Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Page 11 · 10 contracts on this page · more available
- Ends · in 6 days
25/0394/H
Borough of Telford & Wrekin · Local authority · Nationwide (UK)
Incumbent: Broad Oak Properties Limited
Specialist ramp, WC alteration
- Published value
- £11k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 30 Oct 2026 · 33 days
- Reference
ocds-h6vhtk-07829b
- Ends · in 6 days
25/0370/H
Borough of Telford & Wrekin · Local authority · Nationwide (UK)
Incumbent: WB BUILDING SERVICES LIMITED
level access shower
- Published value
- £7k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 30 Oct 2026 · 33 days
- Reference
ocds-h6vhtk-07828c
- Ends · in 6 days
Insurance and related services associated with Terrorism / Political Violence (Non-Pool Re) Risks for The Sovini Group
The Sovini Group · Nationwide (UK)
Incumbent: Weald Insurance Brokers Limited · Last contest: 2 bids
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 30 Oct 2026 · start not published
- Reference
ocds-h6vhtk-03c5cf
- Estimated end · in 6 daysFramework recordPanel · 13 suppliers
Framework for Home Care and Outreach Support Services
London Borough of Hillingdon · Local authority · Nationwide (UK)
Panel: AMI HOME CARE LIMITED, Avant Healthcare Services Ltd, EQUICARE SERVICES LTD +10 more
- Published value
- £24mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-034497
- Estimated end · in 6 days
C280 (2018) Supply of LV and HV Resins and Compounds
Northern Ireland Electricity Networks Limited · Northern Ireland
Incumbent: Prysmian Cables & Systems Ltd
- Published value
- £3.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-05a20f
- Estimated end · in 6 daysCall-offPanel · 4 suppliers
Lot 1 - Economic/Financial/Regulation Strategy
Northern Ireland Electricity Networks Limited · Northern Ireland
Panel: Ernst and Young LLP, Frontier Economics, NERA UK Limited +1 more
The Contracting Entity intends to establish Framework Arrangements for the provision of Price Control Support: Economic, Engineering, Low Carbon Technology and Climate Change Consultancy. The Framework Agreements will be for a period of thr…
- Published value
- £1.5mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-02b182
- Estimated end · in 6 daysCall-offPanel · 2 suppliers
Lot 2 - Low Carbon Technology Forecasting
Northern Ireland Electricity Networks Limited · Northern Ireland
Panel: Enzen Global Limited, WSP UK Limited
The Contracting Entity intends to establish Framework Arrangements for the provision of Price Control Support: Economic, Engineering, Low Carbon Technology and Climate Change Consultancy. The Framework Agreements will be for a period of thr…
- Published value
- £500kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-02b182
- Estimated end · in 6 daysCall-off
Engineering / (Techno-Economic) specialist advisers
Northern Ireland Electricity Networks Limited · Northern Ireland
Incumbent: WSP UK Limited
The Contracting Entity intends to establish Framework Arrangements for the provision of Price Control Support: Economic, Engineering, Low Carbon Technology and Climate Change Consultancy. The Framework Agreements will be for a period of thr…
- Published value
- £500kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-02b182
- Estimated end · in 6 daysCall-off
Fast Track (End of Life) - Nursing (General)
NHS Cambridgeshire and Peterborough Integrated Care Board · NHS & health · West Midlands, East of England, Northern Ireland
Incumbent: St Georges Nursing Home · Last contest: 11 bids (1 SME)
- Published value
- £6kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-0292a9
- Estimated end · in 6 daysCall-off
Fast Track (End of Life) - Nursing (General)
NHS Cambridgeshire and Peterborough Integrated Care Board · NHS & health · West Midlands, East of England, Northern Ireland
Incumbent: WT UK Opco 4 Ltd · Last contest: 11 bids (1 SME)
- Published value
- £5kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-0292a9
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.