Find a TenderAwarded
Published 27 Mar 2024, 13:17 GMT

Official UK procurement notice

TC840 - Supply and Installation of Electrical Equipment and Adaptations

Official notice

Authority: Manchester City Council (Local council)

Framework agreement3 lotsGoodsOpen procedureSME suitable
Framework ceiling (notional)£36,000,000total for 3 lots · framework ceiling, not attributable revenue
Submissions closed 29 Apr 2024awarded 23 Apr 2025
Lots 3see the lot list below

What is being bought3 lots · detail below

Published requirement description

Manchester City Council (the Council) is inviting tenders for the supply and installation of

electrical equipment and adaptations which will be subject to the information, specification

and tender package enclosed. The framework is split into 3 Lots as follows:

Lot 1 – Lifting Equipment & Stair Lifts

Lot 2 – Through Floor Lifts & Step Lifts

Lot 3 – Track & Ceiling Hoists

CPV: Industrial machinery

How this framework works

From the published notice
Bids received
8 bids on the busiest of 3 lots · 10 suppliers appointed

Lots and requirements (3)Procurement structure

3 lots · all with a published value · evaluation weights differ by lot

Every one of these 3 lots carries the same published figure, £36,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Lifting Equipment & Stair LiftsAwardedRenewalceiling above

Further details are set out in the procurement documents.

Delivery: North West
Extensions: Extension available for 24 months.Variant bids: not allowed
Lot #2Through Floor Lifts & Step LiftsAwardedRenewalceiling above

Further details are set out in the procurement documents.

Delivery: North West
Extensions: Extension available for 24 months.Variant bids: not allowed
Lot #3Track & Ceiling HoistsAwardedRenewalceiling above

Further details are set out in the procurement documents.

Delivery: North West
Extensions: Extension available for 24 months.Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored

Lots publish different evaluation splits; there is no single procedure weighting.

LotQualityPriceSocial valueEnvironmentalSplit
1 · Lifting Equipment & Stair Lifts20%40%30%10%
2 · Through Floor Lifts & Step Lifts20%40%30%10%
3 · Track & Ceiling Hoists20%40%30%10%
What this means for your bid
  • Price carries 40 points on every lot: a 10% discount moves about 4 points.
  • “TC840 - Supply and Installation of Electrical Equipment and Adaptations” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
27 Mar 2024, 13:17 GMT
Last source update
7 May 2025, 10:34 BST
Award evaluation window
29 Apr 2024 – …
Authority reference
DN717280
FTS notice number
2025/S 000-019295
Classification (CPV)
Industrial machinery
Delivery area
North West (UKD3)
Official registry OCID
ocds-h6vhtk-044da0 Find a Tender
Review and risk notes
Review procedure

Tick the box and add the following text:

The Council incorporated a minimum 10 calendar day standstill period at the point information on the award of the contract/framework is communicated to tenderers prior to entering into the contract/framework. If an appeal regarding the award of a contract/framework has not been successfully resolved, the Public Contract Regulations 2015 provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland).

Publisher note: The Council is using the e-business portal known as the Chest. Applicants will need to register their details at the following link www.the-chest.org.uk . Once registered, applicants will be emailed a log-in and password which will allow them to gain access to the documentation relating to this opportunity. Applicants will need to electronically submit their completed tender documents, including online questionnaire, via the on-line portal by 11am on 29th April 2024 as referred to in IV.2.2. Any clarification queries must also be submitted via the Chest website by the date referred to in the tender documentation. The contracts will be for 2 years, expected to commence 1st November 2024 with option to extend for up to an additional 2 year(s). The successful supplier will be required to actively participate in the economic and social regeneration of the locality of, and surroundings of, the place of delivery of the contract. Therefore, selection and award criteria, specification requirements and contract performance conditions may relate in particular to social and environmental considerations as relevant to the subject matter of this project. The Council reserves the right not to award the framework, as a result of this Contract Notice. The Council shall not be liable for any costs or expenses incurred by any organisation in responding to this notice or in tendering for the proposed framework. All submissions must be in English, with any clarifications or discussions conducted in English. Tenders and supporting documents must be priced in pounds sterling and all payments under the proposed contract will be made in pounds sterling.

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
29 Apr 2024, 11:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bids opened
29 Apr 2024, 11:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

29 Apr 2024 → 7 May 2025 · 3 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    29 Apr 2024, 11:00 BST
  2. Bids opened
    29 Apr 2024, 11:00 BST
  3. Notice published
    7 May 2025, 10:34 BST

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    7 May 2025, 10:34 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 10admitted to the panel · see the list ↓
Bids received 84 from SMEs · busiest of 3 lots
Contracts signed 11latest 23 Apr 2025

11 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 5 of these contracts carry the same published figure, £3,888,680, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Lifting Equipment & Stair Lifts

    Signed
    23 Apr 2025
    Value
    ceiling above
    Status
    active
  • Lot 3 – Track & Ceiling Hoists

    Signed
    23 Apr 2025
    Value
    £594,000
    Status
    active
  • Lot 3 – Track & Ceiling Hoists

    Signed
    23 Apr 2025
    Value
    £594,000
    Status
    active
  • Lifting Equipment & Stair Lifts

    Signed
    23 Apr 2025
    Value
    ceiling above
    Status
    active
  • Lifting Equipment & Stair Lifts

    Signed
    23 Apr 2025
    Value
    ceiling above
    Status
    active
  • Lifting Equipment & Stair Lifts

    Signed
    23 Apr 2025
    Value
    ceiling above
    Status
    active
  • Lifting Equipment & Stair Lifts

    Signed
    23 Apr 2025
    Value
    ceiling above
    Status
    active
  • Lot 2 – Through Floor Lifts & Step Lifts

    Signed
    23 Apr 2025
    Value
    £2,408,160
    Status
    active
  • Lot 2 – Through Floor Lifts & Step Lifts

    Signed
    23 Apr 2025
    Value
    £2,408,160
    Status
    active
  • Lot 3 – Track & Ceiling Hoists

    Signed
    23 Apr 2025
    Value
    £594,000
    Status
    active
  • Lot 3 – Track & Ceiling Hoists

    Signed
    23 Apr 2025
    Value
    £594,000
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Lifting Equipment & Stair Lifts8bids · 8 electronic · 8 from abroad4——
2 · Through Floor Lifts & Step Lifts3bids · 3 electronic · 3 from abroad3——
3 · Track & Ceiling Hoists5bids · 5 electronic · 5 from abroad3——

Contracting authority & participating public bodies

Manchester City Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Floor 5 (Mount Street Elevation),, Town Hall Extension, Albert Square, Manchester, North West, M60 2LAContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • The High Court (England, Wales and Northern Ireland)Review body London

Framework contractors & participating bidders

10 commercial parties on the notice

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria