22/012 - GNI (UK) Brighouse Bay Compressor Station, LV Switchgear Replacement
Switchgear
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: GNI (UK) Limited: "22/012 - GNI (UK) Brighouse Bay Compressor Station, LV Switchgear Replacement". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | GNI (UK) Limited | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: GNI (UK) Limited
Market Analytics
Derived from OCDS awards & bid statistics
Published history for GNI (UK) Limited. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
1Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 8 active published awards; 7 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityGNI (UK) Limited | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published19 Apr 2023, 09:42 BST | Last source update19 Apr 2023, 09:42 BST | Recurring procurementNot published |
ClassificationSwitchgear | ||
Delivery area | ||
OCIDocds-h6vhtk-033b40 | ||
What is being bought
GNI (UK) Brighouse Bay Compressor Station, LV Switchgear Replacement
What changed
From the official release history
- Official notice release published
19 Apr 2023, 09:42 BST - Status changed to complete
19 May 2022, 12:57 BST - Official notice release published
19 May 2022, 12:57 BST - Buyer information updated
19 May 2022, 12:57 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedGNI UK Ltd acting as reasonable and prudent gas transporter are committed to operating a safe, reliable and sustainability transmission and distribution network. GNI UK own and operate the high pressure natural gas South West Scotland Onshore System (SWSOS) which connects the upstream Great Britain (GB) National Transmission System (NTS) to the Republic of Ireland (RoI), Northern Ireland (NI) and Isle of Man systems via subsea interconnector pipelines. Brighouse Bay Compressor Station (BBCS) is a critical node located on the SWSOS consisting of six (6) gas turbine compressor units which ensure safe and secure onward transportation of natural gas to the RoI transmission system and Isle of Man offtake. Brighouse Bay electrical demand is served by two (2) 11kV / 400V transformer substations, two (2) low voltage (LV) electrical switchroom / motor control centres (MCC1 and MCC2) and one standby diesel generator. MCC1 is in operation since the station was first commissioned in 1993. MCC1 electrical assets consist of one (1) main distribution switchgear panel, three (3) motor control centres panels (MCC A, B, C), one (1) large general services and lighting distribution panel and one (1) power factor correction panel. The main distribution panel also incorporates transformer protection and standby generator controls. MCC1 serves as the primary power distribution hub for the Brighouse admin and control building, utility and services building, workshops, compressor halls and is critical for the reliable operation and continuous availability of three (3) turbine compressor units (Units A, B, C). GNI UK commissioned a site wide review of the Brighouse electrical installation in 2018. Findings from the study show MCC1 electrical equipment has reached end of useful life with some functional units now obsolete. The study also highlights constraints associated with operability and functionality of the current switchgear arrangement, circuity configuration, means of isolation, and working area / operational access. The study recommends to replace and upgrade all MCC1 equipment and install a new temporary transportable generator inlet connection / changeover panel. GNI UK now wish to procure the replacement of all associated MCC1 switchgear as detailed in the BBCS switchgear specification (Ref. 18074-20-SP-0001) The specification covers the design, manufacture, factory acceptance testing, storage, handling, delivery, site re-assembly, verification testing and pre-commissioning of LV power switchgear and control gear. Equipment to be supplied includes one (1) main distribution switchgear panel, three (3) motor control centre panels (MCC), one (1) general service distribution board, one (1) power factor correction panel, and one (1) transportable generator inlet / changeover panel.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
19 Apr 2023, 09:42 BST - Award active
Not published · Not published - Contract active
Signed 30 Nov 2022, 00:00 GMT · €555,018
Commercial outcome and competition
Awards Eaton Electrical Systems Limited Not published · Not published · active |
Contracts 22/012 - BBCS LV Switchgear Replacement €555,018 · signed 30 Nov 2022, 00:00 GMT · active |
Bid statistics bids: 1 (lot 1) |
Buyer and organisations in this procedure
GNI (UK) Limited
Contracting authority GB-FTS-22241Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published
Planning and rationale
Planning budgetNot published |
No-engagement rationaleNot published |
Procedure rationaleFundamental to the successful delivery of goods or services is the economic operators ability to demonstrate
the switchgear solution offered can be manufactured, delivered, reassembled and installed in accordance
with BBCS switchgear specification (Ref. 18074-20-SP-0001) without the need to alter the basis of design,
specification, extend or substantially reconstruct the existing building.
Optimised design footprint and orientation for all switchgear assemblies is essential for installation, retermination
of existing cables, future operation and maintenance due to the limited working area available.
MCC1 supplies power to critical turbine compressor machinery which cannot be fully isolated for the duration of
work therefore the switchgear offered must be designed and manufactured to allow for the equipment to be
reassembled and installed in sequence over a phased construction period.
Having conducted initial market consultation with a number of OEMs and licenced switchgear manufacturers
followed by three (3) competitive procurement procedures between 2020 - 2022, Eaton Electrical Systems
Limited Ireland have emerged as the only economic operator who have demonstrated capability to meet the
requirements of the BBCS switchgear specification in full.
Previous tender submissions and clarifications received from other tenderers failed to demonstrate or guarantee
compliance with GNI UK requirements.
All previous tenderers could not provide an optimised switchgear geometry tailored for site installation as per the
layouts and orientation detailed in the specification.
Some tender submissions did not offer withdrawable switchgear. Some tender submissions did not comply in full
with internal arc fault criteria as specified. |