Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 3 months

Page 54 · 15 contracts on this page · more available

  1. Ends · in 31 days

    Provision of Mechanical & Electrical (M&E) Engineering Services for RIBA Stages 0–3

    The Mayor and Commonalty and Citizens of the City of London · Local authority

    Incumbent: Frankham Consultancy Group Ltd

    Provision of Mechanical & Electrical (M&E) Engineering Consultancy Services for RIBA Stages 0–3 in respect of Bowater House Stanley Cohen House Services form part of Phase 2C of the Golden Lane Estate Investment Programme and include M&E su…

    Published value
    £196kinc. VAT as published
    Annual run-rate
    £171kpublished value ÷ term, inc. VAT
    Term
    10 Oct 2025 → 1 Dec 2026 · 1.2 yrs
    Reference
    ocds-h6vhtk-066b77
  2. Ends · in 31 daysExtension option · up to 1 Dec 2028

    Fundraising Consultant for St George's Guildhall and Creative Hub Project

    King's Lynn and West Norfolk Borough Council · Local authority · East of England

    Incumbent: Cause4 Ltd

    The Borough Council of King's Lynn and West Norfolk is inviting quotations for a Fundraising Consultant to drive the fundraising strategy of the St Georges Guildhall & Creative Hub project.

    Published value
    £163kinc. VAT as published
    Annual run-rate
    £197kpublished value ÷ term, inc. VAT
    Term
    3 Feb 2026 → 1 Dec 2026 · 10 months · up to 1 Dec 2028 with extensions
    Reference
    ocds-h6vhtk-05107c
  3. Ends · in 31 days

    Venture house suite 8&9 HVAC replacement

    Chesterfield Borough Council · Local authority · East Midlands

    Incumbent: Airflow Cooling Ltd

    Purchase and installation of a HVAC system to suites 8&9 replacing the obsolete and problematic water based cooling system

    Published value
    £138k
    Annual run-rate
    —term under 6 months
    Term
    1 Jul 2026 → 1 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-06b1be
  4. Ends · in 31 days

    Appointment and Management of the Multi-Disciplinary Design Team for GYBC Cremator Plant Replacement and Site Expansion

    Great Yarmouth Borough Council · Local authority · East of England

    Incumbent: Gentoo Project Management Limited

    Great Yarmouth Borough Council (GYBC) is seeking a supplier to appoint and manage the multidisciplinary Design Team required for the Cremator Plant Replacement & Site Expansion project at Great Yarmouth Crematorium. The selected supplier wi…

    Published value
    £134k
    Annual run-rate
    £222kpublished value ÷ term, exc. VAT
    Term
    25 Apr 2026 → 1 Dec 2026 · 7 months
    Reference
    ocds-h6vhtk-0669ef
  5. Ends · in 31 days

    Corrib Rd Playground Design, Supply & Installation

    BLACKPOOL COUNCIL · Local authority · North West England

    Incumbent: KOMPAN Limited

    Corrib Road Playground is located within a green space at the base of the hill in Devonshire Road Rock Gardens, a well-used park that serves both existing residents and a growing local community. The site is accessible from surrounding stre…

    Published value
    £126kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    29 Sept 2026 → 1 Dec 2026 · 2 months
    Reference
    ocds-h6vhtk-077bf6
  6. Ends · in 31 days

    Eagle Kitchen Block Refurbishment

    Eagle & Swinethorpe Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Belton Construction

    Scope of works - Demolition- • Strip out all windows and doors. • Remove existing fascia, guttering and downpipes • Remove existing roof covering • Fully strip out all internal fittings, ceilings and floor coverings • Strip out and isolate …

    Published value
    £120k
    Annual run-rate
    —term under 6 months
    Term
    1 Jul 2026 → 1 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-0663ce
  7. Ends · in 31 days

    HSC Building Management System (BMS) Upgrade

    London Borough of Hackney · Local authority · Nationwide (UK)

    Incumbent: Siemsatec Ltd

    Hackney Council (the Authority) is issuing this Invitation to Tender ("ITT") in connection with the Procurement of a contractor for the Building Management System upgrade at the Hackney Service Centre, 1 Hillman St, London E8 1DY.…

    Published value
    £101k
    Annual run-rate
    —term under 6 months
    Term
    2 Nov 2026 → 1 Dec 2026 · 30 days
    Reference
    ocds-h6vhtk-077ad1
  8. Ends · in 31 daysExtension option · up to 1 Dec 2027

    Independent Complaints Investigators

    Suffolk County Council · Local authority · East of England

    Incumbent: RRC (RRCONSULTANCY) LTD

    Suffolk County Council required procurement of Independent Complaints Investigators services.

    Published value
    £100k
    Annual run-rate
    £100kpublished value ÷ term, exc. VAT
    Term
    2 Dec 2025 → 1 Dec 2026 · 1 yr · up to 1 Dec 2027 with extensions
    Reference
    ocds-h6vhtk-068f59
  9. Ends · in 31 days

    LB Hillingdon-Queens Walk East- Flood Restoration Project

    London Borough of Hillingdon · Local authority · Greater London

    Incumbent: Salix River and Wetland Services Limited · Last contest: awarded 19% over the estimate

    LB Hillingdon wa seeking a suitably qualified and experienced supplier in relation to entering into contract for flood restoration works at Queens Walk East on behalf of the London Borough of Hillingdon.

    Published value
    £100kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    2 Nov 2026 → 1 Dec 2026 · 30 days
    Reference
    ocds-h6vhtk-06d338
  10. Ends · in 31 days

    Fire Doors Remedial Action - Bernie Grant

    London Borough of Haringey · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Fire React Ltd

    To undertake essential fire door remedial actions to the Bernie Grant Arts Centre Performance Building

    Published value
    £98kinc. VAT as published
    Annual run-rate
    £97kpublished value ÷ term, inc. VAT
    Term
    1 Dec 2025 → 1 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-06a47e
  11. Ends · in 31 days

    Conservation Area Appraisals

    East Lindsey District Council · Local authority · East Midlands

    Incumbent: IRVING PATRICK CONSULTING LTD

    Conservation Area Appraisals Consultants

    Published value
    £96k
    Annual run-rate
    £96kpublished value ÷ term, exc. VAT
    Term
    1 Dec 2025 → 1 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-05df13
  12. Ends · in 31 days

    Corner Plot - Project Management Support

    Rochdale Borough Council · Local authority · North West England

    Incumbent: Walker Sime Limited

    The Council procured someone to offer Project Management support throughout the duration of the corner plot project through a below-threshold restricted tender process.

    Published value
    £95k
    Annual run-rate
    £76kpublished value ÷ term, exc. VAT
    Term
    1 Sept 2025 → 1 Dec 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-05888b
  13. Ends · in 31 days

    Bridge Plate Bonding Schemes - Blaby & Soar Mills

    Leicestershire County Council · Local authority · East Midlands

    Incumbent: Composites Construction UK

    Strengthening of two bridge structures by use of plate bonding technique. Strengthening required due to failed capacity assessments. Essential works to ensure safe and functional highway network. Specialist design & build contractor require…

    Published value
    £70k
    Annual run-rate
    £70kpublished value ÷ term, exc. VAT
    Term
    2 Dec 2025 → 1 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-05ee94
  14. Ends · in 31 days

    Design of Phase 1 of the managed retreat at Cowbar Cottages

    Redcar and Cleveland Borough Council · Local authority · North East England

    Incumbent: Faithful+Gould

    Contract award for the Design of Phase 1 of the managed retreat at Cowbar Cottages Contract procured via a Direct Award via NEPO 212 Support Services for the Built Environment Framework, under Lot 2 - Multi Disciplinary - Highways, Transpor…

    Published value
    £60k
    Annual run-rate
    £48kpublished value ÷ term, exc. VAT
    Term
    1 Sept 2025 → 1 Dec 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-05f12b
  15. Ends · in 31 days

    LB HIllingdon- Grange Park Wetlands-Flood Restoration Project

    London Borough of Hillingdon · Local authority · Greater London

    Incumbent: Salix River and Wetland Services Limited · Last contest: awarded 3% under the estimate

    LB Hillingdon was seeking a suitably qualified and experienced supplier in relation to entering into a contract for flood restoration works at Grange Park Wetlands on behalf of the London Borough of Hillingdon.

    Published value
    £58kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    2 Nov 2026 → 1 Dec 2026 · 30 days
    Reference
    ocds-h6vhtk-06d336
How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.