Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Page 89 · 10 contracts on this page · more available
- Ends · in 34 days
Unit 47 Greenfield - Low Carbon Heat Grant Works
Flintshire County Council · Local authority · Nationwide (UK)
Incumbent: harley and clarke
Design and construction works associated with the Low Carbon Heat Grant funded improvements at Unit 47, Greenfield Business Park, Greenfield. Harley & Clarke Construction Ltd has been appointed as Principal Contractor under a JCT Design and…
- Published value
- £239k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-078319
- Ends · in 34 days
C4 Dow Beck (Caldewgate) Bridge A595 - Saddling of Profile B & C
Cumberland Council · Local authority · North West England
Incumbent: Metcalfe Plant Hire Limited
Works including the saddling of Profiles B and C, associated masonry repairs, resurfacing works, and utility management at Dow Beck (Caldewgate) Culvert. The proposed saddling works are intended to ensure the structure is suitable for Const…
- Published value
- £236k
- Annual run-rate
- —term under 6 months
- Term
- 29 Jun 2026 → 30 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-06c726
- Ends · in 34 daysExtension option · up to 30 Nov 2027
TVCA-PROC-0532 - Zetland Carpark Operations
Tees Valley Combined Authority · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Vistech Services
Procurement for Operator of Zetland Carpark
- Published value
- £200k
- Annual run-rate
- £202kpublished value ÷ term, exc. VAT
- Term
- 5 Dec 2025 → 30 Nov 2026 · 1 yr · up to 30 Nov 2027 with extensions
- Reference
ocds-h6vhtk-05e6f9
- Ends · in 34 daysExtension option · up to 30 Nov 2027
Mould Control
The Guinness Partnership · Other public body · North West England, Yorkshire and the Humber, East of England, Greater London, South East England, South West England
Incumbent: TIC Mould Control Limited
Trial of a unique product system to assist with mould and damp removal.
- Published value
- £200kinc. VAT as published
- Annual run-rate
- £200kpublished value ÷ term, inc. VAT
- Term
- 1 Dec 2025 → 30 Nov 2026 · 1 yr · up to 30 Nov 2027 with extensions
- Reference
ocds-h6vhtk-060d18
- Ends · in 34 days
Transform Project
London School of Hygiene & Tropical Medicine · Education · Nationwide (UK)
Incumbent: WOMEN ADVOCATES RESEARCH AND DOCUMENTATION CENTRE (W.A.R.D C)
The TRANSFORM project (Tranexamic acid Access for all Mothers with Bleeding after Childbirth) aims to reduce maternal deaths from postpartum haemorrhage (PPH) by generating evidence and creating an enabling environment. The I’M WOMAN trial …
- Published value
- £181k
- Annual run-rate
- £247kpublished value ÷ term, exc. VAT
- Term
- 9 Mar 2026 → 30 Nov 2026 · 9 months
- Reference
ocds-h6vhtk-064db0
- Ends · in 34 days
ARA Review 2026
Post Office Limited · Other public body · Nationwide (UK)
Incumbent: Mazars LLP
Annual Review and Accounts Annual Report and Accounts (ARA) Metrics and Disclosures Review up to £173,000
- Published value
- £173k
- Annual run-rate
- —term under 6 months
- Term
- 13 Jul 2026 → 30 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-078d57
- Ends · in 34 days
Volume grass cutting across Blackburn with Darwen
Blackburn With Darwen Borough Council · Local authority · North West England
Incumbent: Grounds, Gardens & Trees Ltd · Last contest: 2 bids
Lot 1 - Volume grass cutting across Blackburn with Darwen (Highway verges, amenity land, community centres, children play centres, roundabouts and motorway junctions) Lot 2- Cutting of rural verges and hedges across Blackburn with Darwen Lo…
- Published value
- £165k
- Annual run-rate
- —start date not published
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-04e6e0
- Ends · in 34 daysExtension option · up to 30 Nov 2027
Replacement UPS Chigwell
The Police, Fire and Crime Commissioner for Essex · Police & fire · Nationwide (UK)
Incumbent: Kohler uniterruptible Power
Supply & installation of uninterruptible power supply unit Chigwell. The current system after inspection deemed beyond economical repair.
- Published value
- £164k
- Annual run-rate
- £159kpublished value ÷ term, exc. VAT
- Term
- 19 Nov 2025 → 30 Nov 2026 · 1 yr · up to 30 Nov 2027 with extensions
- Reference
ocds-h6vhtk-05f9ec
- Ends · in 34 days
Helsby Primary School Mobiles
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: R G Stones (buildings) Ltd
Mobile buildings for Helsby Primary school
- Published value
- £162kinc. VAT as published
- Annual run-rate
- —not computed
- Term
- 15 Jun 2026 → 30 Nov 2026 · 6 months
- Reference
ocds-h6vhtk-06b271
- Ends · in 34 days
West Berkshire Council/Council Tax and associated mailing services
West Berkshire District Council · Local authority · Nationwide (UK), South East England
Incumbent: CFH Docmail Limited · Last contest: 8 bids (3 SME) · awarded 23% under the estimate
This is an award notice published for the West Berkshire Council’s Revenues and Benefits team for the contract for mailing services (set up, printing, fulfilment and postage) which will cover dispatch of annual Council Tax billing, business…
- Published value
- £161k
- Annual run-rate
- —start date not published
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-04021c
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.