Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 381–390

  1. Ends · in 169 daysFramework re-let

    Builderwork, fencing, slabbing, landscaping & bin stores

    Cassiltoun Housing Association Ltd. · Housing · Scotland

    Incumbent: idverde Ltd (Formally The Landscape Group Ltd)

    • Building installation work
    • Electrical installation work
    • Installation of doors and windows
    Contract value
    £28kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-035b3a
  2. Ends · in 169 daysExtension option · up to 31 Mar 2029

    Electrician & Power for Southport Events in 2026

    Sefton Metropolitan Borough Council · Local authority · North West England

    Incumbent: Pholex Ltd

    • Electrical installation work
    • Installation services of electrical and mechanical equipment
    Contract value
    £20k
    Annual run-rate
    £20kvalue ÷ published term
    Term
    1 Apr 2026 → 31 Mar 2027 · 11 months · up to 31 Mar 2029 with extensions
    Reference
    ocds-h6vhtk-0610c1
  3. Ends · in 169 days

    MFF 173 2025-2026 Wessenden Valley Rhododendron Removal

    Peak District National Park Authority · Other public body · Yorkshire and the Humber

    Incumbent: Wildscapes CIC Limited

    • Environmental improvement works
    • Scrub-removal work
    • Tree-clearing services
    Contract value
    £11k
    Annual run-rate
    £12kvalue ÷ published term
    Term
    5 May 2026 → 31 Mar 2027 · 10 months
    Reference
    ocds-h6vhtk-05ea49
  4. Ends · in 169 daysFramework re-let

    Out of Hours

    Dalmuir Park Housing Association · Housing · Scotland

    Incumbent: Caledonian Maintenance Services Ltd

    • Building-cleaning services
    • Construction work
    • Drainage works
    Contract value
    £63ceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-05edb7
  5. Ends · in 169 daysFramework re-letPanel · 2 suppliers

    Consultancy (EPCs)

    Dalmuir Park Housing Association · Housing · Scotland

    Panel: Caledonian Maintenance Services Ltd, Procast Building Contractors Ltd.

    • Building-cleaning services
    • Construction work
    • Drainage works
    Contract value
    £60ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-05edb7
  6. Ends · in 169 daysFramework re-letPanel · 2 suppliers

    Windows Doors and Glazing

    Dalmuir Park Housing Association · Housing · Scotland

    Panel: Glasgow glass and locks ltd, Lochlie Construction LTD

    • Building-cleaning services
    • Construction work
    • Drainage works
    Contract value
    £45ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-05edb7
  7. Ends · in 169 daysFramework re-letPanel · 5 suppliers

    Multi Trade

    Dalmuir Park Housing Association · Housing · Scotland

    Panel: CRD Property Renovations and Reinstatements Ltd, Capitol Building and Electrical Services Ltd, David Mitchell Plastering & Building Ltd +2 more

    • Building-cleaning services
    • Construction work
    • Drainage works
    Contract value
    £41ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-05edb7
  8. Ends · in 169 daysFramework re-letPanel · 3 suppliers

    Stonework

    Dalmuir Park Housing Association · Housing · Scotland

    Panel: C-B-C Stone Restoration and Conservation Limited, Caledonian Maintenance Services Ltd, EBS Construction Limited

    • Building-cleaning services
    • Construction work
    • Drainage works
    Contract value
    £39ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-05edb7
  9. Ends · in 169 daysFramework re-letPanel · 3 suppliers

    Boilers and CH

    Dalmuir Park Housing Association · Housing · Scotland

    Panel: BRB Electrical Limited, John Doherty & Co. Ltd., The Edinburgh Boiler Company

    • Building-cleaning services
    • Construction work
    • Drainage works
    Contract value
    £38ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-05edb7
  10. Ends · in 169 daysFramework re-letPanel · 2 suppliers

    Medical Adaptations

    Dalmuir Park Housing Association · Housing · Scotland

    Panel: H Clarke & Sons Limited T/A HCS Mechanical and Electrical Services, Kerr & Taggart Developments Ltd

    • Building-cleaning services
    • Construction work
    • Drainage works
    Contract value
    £36ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-05edb7
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.