Find a TenderAwarded without competition
Published 8 Nov 2021, 11:59 GMT

Official UK procurement notice

Total Facilities Management 2022 Framework

Official notice

Authority: Guy's and St Thomas' NHS Foundation Trust (Central government)·Consortium: 3 public authorities

Framework agreementServicesAward procedure without prior publication of a call for competitionSME suitable
Framework ceiling (notional)£5,840,000,000framework ceiling, not attributable revenue
Awarded 16 May 2024no call for competition
Next notice expected 8 Nov 2021
Framework period 4 yrsends 7 Jul 2026 · starts 8 Jul 2022

Re-procurement plannedTotal Facilities Management Framework Agreement · tender expected

What is being bought

Published requirement description

Fully managed Hard FM contract.<br/>Planned and reactive maintenance to deliver services comprising: environmental building services engineering plant and equipment (heating, cooling, ventilation and controls etc.); specialist packaged contracts (lifts, fire alarms, medical gasses, access controls, high voltage systems etc.); building infrastructure; building fabric; grounds and gardens; all associated repairs; out of hours operational cover including a reactive maintenance call out service.

CPV: Building and facilities management services · Facilities management services

How this framework works

From the published notice
Bids received
25 bids received · 25 suppliers appointed
Framework period
4 yrs from 8 Jul 2022

The lotProcurement structure

single lot · no lot value published
Lot #1A framework for the Provision of Facilities Management servicesAwarded 4 yrs
Contract period: 8 Jul 2022 – 7 Jul 2026 (4 yrs)
Delivery: UK, London · SE1 4YB

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Services
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
8 Nov 2021, 11:59 GMT
Last source update
12 Dec 2025, 15:32 GMT
Authority reference
2022/S 000-018700
FTS notice number
2025/S 000-082605
Classification (CPV)
Building and facilities management servicesFacilities management services
Delivery area
UKLondon (UKI44)
Official registry OCID
ocds-h6vhtk-02f48c Find a Tender
Why no open competition
The procurement falls outside the scope of application of the directive
Published justification

Mini Competition call of Framework Agreement

Publisher note: NHS London Procurement Partnership are preparing to develop a new Framework Agreement for the provision of Facilities Management Service Solutions, to replace the soon to expire Total Facilities Management Framework Agreement (April 2022).The current framework agreement has the following LOT breakdown, Lot 1 – Total Facilities Management Lot 2 – Hard Facilities Management Lot 3 – Soft Facilities Management (with optional Waste Management & Linen & Laundry Services)Lot 4 Cleaning Services (inc window, pest control Grounds Maintenance)Lot 5 Catering ServicesLot 6 Security Services (including option for integration with Security System Maintenance) Lot 7 – Portering Services NHS LPP are looking for input from Facilities Management suppliers to inform their new Framework to ensure that it is fit for the next 4 years so it would be greatly appreciated if you could respond to the following questions: 1. What do you see as the key issues for supply chain resilience in labour, materials and transportation that LPP should address in specifications and documentation? 2. Do you have a roadmap to reach net-zero greenhouse gas emissions in Facilities Management? If so how do you see this impacting specifications and service3. What are the latest innovations in the Facilities Management that that you feel should be reflected in specifications for these services to add value for contracting authorities? 4. As you may be aware there is a requirement for NHS tenders to include Social Value as a selection criterion from April 22, can you provide details on your Social Value capabilities so that we can include this in the framework. For reference, aspects of social value in existing contracts may be referred to in relation to the National Social Value Measurement Framework Themes, Outcomes, and Measures (TOMs)5. What do you see as the continual case for outsourcing of FM functions in light of the above and post the Covid pandemic, 6. How do you believe that FM providers can promote localisation through engagement with SMEs and other aspects of the local community?7. (Optional) Do you consider Total FM services with one lead supplier a viable route for the NHS and briefly summarise the key benefits and/or drawbacks. Suppliers can add any additional comments that they may have on the proposed lot structure, for example or any other matter.NHSLPP may require further clarification so would like to reserve the right to set up individual meetings with suppliers to further clarify points made.Please note that there are currently plans to issue a competition under the new framework to which this PIN refers, for the delivery of Hard FM services for Imperial College Healthcare NHS Trust in April 2022. Any suppliers interested in bidding for that contract should engage with the procurement of this framework to ensure they have a chance to do so. Please respond by 14th December 2021 to [email protected] / [email protected]

How it was run

Official notice
Run through: portal not identified

Tender documents are also served through a separate tool: http://health.atamis.co.uk ↗

Appointment period ends
—

Timeline

8 Nov 2021 → 12 Dec 2025 · 3 dates
  1. Next notice expected
    8 Nov 2021
  2. Contract starts
    8 Jul 2022, 00:00 BST
  3. Notice published314 days ago
    12 Dec 2025, 15:32 GMT

Notice history

5 events · 22 releases on Find a Tender · since 8 Jul 2022
  1. Status changed to complete
    8 Jul 2022, 09:21 BST
  2. Procurement method changed
    8 Jul 2022, 09:21 BST
  3. Procurement method changed
    21 May 2024, 10:05 BST
  4. Buyer details updated
    21 May 2024, 10:05 BST
  5. Buyer details updated
    12 Dec 2025, 15:31 GMT
Published amendments (1 · 0 deadline changes)
WhenWhatBeforeAfterShift
—DateEstimated date of invitation · IV.2.3.18 Nov 202119 Apr 2022+162 d

1 amendment published without a description.

Routine re-releases (22)
  • 2025-12: 15 releases · 12 Dec 2025, 12 Dec 2025
  • 2024-05: 1 release · 21 May 2024
  • 2022-07: 1 release · 8 Jul 2022
  • 2021-11: 2 releases · 8 Nov 2021, 24 Nov 2021

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 25admitted to the panel · see the list ↓
Bids received 256 from SMEs
Contracts signed 20latest 16 May 2024

37 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 18 of these contracts carry the same published figure, £5,800,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Contract 015951-2024-1

    Signed
    16 May 2024
    Value
    £54,000,000
    Period
    … – 7 Jul 2026
    Status
    active
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Total Facilities Management Framework 2022 - NHS LPP

    Signed
    7 Jul 2022
    Value
    ceiling above
    Period
    8 Jul 2022 – 7 Jul 2027
    Status
    active
    • Change Framework duration extended., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The timeline in relation to both the Business Case governance and tendering process for the new iteration of the TFM framework has identified a risk that, if this process were to experience any delays, Contracting Authorities would potentially be left without a route to market for a period of time.<br/>In order to mitigate this risk, and to ensure adequate crossover so that Contracting Authorities, having commenced Pre Market Engagement, can continue to ITT publication and award prior to the current iteration of the Framework expiring, we are extending the current iteration of the Framework for a period of 12 months.<br/>NHS LPP will ensure that all Contracting Authorities are advised to undertake any new procurement processes under the new iteration of the Framework as soon as it is awarded and to only continue using the extended current iteration to complete processes that have already commenced.
  • Contract 018700-2022-1

    Signed
    5 Jul 2022
    Value
    —
    Period
    … – 7 Jul 2026
    Status
    active

Bid statistics published by the authority

BidsSMEVCSEValid bid range
25bids · 12 electronic · 12 from abroad6—£5,800,000,000 – £5,800,000,000

Contracting authority & participating public bodies

3 public bodies on the notice

Guy's and St Thomas' NHS Foundation Trust

Contracting authorityCentral Government Great Maze Pond, London, London, SE1 9RTContact name, email

Consortium members and other public bodies

Framework contractors & participating bidders

37 commercial parties on the notice
Show 27 more suppliers
  • COMPASS CONTRACT SERVICES (U.K.) LIMITEDFramework contractor02114954 Parklands Court, 24 Parklands, Birmingham Great Park, Birmingham, West Midlands, B45 9PZ
  • City and Kent Cleaning LimitedFramework contractor12011970 22 Metro Centre Kangley Bridge Road, London, London, SE26 5BWContact email
  • City and Kent Cleaning LtdFramework contractor Metro Business Centre, 22 Kangley Bridge Rd, London, UK, SE26 5BW
  • Compass Contract Services (UK) LimitedFramework contractor Compass House Guildford Street Chertsey, Surrey, UK, KT16 9BQ
  • Corrigenda LimitedFramework contractor03920337 1490 Parkway Solent Business Park Hampshire, Whiteley, South East, PO15 7AFContact email
  • Corrigenda LtdFramework contractor 3 Mitchell Cl, Fareham, UK, PO15 5SE
  • Equans EandS Solutions LimitedFramework contractor04243192 Becket House 1 Lambeth Palace Road London SE1 &EU, London, London, SE1 7EUContact email
  • FES FM LtdFramework contractor Unit 4, Richfield Place, 12 Richfield Ave, Reading, UK, RG1 8EQ
  • Fes FM LimitedFramework contractorSC220049 Forth House Pirnhall Business Park Stirling, London, Scotland, FK7 8HWContact email
  • G4S Facilities Management (UK) LimitedFramework contractor03333860 6th Floor, 50 Broadway,, London, London, SW1H 0DB
  • G4S Facilities Management (UK) LimitiedFramework contractor 46 Gillingham Street Pimlico, London, UK, SW1V 1HU
  • ISS MEDICLEAN LIMITEDFramework contractor01659837 Velocity 1 Brooklands Drive, Brooklands, Weybridge, London, KT13 0SLContact email
  • ISS Mediclean LtdFramework contractor Velocity V1, Weybridge, Addlestone, UK, KT13 0SL
  • MITIE FM LIMITEDFramework contractor03253304 Level 12, The Shard, 32 London Bridge Street, London, London, SE1 9SGContact email
  • Mitie FM LimitedFramework contractor The Shard, Level 12, 32 London Bridge Street, Southwark,, London,, UK, SE1 9SG
  • OCS Group UK LimitedFramework contractor03056469 New Century House, The Havens, Ipswich, Suffolk, Crawley, East of England, IP3 9SJContact email
  • OCS Group UK LimitedFramework contractor Ground Floor, Unit 5, The Enterprise Centre, Kelvin Lane, Manor Royal,, Crawley, UK, RH10 9PE
  • PARETO FACILITIES MANAGEMENT LIMITEDFramework contractor09070750 193 -197 High Holborn, Holborn Town Hall, London, London, WC1V 7BDContact email
  • Pareto FMFramework contractor Spendlove Centre, 5 Enstone Rd, Charlbury, Oxford, UK, OX7 3PQ
  • Pinnacle FM LimitedFramework contractor01040529 8th Floor, Holborn Tower,137-144 High Holborn, London, London, London, WC1V 6PL
  • Pinnacle FM LtdFramework contractor 8th Floor Holborn Tower 137-144 High Holborn, London, UK, WC1V 6PL
  • SEE Rail LtdFramework contractor South Eastern House, 62 - 70 Fowler Rd, Ilford, UK, IG6 3UT
  • SEE SERVICES LTDFramework contractor08854191 South Eastern House 62-70 Fowler Road, Hainault Business Park, Hainault, London, IG6 3UTContact email
  • SERCO LIMITEDFramework contractor00242246 SERCO HOUSE 16 BARTLEY WOOD BUSINESS PARK, BARTLEY WAY, Hook, South East, RG27 9UYContact email
  • SODEXO LIMITEDFramework contractor00842846 1 Southampton Row, London, London, WC1B 5HAContact email
  • Serco LtdFramework contractor 16 Bartley Wood Business Park Bartley Way Hook, Hampshire, UK, RG27 9UY
  • Sodexo LimitedFramework contractor 1 Southampton Row,, London, UK, WC1B 5HA

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.