Retender radar: UK public contracts ending soon
Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Repair and maintenance services i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
275 contracts end within 24 months, 424 in total · £52m published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).
By sector, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services1,17133Medical equipments, pharmaceuticals59179Business services: law, marketing, consulting48172IT services: consulting, software, internet18580Education and training services17860Transport services (except waste transport)17550Repair and maintenance services16715Food, drink, tobacco164
Contracts ending in the next 12 months
Showing 241–255
- Ends · in 260 days
North East Scotland
Hillcrest · Scotland
Incumbent: Caltech Lifts Limited
- Contract value
- £36k
- Annual run-rate
- —start date not published
- Term
- Ends 30 Jun 2027 · start not published
- Reference
ocds-h6vhtk-05004e
- Ends · in 262 daysFramework re-let
24-071 Closed Landfill Maintenance
Rotherham Metropolitan Borough Council · Local authority · Yorkshire and the Humber
Incumbent: Waste Management Maintenance Ltd
- Contract value
- £232kceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 2 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e672
- Ends · in 265 daysFramework re-letPanel · 8 suppliers
Lot 1 - Materials Handlers
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, Clee Hill Plant Ltd, GAP Group Limited +5 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 7 suppliers
Lot 10 - Breakers
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited +4 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 6 suppliers
Lot 11 - Drilling and Fixing Equipment
ESPO · Nationwide (UK)
Panel: CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited, HSS HIRE SERVICE GROUP LIMITED +3 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 6 suppliers
Lot 12 - Saws/Cutters
ESPO · Nationwide (UK)
Panel: CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited, HSS HIRE SERVICE GROUP LIMITED +3 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 5 suppliers
Lot 13 - Concreting Equipment
ESPO · Nationwide (UK)
Panel: CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited, Hire Station Limited t/a Brandon Hire Station +2 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 6 suppliers
Lot 14 - Hydraulic Platforms/Lifts
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, GAP Group Limited, HSS HIRE SERVICE GROUP LIMITED +3 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 5 suppliers
Lot 15 - Trench Support/Access Equipment
ESPO · Nationwide (UK)
Panel: CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited, HSS HIRE SERVICE GROUP LIMITED +2 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 8 suppliers
Lot 16 - Generators/Floodlights
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited +5 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 5 suppliers
Lot 17 - Temporary Site and Office Accommodation
ESPO · Nationwide (UK)
Panel: Clee Hill Plant Ltd, HSS HIRE SERVICE GROUP LIMITED, J.B. TOOL HIRE LIMITED +2 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 3 suppliers
Lot 18 - Horticultural and Forestry Equipment
ESPO · Nationwide (UK)
Panel: GAP Group Limited, J.B. TOOL HIRE LIMITED, Sunbelt Rentals Ltd
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 4 suppliers
Lot 19 - Pothole Repair Machines
ESPO · Nationwide (UK)
Panel: Clee Hill Plant Ltd, Dawsongroup Environmental Municipal Civil Limited, J.B. TOOL HIRE LIMITED +1 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 8 suppliers
Lot 2 - Excavators
ESPO · Nationwide (UK)
Panel: A E Faulks Ltd, Clee Hill Plant Ltd, GAP Group Limited +5 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 5 suppliers
Lot 20 - Other Items
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited +2 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
How to read the radar
- End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.