Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Sewage, refuse, cleaning and environmental
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

285 contracts end within 24 months, 3,042 in total · £2.0bn published GBP value, exc. VAT, in the all future end dates (framework ceilings included, not a spend forecast).

  1. Next 3 months24
  2. 3–6 months55
  3. 6–12 months69
  4. 12–24 months137

By sector, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the all future end dates

Showing 541–555

  1. Ends · in 509 daysFramework re-letExtension option · up to 5 Mar 2030Panel · 5 suppliers

    Lot 2-Asbestos Testing/ Analytical Services

    City & County of Swansea · Local authority · Wales (Cymru)

    Panel: ACS Asbestos Measurement & Testing, ANCHEM LABORATORIES LIMITED, Environtec Limited +2 more

    • Asbestos removal services
    • Asbestos-removal work
    • Building surveying services
    Contract value
    £0ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    6 Mar 2026 → 5 Mar 2028 · 1.9 yrs · up to 5 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-0594b0
  2. Ends · in 509 daysFramework re-letExtension option · up to 5 Mar 2030Panel · 8 suppliers

    LOT 3 - (HSE) Asbestos Removal

    City & County of Swansea · Local authority · Wales (Cymru)

    Panel: ASPECT CONTRACTS LIMITED, Bond Demolition Ltd, Econ Group Ltd +5 more

    • Asbestos removal services
    • Asbestos-removal work
    • Building surveying services
    Contract value
    £0ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    6 Mar 2026 → 5 Mar 2028 · 1.9 yrs · up to 5 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-0594b0
  3. Ends · in 512 daysExtension option · up to 8 Mar 2030

    Skip hire and waste disposal

    Be One Homes · Other public body · North West England

    Incumbent: J Dickinson & Sons (Horwich) Ltd

    • Refuse and waste related services
    • Refuse skips
    • Waste transfer station
    Contract value
    £835k
    Annual run-rate
    £417kvalue ÷ published term
    Term
    9 Mar 2026 → 8 Mar 2028 · 1.9 yrs · up to 8 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-05899d
  4. Ends · in 512 daysExtension option · up to 8 Mar 2030

    Direct tipping, segregation and recycling of general trade waste 5 > 10 miles of BL1 8TU

    Be One Homes · Other public body · North West England

    Incumbent: J Dickinson & Sons (Horwich) Ltd

    • Refuse and waste related services
    • Refuse skips
    • Waste transfer station
    Contract value
    £248k
    Annual run-rate
    £124kvalue ÷ published term
    Term
    9 Mar 2026 → 8 Mar 2028 · 1.9 yrs · up to 8 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-05899d
  5. Ends · in 514 daysExtension option · up to 10 Mar 2030

    Direct tipping, segregation and recycling of general trade waste > 5 miles of BL1 8TU

    Be One Homes · Other public body · North West England

    Incumbent: EVERGREEN WASTE SERVICES LTD

    • Refuse and waste related services
    • Refuse skips
    • Waste transfer station
    Contract value
    £290k
    Annual run-rate
    £145kvalue ÷ published term
    Term
    11 Mar 2026 → 10 Mar 2028 · 1.9 yrs · up to 10 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-05899d
  6. Ends · in 518 days

    Provision for Recycling & Disposal of Highways Construction and Street Residue Waste Materials

    Monmouthshire County Council · Local authority · Wales (Cymru)

    Incumbent: GD Environmental Services Ltd

    • Non-hazardous refuse and waste treatment and disposal services
    Contract value
    £1.1m
    Annual run-rate
    —start date not published
    Term
    Ends 14 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-0289e0
  7. Ends · in 519 daysFramework re-let

    Package 3 Turley Holes & Higher Moor ground works

    Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Conservefor Ltd

    • Construction work for dams, canals, irrigation channels and aqueducts
    • Environmental protection
    • Excavating work
    Contract value
    £183kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    6 Jun 2026 → 15 Mar 2028 · 1.8 yrs
    Reference
    ocds-h6vhtk-05849a
  8. Ends · in 519 daysFramework re-let

    Package 5 Soyland

    Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Conservefor Ltd

    • Construction work for dams, canals, irrigation channels and aqueducts
    • Environmental protection
    • Excavating work
    Contract value
    £127kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    6 Jun 2026 → 15 Mar 2028 · 1.8 yrs
    Reference
    ocds-h6vhtk-05849a
  9. Ends · in 519 daysFramework re-let

    Package 6 Soyland planting

    Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: AITCH CONSERVATION LTD

    • Construction work for dams, canals, irrigation channels and aqueducts
    • Environmental protection
    • Excavating work
    Contract value
    £108kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    6 Jun 2026 → 15 Mar 2028 · 1.8 yrs
    Reference
    ocds-h6vhtk-05849a
  10. Ends · in 519 daysFramework re-let

    Package 8 Moscar & Rivelin planting

    Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: UPLAND ENVIRONMENTAL LTD

    • Construction work for dams, canals, irrigation channels and aqueducts
    • Environmental protection
    • Excavating work
    Contract value
    £75kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    6 Jun 2026 → 15 Mar 2028 · 1.8 yrs
    Reference
    ocds-h6vhtk-05849a
  11. Ends · in 519 daysFramework re-let

    Package 7 Moscar & Rivelin

    Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: ELMS contracting ltd

    • Construction work for dams, canals, irrigation channels and aqueducts
    • Environmental protection
    • Excavating work
    Contract value
    £69kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    6 Jun 2026 → 15 Mar 2028 · 1.8 yrs
    Reference
    ocds-h6vhtk-05849a
  12. Ends · in 531 daysFramework re-letExtension option · up to 30 Mar 2030Panel · 8 suppliers

    Environmental Decontamination 2026

    SUPPLY CHAIN COORDINATION LIMITED · Other public body · Nationwide (UK)

    Panel: DARO GROUP LIMITED, Ecolab Ltd, GAMA Healthcare Ltd +5 more

    • Air pollution monitoring or measurement services
    • Cleaning products
    • Cleaning services
    Contract value
    £28mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    30 Mar 2026 → 27 Mar 2028 · 1.9 yrs · up to 30 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-051933
  13. Ends · in 531 daysFramework re-letExtension option · up to 30 Mar 2030Panel · 4 suppliers

    Environmental Decontamination 2026

    SUPPLY CHAIN COORDINATION LIMITED · Other public body · Nationwide (UK)

    Panel: ARCHITECTURAL WALLSZ (INTERNATIONAL) LIMITED, Ecolab Ltd, GAMA Healthcare Ltd +1 more

    • Air pollution monitoring or measurement services
    • Cleaning products
    • Cleaning services
    Contract value
    £28mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    30 Mar 2026 → 27 Mar 2028 · 1.9 yrs · up to 30 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-051933
  14. Ends · in 531 daysFramework re-letExtension option · up to 30 Mar 2030Panel · 8 suppliers

    Environmental Decontamination 2026

    SUPPLY CHAIN COORDINATION LIMITED · Other public body · Nationwide (UK)

    Panel: Air Sentry Limited, Airbon Ltd, GAMA Healthcare Ltd +5 more

    • Air pollution monitoring or measurement services
    • Cleaning products
    • Cleaning services
    Contract value
    £28mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    30 Mar 2026 → 27 Mar 2028 · 1.9 yrs · up to 30 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-051933
  15. Ends · in 531 daysFramework re-letExtension option · up to 30 Mar 2030Panel · 6 suppliers

    Environmental Decontamination 2026

    SUPPLY CHAIN COORDINATION LIMITED · Other public body · Nationwide (UK)

    Panel: CK FACILITIES MANAGEMENT LTD, Ecolab Ltd, Hygiene Pro Clean Limited +3 more

    • Air pollution monitoring or measurement services
    • Cleaning products
    • Cleaning services
    Contract value
    £28mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    30 Mar 2026 → 27 Mar 2028 · 1.9 yrs · up to 30 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-051933
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.