TDEP Phase 2 Quayside Development
Authority: PORT OF TYNE PUBLIC LIMITED COMPANY
What is being bought
Published requirement descriptionThis project is to extend the already completed Phase 1 section of the quay which is currently been used by the Equinor SOV. The TDEP site is currently the operational and maintenance base for the windfarm with a permanent facility employing up to 150 people.
The existing quayside consists of an existing dilapidated jetty and a concrete suspended quay which extends from a quay top level of approximately +6.60m CD (+4.00m OD) down to the riverbed at a depth of about -6m to -7m CD, so a retained height of between 12 to 13.5m. The riverbed in this area consists of soft alluvium and silt overlying alternating layers of strong sandstone, mudstone and siltstone bedrock of the carboniferous coal series which is relatively shallow (-10.00m CD). The existing quay structures along the section are old and is approaching the end of its serviceable life due to sub-aerial corrosion, marine corrosion and accelerated low water corrosion of the steel sheet piles.
The proposed wall in this contract continues from the end of Phase 1 section along the remainder of the quay up to near the former graving dock entrance, a distance of 90m. The Phase 1 works is the initial 122m length from the existing wall at the South end of the site. To ensure a straight berthing line for shipping, the 2.6m offset distance will be retained although this does reduce in places due to the variation in the alignment of the existing wall. It is envisaged that the new quay wall will be of a similar construction to that installed in the Phase 1 section, consisting of a steel combi-wall tied back at the top with anchor rods to an anchorage system located in the ground approximately 25m to the rear. A reinforced concrete cope will connect the tops of the piles together to form a continuous hard edge to the quay front. A shorter length of anchor ties will be utilised where the wall will be installed adjacent to existing suspended deck structure.
The current dredge depth varies from -6m to -7m CD. The quay is to be designed for a future dredge depth of -10m CD. Due to the high level of the sandstone bedrock, spigots will be required, or the piles will have to be cored through the sandstone to achieve the necessary toe depth to ensure stability when the berth is dredged to the -10m CD depth in the future and to prevent undermining from scour.
The quay will be fitted out as part of the works with new bollards, fenders, ladders, grab chains and hand railing as shown on the drawings. Provision will also be made for quay side services (installed by others) and drainage. New concrete surfacing and topping will be installed to the rear to facilitate drainage, some of this will be new ground slabs which will be piled to reduce the loading on the new quay wall from the proposed applied ground surcharge loading of 10tonnes/m2.
The existing ground contains a number of relic structures from the previous use of the site including disused jetty, building foundations, bollard foundations, dock closure walls. There is also a suspended slab which is a piled structure located towards the end of the works. The supplementary information provided with the tender documents contains archive drawings of the Phase one works and other historical records relating to the quay side. The tenderer is to consider this information when designing and positioning the new quay, anchorage system and all piles to make due allowance for these old structures.
The Equinor SOV currently using the TDEP Phase 1 berth will be visiting the site twice a week and be in berth for 12 to 24 hours. Contractor shall take this into consideration in pricing the job.
CPV: Construction work
The lotProcurement structure
single lot · value publishedLot #1ICC Design & Construct form of tenderPublished value£8,500,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Experience in quay construction in tidal water: 50%
- Adherence to performance specification: 50%
Published award criteria (2)
- Experience in quay construction in tidal water: 50
- Adherence to performance specification: 50
- Suitability
Demonstration in ability and experience to undertake quayside construction, including piling works over tidal water. Demonstration in ability to design and construct these works.
Demonstration to sufficient financial stability to undertake the works throughout the contract period.
Demonstration of sufficient insurances.
Providing evidence of meeting high standards of Health and Safety and Environmental requirements.
- Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Works
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 28 Sept 2023, 16:45 BST
- Last source update
- 28 Sept 2023, 16:45 BST
- FTS notice number
2023/S 000-028689- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-040663Find a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Performance terms
Infrastructure Conditions of Contract; Design and Construct Version (ICC - August 2011)
How it was run
Official notice- Submission deadline
- 20 Oct 2023, 12:00 BST
- Submission channel
- {"written"}
- Accepted languages
- en
- Participation fee
- document
Mr Kevin Emmett, Merchant House, South Shields, NE34 9PY, United Kingdom. NUTS code: UKC. [email protected], www.portoftyne.co.uk ↗
Timeline
28 Sept 2023 → 1 Apr 2024 · 3 dates- Notice published28 Sept 2023, 16:45 BST
- Submission deadline20 Oct 2023, 12:00 BST
- Contract starts1 Apr 2024, 00:00 BST
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Port of Tyne AuthorityReview body
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria