Find a TenderAwardedContract details notice
Published 4 Jul 2025, 11:30 BST

Official UK procurement notice

1972 Bakerloo line Tube stock Supply of Electrical Parts for Rail Vehicle Accessibility Regulations Project

Official notice

Authority: Transport for London (Public body)

GoodsCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Published estimate£500,000≈ £167k / year · £600,000 inc. VAT8.3% below published estimate
Submissions closed 11 Aug 2025awarded 4 Jun 2026
Awarded to P.K. ENGINEERING (WEST BROMWICH) LIMITED
Contract term 3 yrsends 31 Dec 2028 · up to 31 Dec 2030 with extensions · starts 1 Jan 2026

What is being bought

Published requirement description

Supply of Electrical Parts for RVAR Project for 1972 Bakerloo Line for London Underground Limited, built to an approved design. Goods required to facilitate compliance to the Rail Vehicle Accessibility Regulations Project for 1972 Tube Stock (Bakerloo Line). This contract covers the supply of ready made electrical parts, built to an approved design. Parts will be used to support accessibility improvements to the 1972 Bakerloo Line trains,

helping London Underground Limited meet current accessibility regulations and improve access for passengers.

  • How the procedure runs: This tender will follow the competitive flexible procedure comprising of five elements; (1) Signed Formal Offer of Tender; (2) Procurement Specific Questionnaire (PSQ) which include the Conditions of Participation; (3) response to the Technical Submission; (4) response to the Project Management Submission; and (5) the Commercial Submission. Scoring shall be a mix of pass/fail, discretionary pass / fail, and geared score elements which may include minimum pass score where indicated. A 'fail' in a Stage will exclude a Bidder from further consideration. Once the bids are evaluated, negotiations will cover such topics as TFL, in its discretion, determines may be necessary. On conclusion of negotiation Bidders will be asked to resubmit the elements of the Bid negotiated on. These elements shall be re-evaluated to the published scoring criteria and a final score given.

CPV: Electrical supplies and accessories · Low- and medium-voltage cable · Low-voltage cable · Parts of electric motors, generators and transformers

The lotProcurement structure

single lot · value published
Lot #1AwardedRenewal 3 yrsSMEPublished value£500,000
Contract period: 1 Jan 2026 – 31 Dec 2028 (3 yrs) · up to 31 Dec 2030 with extensionsValue: £500,000 exc. VAT · £600,000 inc. VAT
Delivery: LondonEligibility: SME eligible
Extensions: The contract has the option to purchase more of the same goods as tended for the purpose of replacing accidental damage during install and to allow for any unforeseen delays. · The contract has the option to be extended in duration for up to 24 months to facilitate unplanned events.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 55%Price: 30%Social value: 15%
Published sub-criteria (3)
  • Project Management: 55%
  • Price: 30%
  • Social Value and Responsible Procurement: 15%
Published award criteria (3)
  • Project Management: Further details can be found within the tender pack on https://service.ariba.com/Supplier.aw. Please contact [email protected].
  • Price: Further details can be found within the tender pack on https://service.ariba.com/Supplier.aw. Please contact [email protected].
  • Social Value and Responsible Procurement: Further details can be found within the tender pack on https://service.ariba.com/Supplier.aw. Please contact [email protected].
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
4 Jul 2025, 11:30 BST
Last source update
31 Jul 2026, 09:15 BST
Award evaluation window
Submission end – 10 Nov 2025
Authority reference
WS1379486589
FTS notice number
2025/S 000-037575
Latest notice
Contract details notice (UK7)
Classification (CPV)
Electrical supplies and accessoriesLow- and medium-voltage cableLow-voltage cableParts of electric motors, generators and transformers
Delivery area
London (UKI)
Official registry OCID
ocds-h6vhtk-0558ed Find a Tender
How it runs

This tender will follow the competitive flexible procedure comprising of five elements; (1) Signed Formal Offer of Tender; (2) Procurement Specific Questionnaire (PSQ) which include the Conditions of Participation; (3) response to the Technical Submission; (4) response to the Project Management Submission; and (5) the Commercial Submission.

Scoring shall be a mix of pass/fail, discretionary pass / fail, and geared score elements which may include minimum pass score where indicated. A 'fail' in a Stage will exclude a Bidder from further consideration.

Once the bids are evaluated, negotiations will cover such topics as TFL, in its discretion, determines may be necessary. On conclusion of negotiation Bidders will be asked to resubmit the elements of the Bid negotiated on. These elements shall be re-evaluated to the published scoring criteria and a final score given.

Review and risk notes
Risks

There is a risk that the design (cable lengths, connection type/specification, etc.) may be incorrect and should this need to be changed it would result in a contract variation.

There is a risk that due to operational considerations that the installation programme may need to be changed which may result in an increase in manufacturing speed and or storage in the manufacture's control or site.

How it was run

Official notice
Run through: SAP Ariba · Who buys & how to bid on SAP Ariba
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free buyer-specific invitations
Submission deadline
11 Aug 2025, 12:00 BST
Clarification deadline
25 Jul 2025, 12:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

This procurement process is being conducted electronically on the e-Tendering portal SAP Ariba. The portal can be accessed via the following link:

service.ariba.com/Supplier.aw ↗

As part of the bid submission Bidders should also be registered on the Central Digital Platform and completed all the relevant registration questions. A useful guide can be found here:

www.youtube.com/watch ↗

To access the procurement documents, tenderers will need to be registered on the e-Tendering portal - SAP Ariba.

The following instructions explain TfL's e-Tendering portal and provide guidance on how interested parties will be able to communicate with TfL in relation to this exercise.

(1) To register or to check if you are already registered to SAP Ariba, log on to service.ariba.com/Supplier.aw ↗ Interested parties must read the instructions carefully before proceeding with registration.

(2) Once you have registered on SAP Ariba (or are already registered), you must also register on TfL's SAP Ariba system through the following link s1-eu.ariba.com/Sourcing/Main/ad/sel… ↗

Guidance on registering is available through the following link: here content.tfl.gov.uk/supplier-registratio… ↗

(3) Upon completion of steps 1 and/or 2, interested parties must inform [email protected] with the following details:

  • your organisation name as registered in SAP Ariba;
  • your applicable supplier ID associated with TfL in SAP Ariba, in the form of SM Vendor ID, or ERP ID, or AN ID, or ACM ID;
  • your single point of contact registered on SAP Ariba; first name and surname;
  • your email address registered with SAP Ariba; and
  • your role in the organisation as registered with SAP Ariba;

Completion of these steps will enable TfL to invite interested parties to the ITT event in SAP Ariba to gain access to the procurement documents, allowing interested bidders to submit their ITT response via SAP Ariba.

Please contact [email protected] in the first instance should you experience any problems with the portal for issues related to items 1 and 2 above.

Tenders must read the instructions carefully before proceeding with registration and are advised to satisfy themselves that they understand all the requirements of the procurement and terms of the contract and the rules of the procurement process before submitting their tender response.

Timeline

4 Jul 2025 → 31 Jul 2026 · 9 dates
  1. Planning notice published
    4 Jul 2025, 11:30 BST
  2. Tender notice published
    4 Jul 2025, 16:58 BST
  3. Clarification questions by
    25 Jul 2025, 12:00 BST
  4. Submission deadline
    11 Aug 2025, 12:00 BST
  5. Award decision expected by348 days ago
    10 Nov 2025, 23:59 GMT
  6. Contract starts297 days ago
    1 Jan 2026
  7. Assessment summaries sent143 days ago
    4 Jun 2026, 00:00 BST
  8. Standstill ends129 days ago
    17 Jun 2026, 23:59 BST
  9. Latest notice published86 days ago
    31 Jul 2026, 09:15 BST

Notice history

11 events · 4 releases on Find a Tender · since 4 Jul 2025
  1. Preliminary market engagement notice published
    4 Jul 2025, 11:30 BST
    UK2
  2. Tender notice published
    4 Jul 2025, 16:58 BST
    UK4
  3. Status changed to active
    4 Jul 2025, 16:58 BST
  4. Procurement method changed
    4 Jul 2025, 16:58 BST
  5. Deadline published: 11 Aug 2025, 12:00 BST
    4 Jul 2025, 16:58 BST
  6. Buyer details updated
    4 Jul 2025, 16:58 BST
  7. Contract award notice published
    4 Jun 2026, 14:13 BST
    UK6
  8. Status changed to complete
    4 Jun 2026, 14:13 BST
  9. Procurement method changed
    4 Jun 2026, 14:13 BST
  10. Contract signature expected
    22 Jun 2026, 23:59 BST
    scheduled
  11. Contract details notice published
    31 Jul 2026, 09:15 BST
    UK7
Routine re-releases (4)
  • 2025-07: 1 release · 4 Jul 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £458,3401 award exc. VAT
Bids received 32 from SMEs
Contracts signed 1latest 17 Jul 2026
Awarded toValueDateStatus
P.K. ENGINEERING (WEST BROMWICH) LIMITED23 Jun 2026 – 22 Jun 2029 · up to 22 Jun 2030Extensions: The contract will be awarded for a period of 3 years and 0 months with extension option(s) up to an additional 12 months and in case any additional components may be needed or change of the programme timeline.£458,3404 Jun 2026Awarded

Contracts

  • Contract 1 · P.K. ENGINEERING (WEST BROMWICH) LIMITED

    Signed
    17 Jul 2026
    Value
    £458,340
    Period
    17 Jul 2026 – 16 Jul 2029 · up to 15 Jul 2030 with extensions
    Status
    active
    Extensions
    The contract will be awarded for a period of 3 years and 0 months with extension option(s) up to an additional 12 months and in case any additional components may be needed or change of the programme timeline

    No agreed KPIs: The decision not to include detailed KPIs in the contract was based on the nature of the agreement. This is a direct supply arrangement for components that have already been subject to interim orders, meaning the performance, quality, and capability have been previously tested and validated. In addition, the contract already incorporates appropriate protection mechanisms, including liquidated damages clauses to address late delivery and any deviation from the agreed delivery schedule. These provisions effectively mitigate performance risks without the need for additional KPI frameworks

Bid statistics published by the authority

BidsSMEVCSEValid bid range
3final-stage tenders · 4 at stage one20—

Contracting authority & participating public bodies

2 public bodies on the notice

London Underground Limited

Contracting authorityPublic undertaking GB-COH: 01900907 · GB-PPON: PWJB-7544-VZCL 5 Endeavour Square, London, London, E20 1JNContact name, email

Other public bodies

  • Transport for LondonProcess contact pointProcuring entityPublic authority - central governmentTransport for London is procuring on behalf of its subsidiary, London Underground Limited.GB-PPON: PHMT-6197-NWNZ London, LondonContact name, email

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications (4)

Official links; attachments are not copied

Notices published for this procedure