Find a TenderAwarded
Published 7 Apr 2026, 12:18 BST

Official UK procurement notice

Total Cost Management System

Official notice

Authority: Great British Energy - Nuclear (Public body)

Goods
Sectors: Software Packages & ERP (48) Delivery: UK
Awarded value£492,775published contract · exc. VAT
Awarded 1 Aug 2025
Awarded to Contruent Ltd
Contract term 2 yrsends 31 Jul 2027 · starts 1 Aug 2025

What is being bought

Published requirement description

No description was published on the notice. See the official documents.

CPV: Software package and information systems

The lotProcurement structure

single lot · no lot value published
Lot #1Provision of a Total Cost Management System for Great British Energy – Nuclear,… 2 yrs

Provision of a Total Cost Management System for Great British Energy – Nuclear, procured via Lot 2 of the Crown Commercial Service G‑Cloud 14 Framework Agreement (RM1557).

Contract period: 1 Aug 2025 – 31 Jul 2027 (2 yrs)
Delivery: UK

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
7 Apr 2026, 12:18 BST
Last source update
7 Apr 2026, 12:18 BST
FTS notice number
2026/S 000-031402
Classification (CPV)
Software package and information systems
Delivery area
UK
Official registry OCID
ocds-h6vhtk-067cdd Find a Tender

Publisher note: The modification is made in accordance with Regulation 72(1)(b) and Regulation 72(1)(e) of the Public Contracts Regulations 2015. The modification does not alter the overall nature of the contract and remains proportionate to the original contract value. The modification is required due to higher than forecast user volumes and increased service requirements which exceeded the original contract allocation. Additional licences and implementation activities are required to ensure full system access and continuity of service. The modification does not change the original contract duration.

How it was run

Official notice
Submission deadline
—

Timeline

1 Aug 2025 → 7 Apr 2026 · 2 dates
  1. Contract starts
    1 Aug 2025, 00:00 BST
  2. Notice published196 days ago
    7 Apr 2026, 12:18 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £492,7751 contract exc. VAT
Contracts signed 1latest 1 Aug 2025
Awarded toValueDateStatus
Contruent LtdSME +1 morejoint award£492,775 †—Awarded

Contracts

  • Total Cost Management System · Contruent LtdSME +1 more

    Signed
    1 Aug 2025
    Value
    £492,775
    Period
    1 Aug 2025 – 31 Jul 2027
    Status
    active
    • Change The contract has been modified to reflect revised implementation scope, extended delivery timescales and updated licence volumes. The modification includes additional implementation activities and licences required to accommodate higher than forecast operational user demand and to ensure continuity of service., Need for additional works, services or supplies by the original contractor/concessionaire: The modification is required due to higher than forecast user volumes and increased service requirements which exceeded the original contract allocation. Additional licences and implementation activities are required to ensure full system access and continuity of service.

Contracting authority & participating public bodies

Great British Energy - Nuclear

Contracting authorityPublic body Department For Energy Security & Net Zero, 3-8 Whitehall Place, London, UKContact email

Bidders & participating suppliers

2 commercial parties on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.