Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

148 contracts end within 24 months, 242 in total · £1.7bn published GBP value, exc. VAT, in the next 24 months (framework ceilings included, not a spend forecast).

  1. Next 3 months16
  2. 3–6 months33
  3. 6–12 months39
  4. 12–24 months60

By sector, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 24 months

Showing 1,126–1,140

  1. Ends · in 564 daysExtension option · up to 30 Apr 2030Panel · 4 suppliers

    Fitters for uPVC Windows and Doors - Vision Products RCT

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Panel: ALUMINIUM DOOR SPECIALISTS LIMITED, Allfit UPVC Installations Ltd, Ecoshield Windows Limited +1 more

    • Installation of doors and windows
    • Installation of doors and windows and related components
    • Installation of window frames
    Contract value
    £417k
    Annual run-rate
    —panel, not one supplier
    Term
    1 May 2026 → 30 Apr 2028 · 1.9 yrs · up to 30 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-060d12
  2. Ends · in 564 daysFramework re-letPanel · 23 suppliers

    The Council of the Borough of Kirklees

    Kirklees Council · Local authority · Yorkshire and the Humber

    Panel: Access Hire Nationwide, Arrow Self Drive, Chippindale Plant Ltd +20 more

    • Construction machinery and equipment
    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    • Construction work
    Contract value
    £400kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 30 Apr 2028 · start not published
    Reference
    ocds-h6vhtk-043b27
  3. Ends · in 564 daysFramework re-letPanel · 22 suppliers

    City of York Council

    Kirklees Council · Local authority · Yorkshire and the Humber

    Panel: Access Hire Nationwide, Arrow Self Drive, Chippindale Plant Ltd +19 more

    • Construction machinery and equipment
    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    • Construction work
    Contract value
    £400kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 30 Apr 2028 · start not published
    Reference
    ocds-h6vhtk-043b27
  4. Ends · in 564 days

    Hoglands Skatepark

    Southampton City Council · Local authority · South East England

    Incumbent: SCHOFIELD GROUNDWORKS LIMITED

    • Architectural, construction, engineering and inspection services
    • Building completion work
    • Building construction work
    Contract value
    £347k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Apr 2028 · start not published
    Reference
    ocds-h6vhtk-043b43
  5. Ends · in 564 daysFramework re-letPanel · 23 suppliers

    The Borough of Calderdale Council

    Kirklees Council · Local authority · Yorkshire and the Humber

    Panel: Access Hire Nationwide, Arrow Self Drive, Chippindale Plant Ltd +20 more

    • Construction machinery and equipment
    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    • Construction work
    Contract value
    £300kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 30 Apr 2028 · start not published
    Reference
    ocds-h6vhtk-043b27
  6. Ends · in 564 days

    Hoglands Skatepark

    Southampton City Council · Local authority · South East England

    Incumbent: SCHOFIELD GROUNDWORKS LIMITED

    • Architectural, construction, engineering and inspection services
    • Building completion work
    • Building construction work
    Contract value
    £300k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Apr 2028 · start not published
    Reference
    ocds-h6vhtk-043b43
  7. Ends · in 564 daysFramework re-letPanel · 23 suppliers

    City of Bradford Metropolitan District Council

    Kirklees Council · Local authority · Yorkshire and the Humber

    Panel: Access Hire Nationwide, Arrow Self Drive, Chippindale Plant Ltd +20 more

    • Construction machinery and equipment
    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    • Construction work
    Contract value
    £200kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 30 Apr 2028 · start not published
    Reference
    ocds-h6vhtk-043b27
  8. Ends · in 564 days

    Hoglands Skatepark

    Southampton City Council · Local authority · South East England

    Incumbent: KOMPAN Limited

    • Architectural, construction, engineering and inspection services
    • Building completion work
    • Building construction work
    Contract value
    £200k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Apr 2028 · start not published
    Reference
    ocds-h6vhtk-043b43
  9. Ends · in 564 daysExtension option · up to 30 Apr 2030

    Framework Agreement for Carriageway Retexturing

    Cyngor Gwynedd · Other public body · Wales (Cymru)

    Incumbent: Nolan Road Marking Ltd

    • Demolition, site preparation and clearance work
    • Excavating and earthmoving work
    • Road-construction materials
    Contract value
    £200k
    Annual run-rate
    £100kvalue ÷ published term
    Term
    5 May 2026 → 30 Apr 2028 · 1.9 yrs · up to 30 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-064ef3
  10. Ends · in 564 daysExtension option · up to 30 Apr 2030Panel · 2 suppliers

    Framework Agreement for Carriagway Retexuring

    Cyngor Gwynedd · Other public body · Wales (Cymru)

    Panel: Foster Contracting Ltd, Nolan Road Marking Ltd

    • Demolition, site preparation and clearance work
    • Excavating and earthmoving work
    • Road-construction materials
    Contract value
    £200k
    Annual run-rate
    —panel, not one supplier
    Term
    5 May 2026 → 30 Apr 2028 · 1.9 yrs · up to 30 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-064ef3
  11. Ends · in 564 daysExtension option · up to 30 Apr 2030Panel · 2 suppliers

    Contract 1. LOTC1 - C1 - Road Marking (Superimposed horizontal road markings

    Cyngor Gwynedd · Other public body · Wales (Cymru)

    Panel: Glamorgan White Lining Ltd, L&R Roadlines Ltd

    • Road-construction materials
    • Siteworks
    Contract value
    £200k
    Annual run-rate
    —panel, not one supplier
    Term
    21 May 2026 → 30 Apr 2028 · 1.9 yrs · up to 30 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-06629b
  12. Ends · in 564 daysExtension option · up to 30 Apr 2030Panel · 2 suppliers

    Contract 2. LOTC2 C2 - Road Studs (Retro reflecting road studs)

    Cyngor Gwynedd · Other public body · Wales (Cymru)

    Panel: Glamorgan White Lining Ltd, L&R Roadlines Ltd

    • Road-construction materials
    • Siteworks
    Contract value
    £200k
    Annual run-rate
    —panel, not one supplier
    Term
    21 May 2026 → 30 Apr 2028 · 1.9 yrs · up to 30 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-06629b
  13. Ends · in 564 daysExtension option · up to 30 Apr 2030Panel · 2 suppliers

    Contract 3. LOTC3 C3 - High Friction Surfacing

    Cyngor Gwynedd · Other public body · Wales (Cymru)

    Panel: Glamorgan White Lining Ltd, L&R Roadlines Ltd

    • Road-construction materials
    • Siteworks
    Contract value
    £200k
    Annual run-rate
    —panel, not one supplier
    Term
    21 May 2026 → 30 Apr 2028 · 1.9 yrs · up to 30 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-06629b
  14. Ends · in 564 daysExtension option · up to 30 Apr 2030Panel · 2 suppliers

    Contract 4. LOTC4 C4 - Thermoplastic Road Repair

    Cyngor Gwynedd · Other public body · Wales (Cymru)

    Panel: Glamorgan White Lining Ltd, L&R Roadlines Ltd

    • Road-construction materials
    • Siteworks
    Contract value
    £200k
    Annual run-rate
    —panel, not one supplier
    Term
    21 May 2026 → 30 Apr 2028 · 1.9 yrs · up to 30 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-06629b
  15. Ends · in 564 daysExtension option · up to 30 Apr 2030Panel · 2 suppliers

    Contract 5. LOTC5 C5 - Traffic Management

    Cyngor Gwynedd · Other public body · Wales (Cymru)

    Panel: Glamorgan White Lining Ltd, L&R Roadlines Ltd

    • Road-construction materials
    • Siteworks
    Contract value
    £200k
    Annual run-rate
    —panel, not one supplier
    Term
    21 May 2026 → 30 Apr 2028 · 1.9 yrs · up to 30 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-06629b
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.