resilience\n- long-term maintenance and community benefit"
        },
        "contractPeriod": {
          "endDate": "2027-08-31T23:59:59+01:00",
          "startDate": "2026-09-30T00:00:00+01:00"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKJ36",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "71220000",
            "scheme": "CPV",
            "description": "Architectural design services"
          },
          {
            "id": "71240000",
            "scheme": "CPV",
            "description": "Architectural, engineering and planning services"
          },
          {
            "id": "71312000",
            "scheme": "CPV",
            "description": "Structural engineering consultancy services"
          },
          {
            "id": "71313000",
            "scheme": "CPV",
            "description": "Environmental engineering consultancy services"
          },
          {
            "id": "71321000",
            "scheme": "CPV",
            "description": "Engineering design services for mechanical and electrical installations for buildings"
          },
          {
            "id": "71322100",
            "scheme": "CPV",
            "description": "Quantity surveying services for civil engineering works"
          },
          {
            "id": "71332000",
            "scheme": "CPV",
            "description": "Geotechnical engineering services"
          },
          {
            "id": "71354500",
            "scheme": "CPV",
            "description": "Marine survey services"
          },
          {
            "id": "71510000",
            "scheme": "CPV",
            "description": "Site-investigation services"
          }
        ]
      }
    ],
    "title": "Architect / Engineers and Cost Consultant Team - Lymington Sea Water Baths",
    "value": {
      "amount": 120000,
      "currency": "GBP",
      "amountGross": 144000
    },
    "status": "active",
    "documents": [
      {
        "id": "A-20164",
        "url": "https://www.find-tender.service.gov.uk/Notice/Attachment/A-20164",
        "format": "application/pdf",
        "documentType": "biddingDocuments"
      },
      {
        "id": "074143-2026",
        "url": "https://www.find-tender.service.gov.uk/Notice/074143-2026",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2026-08-05T12:24:14+01:00"
      }
    ],
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "description": "Lymington and Pennington Town Council is seeking to appoint one integrated Architect, Engineering and Cost Consultant Team to deliver Phase 1 of the Lymington Sea Water Baths Restoration Project.\nThe project is supported by the National Lottery Heritage Fund and will develop the technical, design and cost evidence needed to inform the future restoration and sustainable operation of the Baths.\nThe Lymington Sea Water Baths are a nationally significant historic coastal leisure facility. The site is affected by substantial structural deterioration, marine saltwater exposure, historic settlement, potentially unstable tidal deposits, ageing infrastructure, accessibility limitations and outdated facilities.\nThe appointed team will be responsible for delivering and coordinating the architectural, structural engineering, geotechnical engineering, mechanical and electrical engineering, marine and environmental consultancy, quantity surveying and technical survey services required to complete the Phase 1 feasibility work and develop coordinated proposals to RIBA Stage 2.\nThe Council requires a single integrated consultant team with clear lead responsibility for the coordination, management and quality assurance of all design, engineering, survey and cost information produced through the commission.\nThe Phase 1 services will include:\nMobilisation and project coordination\n• Participate in an inception workshop with the Council, Project Manager and other appointed consultants.\n• Confirm the design and technical programme, survey schedule, responsibilities, communication arrangements and information requirements.\n• Review and refine the scope of services, project risks, site constraints, dependencies and opportunities.\n• Coordinate the architectural, engineering, cost and technical survey workstreams.\n• Attend project meetings and provide progress information to the Council and Project Manager.\nTechnical surveys and investigations\nThe appointed team will lead, commission, manage or directly undertake the technical surveys and investigations required to support RIBA Stage 2.\nThese are expected to include:\n• Structural condition surveys.\n• Concrete sampling, testing and condition mapping.\n• Structural integrity assessment.\n• Geotechnical investigations, including boreholes, trial pits or other appropriate investigations.\n• Assessment of settlement, groundwater and hydrogeological conditions.\n• Review of existing pumping, circulation and water-management systems.\n• Mechanical and electrical services assessment.\n• Drainage, outfall and marine water-management assessment.\n• Electrical infrastructure and lighting assessment.\n• Environmental, climate resilience and sustainability assessments.\n• Assessment of opportunities for low-energy systems and sustainable materials.\nThe team will be responsible for determining the precise investigations required, coordinating access and sequencing, managing survey information and ensuring that the results are incorporated into the design proposals.\nThe required outputs will include technical survey reports, drawings, testing results, data summaries, risk information and recommendations informing the RIBA Stage 0 to 2 process.\nRIBA Stage 0 and Stage 1\nThe appointed team will undertake the appraisal, briefing and initial design work required to establish a clear and deliverable basis for the project.\nThis will include:\n• Site appraisal and constraints mapping.\n• Review of existing infrastructure, buildings, structures, heritage features and the marine setting.\n• Identification of technical, operational, access, environmental and conservation constraints.\n• Development of the project brief in collaboration with the Council and other consultants.\n• Initial accessibility and inclusion strategy.\n• Sustainability and climate resilience principles.\n• Feasibility layouts and concept proposals.\n• Integration of relevant findings from heritage research, business analysis and community engagement.\nRIBA Stage 2 design development\nThe team will prepare coordinated RIBA Stage 2 proposals for the full Baths site.\nThe work will include:\n• Developed architectural layouts.\n• General arrangement drawings, sections and elevations.\n• Structural design strategy.\n• Geotechnical design advice.\n• Mechanical and electrical outline strategies.\n• Pumping, circulation, drainage and water-management proposals.\n• Accessibility and inclusive design proposals.\n• Landscape and public realm strategy.\n• Conservation-led proposals informed by the Heritage Consultant's work.\n• Visualisations and illustrative materials.\n• Sustainability and climate resilience proposals.\n• Programme and construction phasing strategy.\n• Recommendations for materials suitable for a marine and heritage environment.\nThe design must respond to the site's heritage significance, ground conditions, structural deterioration, marine exposure, operational requirements, accessibility objectives and long-term maintenance needs.\nCost consultancy\nThe Quantity Surveyor will prepare and maintain cost information throughout the Phase 1 design process.\nThe services will include:\n• Preparation of the RIBA Stage 2 cost plan.\n• Advice on affordability and value for money.\n• Construction phasing cost analysis.\n• Design risk and cost risk assessment.\n• Preparation and maintenance of a cost risk register.\n• Lifecycle and maintenance cost projections.\n• Cost advice to support the Business Options Appraisal.\n• Identification of assumptions, exclusions, inflation allowances and contingencies.\nThe Quantity Surveyor will work closely with the design team, Project Manager and business planning specialists to ensure that capital and lifecycle costs are properly reflected in the wider feasibility evidence.\nConsultation and engagement support\nThe team will support the appointed Consultation and Engagement Consultant by:\n• Preparing accessible drawings, visualisations and explanatory materials.\n• Attending relevant public exhibitions, workshops or design feedback sessions.\n• Explaining the technical and design proposals to non-specialist audiences.\n• Reviewing and responding to consultation findings.\n• Demonstrating how relevant engagement feedback has informed the final RIBA Stage 2 proposals.\nCollaboration with the wider consultant team\nThe appointed team will be expected to collaborate with the Council, Project Manager, Heritage Consultant, Consultation and Engagement Consultant, business planning specialists and other project advisers.\nThe team must ensure that design decisions are informed by:\n• Heritage significance and conservation principles.\n• Technical survey findings.\n• Community and stakeholder engagement.\n• Operational and business planning requirements.\n• Capital and lifecycle costs.\n• Accessibility and inclusion.\n• Climate resilience and environmental sustainability.\nFinal Phase 1 outputs\nThe required final outputs will include:\nCoordinated RIBA Stage 2 Design Report.\nGeneral arrangement drawings, sections and elevations.\nArchitectural, structural, geotechnical, mechanical and electrical design narratives.\nFull technical survey and investigation reports.\nDeveloped accessibility and inclusive design narrative.\nSustainability and climate resilience statement.\nLandscape and public realm proposals.\nRIBA Stage 2 cost plan.\nCapital cost, lifecycle cost and construction phasing information.\nDesign, technical and cost risk registers.\nVisualisations and materials for consultation and funding purposes.\nProgramme and recommendations for subsequent project stages.\nContributions required for National Lottery Heritage Fund reporting, evaluation and future funding evidence.\nAll documents must be coordinated, clearly presented, accessible and suitable for use by the Council, the National Lottery Heritage Fund and other project stakeholders.\nThe Phase 1 contract value is up to £120,000 excluding VAT. The fee must include the professional services of the architect, structural engineer, geotechnical engineer, mechanical and electrical engineer, marine or environmental specialists, Quantity Surveyor, all required technical surveys and testing, and preparation of the required drawings, reports and RIBA Stage 2 deliverables.",
    "tenderPeriod": {
      "endDate": "2026-09-01T23:59:59+01:00"
    },
    "aboveThreshold": false,
    "submissionTerms": {
      "electronicSubmissionPolicy": "allowed"
    },
    "otherRequirements": {
      "reservedParticipationLocation": {
        "gazetteer": {
          "scheme": "GB-ONS",
          "identifiers": [
            "K02000001"
          ]
        },
        "description": null
      }
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "services",
    "submissionMethodDetails": "https://www.lymingtonandpennington-tc.gov.uk/tender",
    "procurementMethodDetails": "Below threshold - open competition"
  },
  "parties": [
    {
      "id": "GB-PPON-PTDH-6894-QYYL",
      "name": "Lymington and Pennington Town Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKJ36",
        "country": "GB",
        "locality": "Lymington",
        "postalCode": "SO41 9ZG",
        "countryName": "United Kingdom",
        "streetAddress": "Town Council Office, Town Hall, Avenue Road"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PTDH-6894-QYYL",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "projects@lymingtonandpennington-tc.gov.uk",
        "telephone": "01590 630834"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}