  1. Estimated end · in 290 days

    Damp & Mould Remedials Contract

    Babergh District Council · Local authority · East of England

    Incumbent: Principle Construction And Maintenance Ltd · Last contest: 4 bids (4 SME)

    Babergh District Council and Mid Suffolk District Council are looking to jointly procure one Contractor for the delivery of their Damp andMould Remedial Works Contract.The estimated annual combined contract values are circa GBP250000.00 to …

    • Refurbishment work
    Published value
    £1.8m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0495f2
  2. Estimated end · in 290 days

    Damp & Mould Remedial Consultancy Contract

    Babergh District Council · Local authority · East of England

    Incumbent: Compliance 100 Ltd · Last contest: 4 bids (4 SME)

    • Refurbishment work
    Published value
    £1.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0495f2
  3. Estimated end · in 290 days

    DMNV 028 - Biochar Pyrolysis Production Plant - Ludlow

    Shropshire Council · Local authority · West Midlands

    Incumbent: Biodynamic Carbon Limited · Last contest: 2 bids (2 SME) · awarded 43% over the estimate

    This is an award notice for the design, procurement, construction, commissioning and operation and maintenance of a biomass Pyrolysis Plant. This includes the provision of instrumentation, control and automation of the equipment, civils and…

    • Construction works for power plants and heating plants
    Published value
    £1.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-046fb4
  4. Ends · in 291 daysExtension option · up to 16 Aug 2028

    Solar PV supply and installations works

    East Midlands Housing Group · Housing · East Midlands

    Incumbent: Phoenix Gas Services Ltd

    To supply and install Solar PV to social housing.

    Published value
    £2.0m
    Annual run-rate
    £2.0mpublished value ÷ term, exc. VAT
    Term
    17 Aug 2026 → 16 Aug 2027 · 1 yr · up to 16 Aug 2028 with extensions
    Reference
    ocds-h6vhtk-06e57f
  5. Ends · in 291 days

    Office Works

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: James Roofing & Construction Ltd

    Capital Expenditure Goodmayes Relocate Estates 1. Strip Out & Enabling Works Provide all labour, plant, supervision, access equipment and waste disposal required to complete the initial strip out and preparation works. 2. Acoustic, Fire-Rat…

    Published value
    £156k
    Annual run-rate
    £156kpublished value ÷ term, exc. VAT
    Term
    17 Aug 2026 → 16 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06e929
  6. Ends · in 292 days

    Replacement air conditioning unit Cavendish Road.

    Stevenage Borough Council · Local authority · East of England

    Incumbent: Pitkin and Ruddock

    Cavendish Road. Replacement air conditioning units to serve the Server Room.

    Published value
    £29k
    Annual run-rate
    £29kpublished value ÷ term, exc. VAT
    Term
    17 Aug 2026 → 17 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-0773c1
  7. Estimated end · in 294 days

    Hawkwood Road Redevelopment - Main Build

    Bournemouth, Christchurch and Poole Council · Local authority · South West England

    Incumbent: AJC Developments (South) Ltd · Last contest: 4 bids (4 SME)

    The construction of 68 residential flats and a medical centre over three buildings, creation of a new park, bike stores, refuse bin stores, associated parking, any highway works required and all associated hard and soft landscaping at the m…

    • Construction work
    Published value
    £18m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-04b0da
  8. Ends · in 294 days

    Harrington Hill Primary School - Appointment of a multi disciplinary consultant to design, manage and provide contract administration

    London Borough of Hackney · Local authority · Greater London

    Incumbent: Daniel Connal LLP

    Appointment of a multi disciplinary consultant to design, manage and provide contract administration for the project to provide a safe and suitable play area to support the Council’s school reorganisation strategy.

    Published value
    £33k
    Annual run-rate
    £22kpublished value ÷ term, exc. VAT
    Term
    9 Feb 2026 → 19 Aug 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-064a1b
  9. Ends · in 295 days

    Kitchen Refurb

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: James Roofing & Construction Ltd

    Capital Expenditure Brookside Kitchen Refurbishment Strip Out Works Preparation and Temporary Facilities Wall Cladding Installation Works Fixtures, Fabrication, Mechanical Installations and Completion Works Mechanical Ventilation Works Addi…

    Published value
    £19k
    Annual run-rate
    £19kpublished value ÷ term, exc. VAT
    Term
    19 Aug 2026 → 20 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06e92a
  10. Estimated end · in 296 daysCall-off

    Abri- Design Supply and Installation of CAT2 MMC system at Sherecroft Farm Botley

    Abri Group Limited · Nationwide (UK), South East England

    Incumbent: SAINT-GOBAIN PAM UK · Last contest: 2 bids (0 SME)

    • Construction work
    Published value
    £2.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 21 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0329e1

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months928
  2. 3–6 months583
  3. 6–12 months597
  4. 12–24 months740

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.