Published requirement description- This UK6 Contract Award Notice replaces the previously published UK6 Contract Award Notice (Notice Identifier: 2026/S 000-063302).
The replacement notice is required due the withdrawal of a supplier's tenders for Lot 6 and Lot 7 following the publication of the original notice.
The purpose of this notice is to ensure that the published contract award information accurately reflects the revised outcome of the procurement process for the Framework.*
This tender notice is for the award of a Framework (a public contract) following a competitive tendering procedure by means of an open procedure in accordance with section 20(1) and (2)(a) of the Procurement Act 2023.
The Road Asset Management (RAM) Surface Dressing Framework will include the following work activities:
- Application of surface dressing.
- Associated road markings.
- Delivery of temporary traffic management as part of associated civils works on live trafficked public roads.
- Other associated ancillary works.
The Framework comprises seven Lots.
This notice sets out the eligible suppliers being appointed to the Framework.
A Surface Dressing Measured Term Contract (MTC) will be awarded from each Lot to deliver surface dressing schemes each valued up to £750,000(excluding VAT).
Each Lot corresponds to a specific geographical area:
Lot 1 - SDF S2 - Newry, Mourne & Down / Ards & North Down;
Lot 2 - SDF W2 - Derry & Strabane / Fermanagh & Omagh;
Lot 3 - SDF S1 - Armagh, Banbridge & Craigavon;
Lot 4 - SDF W1 - Mid Ulster;
Lot 5 - SDF N1 - Causeway Coast & Glens;
Lot 6 - SDF N2 - Mid & East Antrim / Antrim & Newtownabbey;
Lot 7 - SDF E1 - Belfast / Lisburn & Castlereagh
The overall cumulative value of the Framework is £80m (ex VAT) over the four-year Framework Term.
If the Contracting Authority is unable, for any reason, to award a new Surface Dressing Framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any MTC Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months.
This may increase the overall cumulative value of this Framework to £100m (ex VAT).
Framework Lot values may be shared with other Lots
- The authority expects to re-tender this requirement around 1 Nov 2029, 23:59 GMT.
CPV: Engineering works and construction works · Surface work for roads · Various surface works
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- every call-off is a further competition among the appointed suppliers
- Bids received
- 5 bids on the busiest of 7 lots · 5 suppliers appointed
- Framework period
4 yrs from 1 Apr 2026, The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract.
- Supplier levy on call-offs (max %)
- 1% of call-off value · No fees apply.
Published description of the framework
Seven Measured Term Contracts (MTCs) covering seven Contract Areas (Lots 1-7) will be awarded upon execution of the Framework.
A Primary Supplier and Reserve Supplier will be appointed for each MTC Lot, as a result of the evaluation of the Framework tender submissions.
The Primary Supplier will be required to carry out any such Works instructed by a Works Order issued under the provisions of the MTC Call-Off Contract.
The Call-Off Procedure for MTCs is set out in 'Volume 2 – Framework Information' of the Framework contract documents.
Lots and requirements (7)Procurement structure
7 lots · all with a published value · win at most 3 of them · same conditions of participation on every lot · same evaluation weights on every lotEvery one of these 2 lots carries the same published figure, £15,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1SDF S2 (Newry, Mourne & Down / North Down & Ards)AwardedPublished value£22,500,000
The source published no individual description for this lot.
- Economic & financial standing
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Technical & professional ability
As per Tender Stage documentation - Refer to IFT & TSP documentation.
Lot #2SDF W2 (Derry & Strabane / Fermanagh & Omagh)AwardedPublished value£21,250,000
The source published no individual description for this lot.
- Economic & financial standing
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Technical & professional ability
As per Tender Stage documentation - Refer to IFT & TSP documentation.
Lot #3SDF S1 (Armagh, Banbridge & Craigavon)Awardedceiling above
The source published no individual description for this lot.
- Economic & financial standing
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Technical & professional ability
As per Tender Stage documentation - Refer to IFT & TSP documentation.
Lot #4SDF W1 (Mid Ulster N & S)Awardedceiling above
The source published no individual description for this lot.
- Economic & financial standing
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Technical & professional ability
As per Tender Stage documentation - Refer to IFT & TSP documentation.
Lot #5SDF N1 (Causeway Coast & Glens E & W)AwardedPublished value£11,250,000
The source published no individual description for this lot.
- Economic & financial standing
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Technical & professional ability
As per Tender Stage documentation - Refer to IFT & TSP documentation.
Lot #6SDF N2 (Mid & East Antrim / Antrim & Newtownabbey)AwardedPublished value£10,000,000
The source published no individual description for this lot.
- Economic & financial standing
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Technical & professional ability
As per Tender Stage documentation - Refer to IFT & TSP documentation.
Lot #7SDF E1 (Belfast N / Belfast S / Lisburn & Castlereagh)AwardedPublished value£5,000,000
The source published no individual description for this lot.
- Economic & financial standing
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Technical & professional ability
As per Tender Stage documentation - Refer to IFT & TSP documentation.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (3)
- Price
- Quality
- Social Value
- Economic & financial standing
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Technical & professional ability
As per Tender Stage documentation - Refer to IFT & TSP documentation.
- Price carries 70 of 100 points: a 10% discount moves about 7 points. This one is won on the number: sharpen the price before polishing the prose.
- “Surface Dressing Framework” is a framework: the contest is a place on its panel, not a single contract: each call-off is a further competition, so the pricing contest starts after appointment.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes · next expected 1 Nov 2029
- First published
- 7 Oct 2025, 14:19 BST
- Last source update
- 3 Sept 2026, 11:49 BST
- Award evaluation window
- Submission end – 3 Mar 2026
- Authority reference
T-1146- FTS notice number
2025/S 000-071538- Latest notice
- Contract award notice (UK6)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-05a99bFind a Tender- Contract terms summary
For further details on invoicing procedures please see : www.finance-ni.gov.uk/articles/account-ni-… ↗
- Risks
Procurement Act 2023 Section 74(1)(a) and schedule 8 para 5 (1) A Materialisation of a known risk
The Authority has identified the following risks as risks that satisfy the criteria of Schedule 8 sub-paragraph (6)(a) of the Procurement Act 2023 i.e. that the risk/s could jeopardise the satisfactory performance of the contract but, because of their nature, cannot be addressed in the contract as awarded:
- (a) Extreme Adverse Weather Impacts and Climate Change: Extreme weather events (In particular, extreme high or low temperatures, high winds, tidal surges and heavy rainfall) may impact service delivery. Increased extreme weather events and storm frequency may require future adaptation of the works carried out under this Framework. Such events may result in significant localised impacts within geographical location, e.g. specific Contract Areas, requiring changes to the scale or emphasis of contracted works.
(b) Regulatory and Policy Change: The Authority is engaged in developing policy in relation to Net Zero. The introduction of this policy and any potential new obligations in relation to environmental regulations may require adjustments to the scope of works provided under this Framework. The Framework and Call-Offs may be required to align with the Authority’s future net zero and sustainability strategies. Changes to national or local carbon reduction targets may require modifications to materials, methods, or delivery schedules.
(c) Changes to DfI internal Policy. The Authority is engaged in developing a strategy for a new approach to how the public road network is maintained. This strategy seeks to deliver a structured approach to road maintenance through high-quality interventions that are focused, targeted and based on reliable and timely analytics. The scope of services may be affected by anticipated reforms introduced by the strategy. There is also a known risk that priorities may shift, requiring changes to the scope or emphasis of contracted works.
AND
- Has concluded that there is a possibility that the contract may have to be modified as a result of a materialisation of the known risk/s at a later date in accordance with Schedule 8 paragraph 5 of the Procurement Act 2023.
How it was run
Official notice- Appointment period ends
- 13 Jan 2026, 15:00 GMT
- Clarification deadline
- 13 Jan 2026, 14:59 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
- Supplier levy on call-offs (max %)
- call-off levy · 1% of call-off value · No fees apply.
Tenders must be submitted electronically via the relevant Call for Tender (CfT) opportunity on eTendersNI, website details immediately below.
Paper submissions will not be accepted or considered and will be rejected by the Authority.
The tender documents are available with unrestricted and full direct access, free of charge, at: URL etendersni.gov.uk/epps ↗
For this procurement, all Supplier Technical and Financial submissions must be uploaded exclusively via Lot 1 (SDF S2) on the eTendersNI platform.
Lot 1 will serve as the single, centralised submission point for all Lots within the Framework. Accordingly, Suppliers must select Lot 1 on eTendersNI (in addition to all other Lots they are tendering for) regardless of whether they are submitting a tender for Lot 1 itself.
Timeline
7 Oct 2025 → 14 Sept 2026 · 9 dates- Planning notice published380 days ago7 Oct 2025, 14:19 BST
- Tender notice published350 days ago6 Nov 2025, 11:00 GMT
- Clarification questions by282 days ago13 Jan 2026, 14:59 GMT
- Admission / appointment period ends282 days ago · period end, not a bid countdown13 Jan 2026, 15:00 GMT
- Award decision expected by233 days ago3 Mar 2026, 23:59 GMT
- Contract starts205 days ago1 Apr 2026, 00:00 BST
- Assessment summaries sent51 days ago2 Sept 2026, 00:00 BST
- Latest notice published49 days ago3 Sept 2026, 11:49 BST
- Standstill ends38 days ago14 Sept 2026, 23:59 BST
Notice history
15 events · 6 releases on Find a Tender · since 7 Oct 2025- Preliminary market engagement notice published7 Oct 2025, 14:19 BSTUK2
- Tender notice published6 Nov 2025, 11:00 GMTUK4
- Published value published: £100,000,0006 Nov 2025, 11:00 GMT
- Status changed to active6 Nov 2025, 11:00 GMT
- Procurement method changed6 Nov 2025, 11:00 GMT
- Deadline published: 10 Dec 2025, 23:59 GMT6 Nov 2025, 11:00 GMT
- Tender notice published18 Nov 2025, 16:13 GMTUK4
- Deadline moved to 13 Jan 2026, 23:59 GMT18 Nov 2025, 16:13 GMT+34 days · was 10 Dec 2025, 23:59 GMT
- Tender notice published18 Nov 2025, 16:30 GMTUK4
- Deadline moved to 13 Jan 2026, 15:00 GMT18 Nov 2025, 16:30 GMT+0 days · was 13 Jan 2026, 23:59 GMT
- Contract award notice published6 Jul 2026, 15:56 BSTUK6
- Status changed to complete6 Jul 2026, 15:56 BST
- Contract signature expected19 Aug 2026, 23:59 BSTscheduled
- Contract award notice published3 Sept 2026, 11:49 BSTUK6
- Contract signature expected16 Oct 2026, 23:59 BSTscheduled
Published amendments (2)
The Department has extended the tender submission period, all tenders must now be received by 15:00 on 13 January 2026.
The Department has extended the tender submission period, all tenders must now be received by 15:00 on 13 January 2026.
Routine re-releases (6)
- 2025-11: 2 releases · 6 Nov 2025, 18 Nov 2025
- 2025-10: 1 release · 7 Oct 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast£15,000,000 is the framework's published maximum, restated by the publisher on 4 award rows. It is one ceiling, not 4 separate sums, and no share per lot is published; those rows read “ceiling above”.
| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · SDF S2 (Newry, Mourne & Down / North Down & Ards)2 awards | |||
| FP McCann Ltd, I.C.B. Emulsions Ltd t/a Colas NISME, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMET-11461 Sept 2027 – 31 Aug 2031 · up to 31 Aug 2032Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. If DfI is unable, for any reason, to award a new framework or to put in place an alternative regime to replace the Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of 12 additional months. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £22,500,000 | 1 Sept 2026standstill to 14 Sept 2026 | Standstill |
| FP McCann Ltd, I.C.B. Emulsions Ltd t/a Colas NISME, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMEFramework Lot 1 - SDF S2 - Newry, Mourne and Down / Ards and North Down26 Aug 2026 – 25 Aug 2030 · up to 18 Jan 2031Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £22,500,000 | 2 Jul 2026standstill to 22 Jul 2026 | Standstill |
| Lot 2 · SDF W2 (Derry & Strabane / Fermanagh & Omagh)2 awards | |||
| FP McCann Ltd, I.C.B. Emulsions Ltd t/a Colas NISME, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMET-11461 Sept 2027 – 31 Aug 2031 · up to 31 Aug 2032Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. If DfI is unable, for any reason, to award a new framework or to put in place an alternative regime to replace the Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of 12 additional months. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £21,250,000 | 1 Sept 2026standstill to 14 Sept 2026 | Standstill |
| FP McCann Ltd, I.C.B. Emulsions Ltd t/a Colas NISME, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMEFramework Lot 2 - SDF W2 - Derry and Strabane / Fermanagh and Omagh26 Aug 2026 – 25 Aug 2030 · up to 18 Jan 2031Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £21,250,000 | 2 Jul 2026standstill to 22 Jul 2026 | Standstill |
| Lot 3 · SDF S1 (Armagh, Banbridge & Craigavon)2 awards | |||
| FP McCann Ltd, I.C.B. Emulsions Ltd t/a Colas NISME, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMET-11461 Sept 2027 – 31 Aug 2031 · up to 31 Aug 2032Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. If DfI is unable, for any reason, to award a new framework or to put in place an alternative regime to replace the Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of 12 additional months. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | ceiling above | 1 Sept 2026standstill to 14 Sept 2026 | Standstill |
| FP McCann Ltd, I.C.B. Emulsions Ltd t/a Colas NISME, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMEFramework Lot 3 - SDF S1 - Armagh, Banbridge and Craigavon26 Aug 2026 – 25 Aug 2030 · up to 18 Jan 2031Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | ceiling above | 2 Jul 2026standstill to 22 Jul 2026 | Standstill |
| Lot 4 · SDF W1 (Mid Ulster N & S)2 awards | |||
| FP McCann Ltd, I.C.B. Emulsions Ltd t/a Colas NISME, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMET-11461 Sept 2027 – 31 Aug 2031 · up to 31 Aug 2032Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. If DfI is unable, for any reason, to award a new framework or to put in place an alternative regime to replace the Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of 12 additional months. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | ceiling above | 1 Sept 2026standstill to 14 Sept 2026 | Standstill |
| FP McCann Ltd, I.C.B. Emulsions Ltd t/a Colas NISME, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMEFramework Lot 4 - SDF W1 - Mid Ulster26 Aug 2026 – 25 Aug 2030 · up to 18 Jan 2031Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | ceiling above | 2 Jul 2026standstill to 22 Jul 2026 | Standstill |
| Lot 5 · SDF N1 (Causeway Coast & Glens E & W)2 awards | |||
| FP McCann Ltd, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMET-11461 Sept 2027 – 31 Aug 2031 · up to 31 Aug 2032Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. If DfI is unable, for any reason, to award a new framework or to put in place an alternative regime to replace the Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of 12 additional months. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots | £11,250,000 | 1 Sept 2026standstill to 14 Sept 2026 | Standstill |
| FP McCann Ltd, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMEFramework Lot 5 - SDF N1 - Causeway Coast and Glens26 Aug 2026 – 25 Aug 2030 · up to 18 Jan 2031Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £11,250,000 | 2 Jul 2026standstill to 22 Jul 2026 | Standstill |
| Lot 6 · SDF N2 (Mid & East Antrim / Antrim & Newtownabbey)2 awards | |||
| FP McCann Ltd, John McQuillan Contracts LtdSME, KIELY BROS LTDT-11461 Sept 2027 – 31 Aug 2031 · up to 31 Aug 2032Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. If DfI is unable, for any reason, to award a new framework or to put in place an alternative regime to replace the Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of 12 additional months. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £10,000,000 | 1 Sept 2026standstill to 14 Sept 2026 | Standstill |
| FP McCann Ltd, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMEFramework Lot 6 - SDF N2 - Mid & East Antrim / Antrim & Newtownabbey26 Aug 2026 – 25 Aug 2030 · up to 18 Jan 2031Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £10,000,000 | 2 Jul 2026standstill to 22 Jul 2026 | Standstill |
| Lot 7 · SDF E1 (Belfast N / Belfast S / Lisburn & Castlereagh)2 awards | |||
| FP McCann Ltd, John McQuillan Contracts LtdSME, KIELY BROS LTDT-11461 Sept 2027 – 31 Aug 2031 · up to 31 Aug 2032Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. If DfI is unable, for any reason, to award a new framework or to put in place an alternative regime to replace the Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended beyond the stated maximum contract term for a further period or periods up to a maximum of 12 additional months. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £5,000,000 | 1 Sept 2026standstill to 14 Sept 2026 | Standstill |
| FP McCann Ltd, John McQuillan Contracts LtdSME, KIELY BROS LTD, Patrick Keenan QuarriesSMEFramework Lot 7 - SDF E1 - Belfast / Lisburn and Castlereagh26 Aug 2026 – 25 Aug 2030 · up to 18 Jan 2031Extensions: The Framework contract may be extended in accordance with Section 74 of the Procurement Act 2023 Modifying a public contract. · Options: The right to additional purchases while the contract is valid. Framework Lot values may be shared with other Lots. | £5,000,000 | 2 Jul 2026standstill to 22 Jul 2026 | Standstill |
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · SDF S2 (Newry, Mourne & Down / North Down & Ards) | 5final-stage tenders | 3 | 0 | — |
| 2 · SDF W2 (Derry & Strabane / Fermanagh & Omagh) | 5final-stage tenders | 3 | 0 | — |
| 3 · SDF S1 (Armagh, Banbridge & Craigavon) | 5final-stage tenders | 3 | 0 | — |
| 4 · SDF W1 (Mid Ulster N & S) | 5final-stage tenders | 3 | 0 | — |
| 5 · SDF N1 (Causeway Coast & Glens E & W) | 4final-stage tenders | 2 | 0 | — |
| 6 · SDF N2 (Mid & East Antrim / Antrim & Newtownabbey) | 3final-stage tenders | 1 | 0 | — |
| 7 · SDF E1 (Belfast N / Belfast S / Lisburn & Castlereagh) | 3final-stage tenders | 1 | 0 | — |
Who bid
- wonFP MCCANN LIMITED · Northern Ireland · all lots
- wonI.C.B. EMULSIONS LIMITEDSME · Northern Ireland · 1, 2, 3, 4
- wonJOHN MCQUILLAN (CONTRACTS) LIMITEDSME · Northern Ireland · all lots
- wonKIELY BROS. LIMITED · West Midlands · all lots
- wonPatrick Keenan QuarriesSME · Northern Ireland · 1, 2, 3, 4, 5
Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.
Contracting authority & participating public bodies
Framework contractors & participating bidders
5 commercial parties on the notice- FP MCCANN LIMITEDFramework contractor
- I.C.B. EMULSIONS LIMITEDFramework contractor
- JOHN MCQUILLAN (CONTRACTS) LIMITEDFramework contractor
- KIELY BROS. LIMITEDFramework contractor
- Patrick Keenan QuarriesFramework contractor
Official documents & specifications (18)
Official links; attachments are not copiedNotices published for this procedure
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
Show 10 more notices
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender