Find a TenderAwardedContract details notice
Published 1 Sept 2025, 10:17 BST

Official UK procurement notice

THE SUPPLY OF ROUTE MARKINGS

Official notice

Authority: Ministry of Defence (Central government)

Framework agreementGoodsCompetitive flexible procedureAbove thresholdDefence & securitySME suitable
Framework ceiling (notional)£624,000framework ceiling, not attributable revenue
Submissions closed 30 Sept 2025awarded 2 Feb 2026
Awarded to Millstream (Penthouse Systems) Limited
Framework period 4 yrsends 16 Feb 2030 · starts 17 Feb 2026

What is being bought

Published requirement description

Babcock Land Defence Limited - acting as agent to the UK Ministry of Defence ("the Authority") - has awarded a 4-year Framework Agreement for IRM24/7682 THE SUPPLY OF ROUTE MARKINGS

CPV code applicable to this contract is:

34928470-Signage

This Framework Agreement includes 28 items identified as being in scope.

The contract value : £624K

All items within the scope of requirement are codified to NATO Stock Numbers (NSNs). Tenderers shall be provided with NATO Stock Numbers and shall be informed of any required applicable compliance standards.

All items must be supplied compliant to drawings which will be issued with the tender documentation, or compliant to the MPN on CSIS, if no drawings exist.

Babcock Land Defence Limited reserve the right to add further items of a similar nature to the contract post award.

The resulting Framework Agreement shall contain a set of Key Performance Indicators to measure performance in areas such as delivery and quality and shall include remedies for poor performance.

The Authority shall award the Framework Agreement in accordance with the evaluation criteria which will be detailed in the Invitation to Tender.

No business whatsoever is guaranteed under any resulting Framework Agreement indeed there is no guarantee that any Framework Agreement will be put in place in relation to this notice. No compensation etc. will be paid if a tender or resulting Framework Agreement is withdrawn for any reason. Bidders should take part in this process only on the basis that they fully understand and accept this position.

  • How the procedure runs: The Competitive Flexible Procedures in the Public Procurement Act 23 outline a structured approach to procurement, while allowing for flexibility to adapt to changing requirements. The detailed steps involved in the process: The Procurement Specific Questionnaire (PSQ) Assessment of Suppliers: The PSQ is assessed based on the selection criteria within the PSQ itself. Each question in the questionnaire is evaluated to determine if the supplier meets the required conditions of participation. Down Selection Process: The intention is to down select suppliers on a pass/fail basis. Only those suppliers who meet the necessary criteria will move forward to the next stage. Invitation to Tender (ITT) Shortlisted Suppliers: Once the PSQ stage is completed, the shortlisted suppliers who meet the criteria are invited to submit their full tender. Tender Documents: The full procurement documents, including requirements, specifications, and terms, are provided to the suppliers. Clarifications: Suppliers can ask questions or seek clarifications to ensure they fully understand the requirements and any flexibility involved in the process. Evaluation and Award Criteria Framework Agreement will be awarded to the bidder who submits the most advantageous tender. Evaluation will consider: Pricing and supply details for the items as specified in the tender. Responses to the Technical Questions: -Supply Chain Management - Contract Coverage - Controlling Price - Controlling Lead Times - Managing Availability - Delivery Excellence - Counterfeit Management - Obsolescence Babcock Land Defence Limited reserve the right to add further items of a similar nature to the Framework Agreement post award, following Request for Quotations (RFQ).

CPV: Signage

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Places
up to 1 suppliers · 2 bids received (2.0 per place) · 1 appointed (full)
Framework period
4 yrs from 17 Feb 2026
Published description of the framework

Offer pricing shall be Firm for the first year of the contact, with subseqent annual price adjustment effective from each contract anniversary, aligned to : 1 Year Firm price, fixed against PPI INDEX for Years 2-4

The lotProcurement structure

single lot · value published
Lot #1Awarded 4 yrsPublished value£624,000
Contract period: 17 Feb 2026 – 16 Feb 2030 (4 yrs)Value: £624,000 exc. VAT · £748,800 inc. VAT
Delivery: UK

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 40%Price: 60%
Published sub-criteria (2)
  • Technical: 40%
  • Commercial: 60%
Published award criteria (2)
  • Commercial
  • Technical
What this means for your bid
  • Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
  • “THE SUPPLY OF ROUTE MARKINGS” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Defence & security
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
1 Sept 2025, 10:17 BST
Last source update
24 Feb 2026, 11:52 GMT
Award evaluation window
Submission end – 17 Feb 2026
Authority reference
IRM24/7682
FTS notice number
2025/S 000-052695
Latest notice
Contract details notice (UK7)
Classification (CPV)
Signage
Delivery area
UK
Official registry OCID
ocds-h6vhtk-059107 Find a Tender
How it runs

The Competitive Flexible Procedures in the Public Procurement Act 23 outline a structured approach to procurement, while allowing for flexibility to adapt to changing requirements. The detailed steps involved in the process:

The Procurement Specific Questionnaire (PSQ)

Assessment of Suppliers: The PSQ is assessed based on the selection criteria within the PSQ itself. Each question in the questionnaire is evaluated to determine if the supplier meets the required conditions of participation.

Down Selection Process: The intention is to down select suppliers on a pass/fail basis. Only those suppliers who meet the necessary criteria will move forward to the next stage.

Invitation to Tender (ITT)

Shortlisted Suppliers: Once the PSQ stage is completed, the shortlisted suppliers who meet the criteria are invited to submit their full tender.

Tender Documents: The full procurement documents, including requirements, specifications, and terms, are provided to the suppliers.

Clarifications: Suppliers can ask questions or seek clarifications to ensure they fully understand the requirements and any flexibility involved in the process.

Evaluation and Award Criteria

Framework Agreement will be awarded to the bidder who submits the most advantageous tender. Evaluation will consider:

Pricing and supply details for the items as specified in the tender.

Responses to the Technical Questions:

-Supply Chain Management

  • Contract Coverage
  • Controlling Price
  • Controlling Lead Times
  • Managing Availability
  • Delivery Excellence
  • Counterfeit Management
  • Obsolescence

Babcock Land Defence Limited reserve the right to add further items of a similar nature to the

Framework Agreement post award, following Request for Quotations (RFQ).

How it was run

Official notice
Run through: Defence Sourcing Portal · Who buys & how to bid on MOD DSP
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · registration requires an NCAGE code — obtain in advance · before you can bid: NCAGE
Requests to participate (first stage)
30 Sept 2025, 16:00 BST
Appointment period ends
30 Sept 2025, 16:00 BST
Clarification deadline
15 Sept 2025, 16:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

contracts.mod.uk ↗

Tender must be submitted electronically via the Defence Sourcing Portal (DSP) by date and time. The Authority reserves the right to reject any Tender received after the stated date and time.

Hard copy, paper or delivered digital Tenders (e.g. email, DVD) at OFFICIAL SENSITIVE classification are no longer required and will not be accepted by the Authority.

Tenderers are required to submit an electronic online Tender in response to ITT IRM24/7682

Timeline

1 Sept 2025 → 24 Feb 2026 · 8 dates
  1. Tender notice published
    1 Sept 2025, 10:17 BST
  2. Clarification questions by400 days ago
    15 Sept 2025, 16:00 BST
  3. Admission / appointment period ends385 days ago · period end, not a bid countdown
    30 Sept 2025, 16:00 BST
  4. Assessment summaries sent261 days ago
    2 Feb 2026
  5. Standstill ends251 days ago
    11 Feb 2026, 23:59 GMT
  6. Contract starts246 days ago
    17 Feb 2026
  7. Award decision expected by245 days ago
    17 Feb 2026, 23:59 GMT
  8. Latest notice published238 days ago
    24 Feb 2026, 11:52 GMT

Notice history

5 events · 3 releases on Find a Tender · since 1 Sept 2025
  1. Tender notice published
    1 Sept 2025, 10:17 BST
    UK4
  2. Contract award notice published
    2 Feb 2026, 13:33 GMT
    UK6
  3. Status changed to complete
    2 Feb 2026, 13:33 GMT
  4. Contract signature expected
    17 Feb 2026, 23:59 GMT
    scheduled
  5. Contract details notice published
    24 Feb 2026, 11:52 GMT
    UK7

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 11 award · see the list ↓
Bids received 22 from SMEs
Contracts signed 1latest 17 Feb 2026
Awarded toValueDateStatus
Millstream (Penthouse Systems) LimitedSME17 Feb 2026 – 16 Feb 2030£624,0002 Feb 2026Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
2final-stage tenders20—

Contracting authority & participating public bodies

Ministry of Defence

Contracting authorityPublic authority - central government GB-PPON: PHVX-4316-ZVGZ Building B15, MoD Donnigton, Telford, West Midlands, TF2 8JTContact name, email

Framework contractors & participating bidders

1 commercial party on the notice

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender