Retender radar: UK public contracts ending soon
Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).
By sector, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services1,17333Medical equipments, pharmaceuticals59179Business services: law, marketing, consulting48072IT services: consulting, software, internet18780Education and training services17860Transport services (except waste transport)17550Repair and maintenance services16715Food, drink, tobacco162
Contracts ending in the next 12 months
Showing 491–500
- Ends · in 199 daysExtension option · up to 30 Apr 2029
Chipping Spreader
Cyngor Gwynedd · Other public body · Nationwide (UK), Wales (Cymru)
Incumbent: Clee Hill Plant Ltd
- Contract value
- £22k
- Annual run-rate
- £12kvalue ÷ published term
- Term
- 9 Jul 2025 → 30 Apr 2027 · 1.8 yrs · up to 30 Apr 2029 with extensions
- Reference
ocds-h6vhtk-04ed9f
- Ends · in 199 daysExtension option · up to 30 Apr 2029Panel · 3 suppliers
Sweeper Medium and Large
Cyngor Gwynedd · Other public body · Nationwide (UK), Wales (Cymru)
Panel: Brodyr Evans, Dawsongroup Environmental Municipal Civil Limited, N.D. BROWN LIMITED (01471913)
- Contract value
- £22k
- Annual run-rate
- —panel, not one supplier
- Term
- 9 Jul 2025 → 30 Apr 2027 · 1.8 yrs · up to 30 Apr 2029 with extensions
- Reference
ocds-h6vhtk-04ed9f
- Ends · in 199 daysExtension option · up to 30 Apr 2029Panel · 2 suppliers
Low Loader with operator
Cyngor Gwynedd · Other public body · Nationwide (UK), Wales (Cymru)
Panel: John Roberts (Ffestiniog) Ltd, Oswyn Roberts Cyf
- Contract value
- £22k
- Annual run-rate
- —panel, not one supplier
- Term
- 9 Jul 2025 → 30 Apr 2027 · 1.8 yrs · up to 30 Apr 2029 with extensions
- Reference
ocds-h6vhtk-04ed9f
- Ends · in 199 daysExtension option · up to 30 Apr 2029Panel · 4 suppliers
4, 6 and 8 Wheeler Lorries with operator
Cyngor Gwynedd · Other public body · Nationwide (UK), Wales (Cymru)
Panel: Brodyr Evans, John Roberts (Ffestiniog) Ltd, Oswyn Roberts Cyf +1 more
- Contract value
- £22k
- Annual run-rate
- —panel, not one supplier
- Term
- 9 Jul 2025 → 30 Apr 2027 · 1.8 yrs · up to 30 Apr 2029 with extensions
- Reference
ocds-h6vhtk-04ed9f
- Ends · in 199 daysExtension option · up to 30 Apr 2029
Sweeper and Operator
Cyngor Gwynedd · Other public body · Nationwide (UK), Wales (Cymru)
Incumbent: Brodyr Evans
- Contract value
- £22k
- Annual run-rate
- £12kvalue ÷ published term
- Term
- 9 Jul 2025 → 30 Apr 2027 · 1.8 yrs · up to 30 Apr 2029 with extensions
- Reference
ocds-h6vhtk-04ed9f
- Ends · in 199 daysExtension option · up to 30 Apr 2029
Tankers with Spraybars
Cyngor Gwynedd · Other public body · Nationwide (UK), Wales (Cymru)
Incumbent: Nynas UK AB
- Contract value
- £22k
- Annual run-rate
- £12kvalue ÷ published term
- Term
- 9 Jul 2025 → 30 Apr 2027 · 1.8 yrs · up to 30 Apr 2029 with extensions
- Reference
ocds-h6vhtk-04ed9f
- Ends · in 202 days
VIVID - Remedial Building and Fire Safety Works at Pemberley Place, Basingstoke
VIVID · South East England
Incumbent: Lawtech Group Ltd
- Contract value
- £7.5m
- Annual run-rate
- —start date not published
- Term
- Ends 3 May 2027 · start not published
- Reference
ocds-h6vhtk-04b440
- Ends · in 204 days
Chatham Court & High Street EA Services
Wandle Housing Association Limited · Charity · Greater London
Incumbent: Re-Gen (UK) Construction Ltd
- Contract value
- £354k
- Annual run-rate
- £537kvalue ÷ published term
- Term
- 7 Sept 2026 → 5 May 2027 · 7 months
- Reference
ocds-h6vhtk-0610e5
- Ends · in 206 daysExtension option · up to 7 Nov 2027
Kingswood Park Restoration and Enhancement Project 2025
South Gloucestershire Council · Local authority · South West England
Incumbent: K.P.Wilton & Son Limited
- Contract value
- £1.6m
- Annual run-rate
- £1.8mvalue ÷ published term
- Term
- 22 Jun 2026 → 7 May 2027 · 10 months · up to 7 Nov 2027 with extensions
- Reference
ocds-h6vhtk-05d10a
- Ends · in 206 days
Bridgwater Town Hall Refurbishment & Extension 2026
Bridgwater Town Council · Local authority · South West England
Incumbent: Qube Construct Ltd
- Contract value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 7 May 2027 · start not published
- Reference
ocds-h6vhtk-064e6f
How to read the radar
- End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.