Wales & Western CP7 Frameworks for Building and Civils Renewals Works
Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)·Consortium: 2 public authorities
What is being bought5 lots · detail below
Published requirement descriptionSupply of Building & Civils Renewals and minor enhancements portfolios for Control Period 7 (CP7).
- Nil-value commitment but permits Network Rail a total spend of TBC pounds sterling
over the duration of the framework in any permutation across all or any lots.
- Duration of 5 years with extension options 3 x 1 = 8 years total.
- Lot 1 – Western Structures (1 Supplier)
- Lot 2 – Wales Structures (1 Supplier)
- Lot 3 – Western Geotechnical Off-Track & Drainage (1 Supplier)
- Lot 4 – Wales Geotechnical Off-Track & Drainage (1 Supplier)
- Lot 5 – Stations & Buildings (1 Supplier)
The frameworks will cover the majority of the Buildings and Civils portfolios such as Structures, Geotechnical Off-track & Drainage and Stations & Buildings. The frameworks will run for 5 years with 3 optional one-year extensions.
CPV: Railway construction works
How this framework works
From the published notice- Places
- up to 1 suppliers · 6 bids on the busiest of 5 lots (6.0 per place) · 5 appointed (full)
Lots and requirements (5)Procurement structure
5 lots · all with a published value · win at most 2 of them · same evaluation weights on every lotEvery one of these 2 lots carries the same published figure, £450,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Wales & Western Control Period 7 Buildings and Civils Renewals FrameworkAwardedceiling above
Western Structures
Lot #2Wales & Western Control Period 7 Buildings and Civils Renewals FrameworkAwardedceiling above
Wales Structures
Lot #3Wales & Western Control Period 7 Buildings and Civils Renewals FrameworkAwardedPublished value£370,000,000
Western Geotech Off-Track and Drainage
Lot #4Wales & Western Control Period 7 Buildings and Civils Renewals FrameworkAwardedPublished value£300,000,000
Wales Geotechnical Off -Track & Drainage
Lot #5Wales & Western Control Period 7 Buildings and Civils Renewals FrameworkAwardedPublished value£430,000,000
Stations & Buildings
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (6)
- Methodology: 25%
- Behavioural & Collaboration: 20%
- Innovation: 10%
- Resource: 10%
- price: 30%
- Consents & Environment: 5%
Published award criteria (6)
- Methodology: 25
- Behavioural & Collaboration: 20
- Innovation: 10
- Consents & Environment: 5
- Resource: 10
- Price: 30
- Suitability
As set out in the procurement documents
- Legal form for consortia
- As set out in the procurement documents.
- Shortlisting
- As set out in the procurement documents.
- Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- “Wales & Western CP7 Frameworks for Building and Civils Renewals Works” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 31 Mar 2022, 21:17 BST
- Last source update
- 16 Feb 2023, 11:05 GMT
- Authority reference
Bravo Project - 32583- FTS notice number
2023/S 000-004733- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0328caFind a Tender- Contract terms summary
As set out in the procurement documents.
- Electronic trading
- e-invoicing allowed · electronic payment
- Performance terms
As set out in the procurement documents.
- Review procedure
Network Rail will observe a standstill period following the award of the contract and conduct itself in respect of any review procedure in accordance with the Utilities Contracts Regulations 2016.
How it was run
Official notice- Appointment period ends
- 20 Apr 2022, 17:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Deposits and guarantees
- Network Rail will require a Parent Company Guarantee.
Timeline
20 Apr 2022 → 16 Feb 2023 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown20 Apr 2022, 17:00 BST
- Invitations to tender expected13 Jun 2022, 00:00 BST
- Notice published16 Feb 2023, 11:05 GMT
Notice history
2 events · 2 releases on Find a Tender · since 16 Feb 2023- Status changed to complete16 Feb 2023, 11:05 GMT
- Buyer details updated16 Feb 2023, 11:05 GMT
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast5 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 5 of these contracts carry the same published figure, £1, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Western Structures
- Signed
- 6 Feb 2023
- Value
- ceiling above
- Status
- active
Wales Structures
- Signed
- 6 Feb 2023
- Value
- ceiling above
- Status
- active
Western Geotech Off Track & Drainage
- Signed
- 6 Feb 2023
- Value
- ceiling above
- Status
- active
Wales Geotech Off Track & Drainage
- Signed
- 6 Feb 2023
- Value
- ceiling above
- Status
- active
Stations & Buildings
- Signed
- 6 Feb 2023
- Value
- ceiling above
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Wales & Western Control Period 7 Buildings and Civils Renewals Framework | 6bids | — | — | — |
| 2 · Wales & Western Control Period 7 Buildings and Civils Renewals Framework | 4bids | — | — | — |
| 3 · Wales & Western Control Period 7 Buildings and Civils Renewals Framework | 6bids | — | — | — |
| 4 · Wales & Western Control Period 7 Buildings and Civils Renewals Framework | 4bids | — | — | — |
| 5 · Wales & Western Control Period 7 Buildings and Civils Renewals Framework | 6bids | — | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- High Court of England & WalesMediation bodyReview contact point
- The High Court of England & WalesReview body
Framework contractors & participating bidders
5 commercial parties on the notice- Amalgamated Construction LtdFramework contractor
- BAM Nuttall LtdFramework contractor
- Morgan Sindall Construction & Infrastructure LtdFramework contractor
- Octavius Infrastructure LtdFramework contractor
- Vinci Construction UK LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria