← Back to search results

AwardedFind a Tender · award

SPT - Strategic Agreement for Transmission Overhead Line Works

Buyer: SP TRANSMISSION PLC →

BuyerSP TRANSMISSION PLC
StatusAwarded
DeadlineNot published
ValueValue not published
Published22 Aug 2025

What is being bought

SPT has appointed partners with the capacity and capability to deliver its strategic infrastructure priorities through a strategic collaborative delivery model. The agreement comprises three (3) Lots: - • Lot 1 is for 400kV Overhead Line Works involving a HTLS (High Temperature Low Sag) conductor system • Lot 2 is for 275kV and 400kV Overhead Line Works • Lot 3 is for 132kV Overhead Line Works The partners appointed to the agreement may be allocated projects and they will provide engineering and design, procure any materials and equipment, and carry out the construction works as per the agreed design with SPT. The contractual arrangements comprise a main Framework Agreement regulating the rights and obligations of SPT and the partners, with call-off contracts for individual packages using the NEC4 family of contracts. There is no guarantee, express or implied, that the appointed partners under the Framework Agreement will receive any, or a particular volume or value of work.

Delivery location

UKM · UKM · UKM

Categories

Construction work for electricity power lines 45231400Construction work for electricity power lines 45231400

Lot details

Design & Construction of 400kV Overhead Lines with HTLS

Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).

Statuscancelled

Award criteria
Non-Commercial — 50%
Commercial — 50%

Design & Construction of 275kV and 400kV Overhead Lines

Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice)

Statuscancelled

Award criteria
Non-Commercial — 50%
Commercial — 50%

Design & Construction of 132kV Overhead Line Works

Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).

Statuscancelled

Award criteria
Non-Commercial — 50%
Commercial — 50%

What is included

ItemCategoryQuantity
1Construction work for electricity power linesNot published
2Construction work for electricity power linesNot published
3Construction work for electricity power linesNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Construction work for electricity power lines (45231400); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 4512,1264 median · 25.8 average (3,460 of 12,126 with a bid count)3.8 average (3,818 of 12,126 with named award suppliers)Not published
Same buyer113 median · 13 average (1 of 1 with a bid count)15 average (1 of 1 with named award suppliers)Not published
Delivery region: UKM2449 median · 45.2 average (77 of 244 with a bid count)9.9 average (102 of 244 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementYes
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byNot published
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Contracts

Design & Construction of 400kV Overhead Lines with HTLS

Statusactive
Value£600,000,000

Design & Construction of 275kV and 400kV Overhead Lines

Statusactive
Value£1,875,000,000

Design & Construction of 132kV Overhead Line Works

Statusactive
Value£525,000,000

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-04295b
Latest release ID050887-2025
Latest release timestampFri Aug 22 2025 12:35:04 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodselective
Procurement method detailsNegotiated procedure with prior call for competition
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0025
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source3
Tender items in source3
Tender documents in source0
Awards in latest release3
Contracts in latest release3
Parties in latest release11

Notice history

DateEventReference
22 Aug 2025award, contract050887-2025
21 Dec 2023tender037752-2023

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "050887-2025",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 3,
        "measure": "bids",
        "relatedLot": "1"
      },
      {
        "id": "3",
        "value": 6,
        "measure": "bids",
        "relatedLot": "2"
      },
      {
        "id": "5",
        "value": 8,
        "measure": "bids",
        "relatedLot": "3"
      },
      {
        "id": "2",
        "value": 3,
        "measure": "electronicBids",
        "relatedLot": "1"
      },
      {
        "id": "4",
        "value": 6,
        "measure": "electronicBids",
        "relatedLot": "2"
      },
      {
        "id": "6",
        "value": 8,
        "measure": "electronicBids",
        "relatedLot": "3"
      }
    ]
  },
  "date": "2025-08-22T13:35:04+01:00",
  "ocid": "ocds-h6vhtk-04295b",
  "buyer": {
    "id": "GB-COH-SC189126",
    "name": "SP TRANSMISSION PLC"
  },
  "awards": [
    {
      "id": "050887-2025-1",
      "title": "Design & Construction of 400kV Overhead Lines with HTLS",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-01062438",
          "name": "Balfour Beatty Utility Solutions Limited"
        },
        {
          "id": "GB-COH-00245626",
          "name": "M Group Energy (Network Infrastructure) Limited"
        },
        {
          "id": "GB-COH-04273754",
          "name": "Morgan Sindall Construction & Infrastructure Ltd"
        }
      ],
      "relatedLots": [
        "1"
      ]
    },
    {
      "id": "050887-2025-2",
      "title": "Design & Construction of 275kV and 400kV Overhead Lines",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-01062438",
          "name": "Balfour Beatty Utility Solutions Limited"
        },
        {
          "id": "GB-COH-12930461",
          "name": "Aureos Energy Limited"
        },
        {
          "id": "GB-COH-04273754",
          "name": "Morgan Sindall Construction & Infrastructure Ltd"
        },
        {
          "id": "GB-COH-00245626",
          "name": "M Group Energy (Network Infrastructure) Limited"
        },
        {
          "id": "GB-COH-11829648",
          "name": "Wood Transmission And Distribution Limited"
        },
        {
          "id": "GB-FTS-158716",
          "name": "Painhas S.A."
        }
      ],
      "relatedLots": [
        "2"
      ]
    },
    {
      "id": "050887-2025-3",
      "title": "Design & Construction of 132kV Overhead Line Works",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-01062438",
          "name": "Balfour Beatty Utility Solutions Limited"
        },
        {
          "id": "GB-COH-12930461",
          "name": "Aureos Energy Limited"
        },
        {
          "id": "GB-COH-04273754",
          "name": "Morgan Sindall Construction & Infrastructure Ltd"
        },
        {
          "id": "GB-COH-00245626",
          "name": "M Group Energy (Network Infrastructure) Limited"
        },
        {
          "id": "GB-COH-SC062782",
          "name": "Power Lines, Pipes and Cables Limited"
        },
        {
          "id": "GB-FTS-158716",
          "name": "Painhas S.A."
        },
        {
          "id": "GB-FTS-158717",
          "name": "Cobra Instalaciones y Servicios SA"
        },
        {
          "id": "GB-COH-11829648",
          "name": "Wood Transmission And Distribution Limited"
        }
      ],
      "relatedLots": [
        "3"
      ]
    }
  ],
  "tender": {
    "id": "SPT-OHL-SA",
    "lots": [
      {
        "id": "1",
        "title": "Design & Construction of 400kV Overhead Lines with HTLS",
        "status": "cancelled",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "hasOptions": true,
        "description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Non-Commercial",
              "type": "quality",
              "description": "50%"
            },
            {
              "name": "Commercial",
              "type": "cost",
              "description": "50%"
            }
          ]
        }
      },
      {
        "id": "2",
        "title": "Design & Construction of 275kV and 400kV Overhead Lines",
        "status": "cancelled",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "hasOptions": true,
        "description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice)",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Non-Commercial",
              "type": "quality",
              "description": "50%"
            },
            {
              "name": "Commercial",
              "type": "cost",
              "description": "50%"
            }
          ]
        }
      },
      {
        "id": "3",
        "title": "Design & Construction of 132kV Overhead Line Works",
        "status": "cancelled",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "hasOptions": true,
        "description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Non-Commercial",
              "type": "quality",
              "description": "50%"
            },
            {
              "name": "Commercial",
              "type": "cost",
              "description": "50%"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      }
    ],
    "title": "SPT - Strategic Agreement for Transmission Overhead Line Works",
    "status": "complete",
    "legalBasis": {
      "id": "32014L0025",
      "scheme": "CELEX"
    },
    "techniques": {
      "hasFrameworkAgreement": true
    },
    "description": "SPT has appointed partners with the capacity and capability to deliver its strategic infrastructure priorities through a strategic collaborative delivery model. \nThe agreement comprises three (3) Lots: -\n• Lot 1 is for 400kV Overhead Line Works involving a HTLS (High Temperature Low Sag) conductor system \n• Lot 2 is for 275kV and 400kV Overhead Line Works\n• Lot 3 is for 132kV Overhead Line Works\nThe partners appointed to the agreement may be allocated projects and they will provide engineering and design, procure any materials and equipment, and carry out the construction works as per the agreed design with SPT.\nThe contractual arrangements comprise a main Framework Agreement regulating the rights and obligations of SPT and the partners, with call-off contracts for individual packages using the NEC4 family of contracts.\nThere is no guarantee, express or implied, that the appointed partners under the Framework Agreement will receive any, or a particular volume or value of work.",
    "reviewDetails": "Any proceedings relating to a breach of a duty owed by SPT to an economic operator under the Utilities Contracts (Scotland) Regulations 2016 in relation to this procurement must be started within 30 days beginning with the date when the economic operator first knew or ought to have known that grounds for starting the proceedings had arisen unless the court considers that there is a good reason for extending the period within which proceedings may be brought, in which case the court may extend that period up to a maximum of 3 months from that date.",
    "classification": {
      "id": "45231400",
      "scheme": "CPV",
      "description": "Construction work for electricity power lines"
    },
    "procurementMethod": "selective",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Negotiated procedure with prior call for competition"
  },
  "parties": [
    {
      "id": "GB-COH-SC189126",
      "name": "SP TRANSMISSION PLC",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "postalCode": "G2 5AD",
        "countryName": "United Kingdom",
        "streetAddress": "320 St. Vincent Street"
      },
      "details": {
        "url": "http://www.spenergynetworks.co.uk/",
        "classifications": [
          {
            "id": "ELECTRICITY",
            "scheme": "TED_CE_ACTIVITY",
            "description": "Electricity"
          }
        ]
      },
      "identifier": {
        "id": "SC189126",
        "scheme": "GB-COH",
        "legalName": "SP TRANSMISSION PLC"
      },
      "contactPoint": {
        "name": "SPT Strategic Projects",
        "email": "OHLstrategicagreement@scottishpower.com"
      }
    },
    {
      "id": "GB-COH-01062438",
      "name": "Balfour Beatty Utility Solutions Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "01062438",
        "scheme": "GB-COH",
        "legalName": "Balfour Beatty Utility Solutions Limited"
      }
    },
    {
      "id": "GB-COH-01062438",
      "name": "Balfour Beatty Utility Solutions Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "01062438",
        "scheme": "GB-COH",
        "legalName": "Balfour Beatty Utility Solutions Limited"
      }
    },
    {
      "id": "GB-COH-00245626",
      "name": "M Group Energy (Network Infrastructure) Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "Stevenage",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "00245626",
        "scheme": "GB-COH",
        "legalName": "M Group Energy (Network Infrastructure) Limited"
      }
    },
    {
      "id": "GB-COH-04273754",
      "name": "Morgan Sindall Construction & Infrastructure Ltd",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "04273754",
        "scheme": "GB-COH",
        "legalName": "Morgan Sindall Construction & Infrastructure Ltd"
      }
    },
    {
      "id": "GB-COH-12930461",
      "name": "Aureos Energy Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "12930461",
        "scheme": "GB-COH",
        "legalName": "Aureos Energy Limited"
      }
    },
    {
      "id": "GB-COH-11829648",
      "name": "Wood Transmission And Distribution Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "Knutsford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "11829648",
        "scheme": "GB-COH",
        "legalName": "Wood Transmission And Distribution Limited"
      }
    },
    {
      "id": "GB-FTS-158716",
      "name": "Painhas S.A.",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "PT",
        "locality": "Viana do Castelo",
        "countryName": "Portugal"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Painhas S.A.",
        "noIdentifierRationale": "notOnAnyRegister"
      }
    },
    {
      "id": "GB-COH-SC062782",
      "name": "Power Lines, Pipes and Cables Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM",
        "locality": "Scotland",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "SC062782",
        "scheme": "GB-COH",
        "legalName": "Power Lines, Pipes and Cables Limited"
      }
    },
    {
      "id": "GB-FTS-158717",
      "name": "Cobra Instalaciones y Servicios SA",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "ES",
        "locality": "Madrid",
        "countryName": "Spain"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Cobra Instalaciones y Servicios SA",
        "noIdentifierRationale": "notOnAnyRegister"
      }
    },
    {
      "id": "GB-FTS-2553",
      "name": "Glasgow Sheriff Court",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Glasgow",
        "postalCode": "G5 9DA",
        "countryName": "United Kingdom",
        "streetAddress": "1 Carlton Place"
      },
      "identifier": {
        "legalName": "Glasgow Sheriff Court"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "050887-2025-1",
      "title": "Design & Construction of 400kV Overhead Lines with HTLS",
      "value": {
        "amount": 600000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "050887-2025-1",
      "dateSigned": "2024-12-02T00:00:00Z"
    },
    {
      "id": "050887-2025-2",
      "title": "Design & Construction of 275kV and 400kV Overhead Lines",
      "value": {
        "amount": 1875000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "050887-2025-2",
      "dateSigned": "2024-12-02T00:00:00Z"
    },
    {
      "id": "050887-2025-3",
      "title": "Design & Construction of 132kV Overhead Line Works",
      "value": {
        "amount": 525000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "050887-2025-3",
      "dateSigned": "2024-12-02T00:00:00Z"
    }
  ],
  "description": "All financial values stated in this notice are calculated using current prices plus assumed inflation based on RPI forecast rates to 2034. All values are estimates only and the final outturn values will depend on the precise works and services required to be delivered, the means of delivery, the way in which programme and project risks materialise, the actual rates of inflation up to completion of the programme, and other factors.\nThe precise details of each identified project, including specific location, route, form of electricity network infrastructure, construction methodology, and any associated mitigation or enhancement schemes are indicative and remain to be confirmed. The final project details are subject to all necessary consents being obtained (such as any required DCO, Electricity Act 1989 consent or planning permission), the requirements of those consents, and the terms of any necessary land rights to be secured to enable project delivery. SPT gives no commitment as to the basis on which any necessary consents or land rights will be applied for, or obtained.\nThis Framework Agreement, along with other framework agreements that SPT may procure through separate procurement processes, will contribute to SPT's delivery of its strategic projects under the Holistic Network Design (HND) model (which are funded by the Accelerated Strategic Transmission Investment, Large Onshore Transmission Investment and Medium Sized Investment Project frameworks) as well as any baseline projects forming part of SPT's RIIO-T2 and RIIO-T/3 price control settlements and any customer connection projects that SPT considers appropriate to be delivered under this model. For the avoidance of doubt, SPT may have separate arrangements for the delivery of similar works to the works which SPT intends to procure under the Framework Agreement but such arrangements may be based on a different delivery model.\nIt is currently anticipated that SPT's HND programme will be delivered by the partners through these Framework Agreements and the call-off contracts awarded under them, and the full scope of that is included in the scope advertised by this notice.\nHowever, and without limiting that, the works and services awarded to the partners through this Framework Agreement, and the other framework agreements, may extend beyond work required for the HND programme to involve additional works and services, through the award of further contracts in reliance on the procedure in Regulation 48(4)(e) of the Utilities Contracts (Scotland) Regulations 2016 concerning direct awards for new works, services or both, consisting of the repetition of similar works or services. Any contracts for new works or services consisting of the repetition of similar works or services will (as relevant in the circumstances) conform to the requirements of SPT's HND programme and / or for a particular project for which contracts are called-off under these Framework Agreements",
  "initiationType": "tender"
}
Complete JSON history (2 releases)
22 Aug 2025 · 050887-2025 · award, contract
{
  "id": "050887-2025",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 3,
        "measure": "bids",
        "relatedLot": "1"
      },
      {
        "id": "3",
        "value": 6,
        "measure": "bids",
        "relatedLot": "2"
      },
      {
        "id": "5",
        "value": 8,
        "measure": "bids",
        "relatedLot": "3"
      },
      {
        "id": "2",
        "value": 3,
        "measure": "electronicBids",
        "relatedLot": "1"
      },
      {
        "id": "4",
        "value": 6,
        "measure": "electronicBids",
        "relatedLot": "2"
      },
      {
        "id": "6",
        "value": 8,
        "measure": "electronicBids",
        "relatedLot": "3"
      }
    ]
  },
  "date": "2025-08-22T13:35:04+01:00",
  "ocid": "ocds-h6vhtk-04295b",
  "buyer": {
    "id": "GB-COH-SC189126",
    "name": "SP TRANSMISSION PLC"
  },
  "awards": [
    {
      "id": "050887-2025-1",
      "title": "Design & Construction of 400kV Overhead Lines with HTLS",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-01062438",
          "name": "Balfour Beatty Utility Solutions Limited"
        },
        {
          "id": "GB-COH-00245626",
          "name": "M Group Energy (Network Infrastructure) Limited"
        },
        {
          "id": "GB-COH-04273754",
          "name": "Morgan Sindall Construction & Infrastructure Ltd"
        }
      ],
      "relatedLots": [
        "1"
      ]
    },
    {
      "id": "050887-2025-2",
      "title": "Design & Construction of 275kV and 400kV Overhead Lines",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-01062438",
          "name": "Balfour Beatty Utility Solutions Limited"
        },
        {
          "id": "GB-COH-12930461",
          "name": "Aureos Energy Limited"
        },
        {
          "id": "GB-COH-04273754",
          "name": "Morgan Sindall Construction & Infrastructure Ltd"
        },
        {
          "id": "GB-COH-00245626",
          "name": "M Group Energy (Network Infrastructure) Limited"
        },
        {
          "id": "GB-COH-11829648",
          "name": "Wood Transmission And Distribution Limited"
        },
        {
          "id": "GB-FTS-158716",
          "name": "Painhas S.A."
        }
      ],
      "relatedLots": [
        "2"
      ]
    },
    {
      "id": "050887-2025-3",
      "title": "Design & Construction of 132kV Overhead Line Works",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-01062438",
          "name": "Balfour Beatty Utility Solutions Limited"
        },
        {
          "id": "GB-COH-12930461",
          "name": "Aureos Energy Limited"
        },
        {
          "id": "GB-COH-04273754",
          "name": "Morgan Sindall Construction & Infrastructure Ltd"
        },
        {
          "id": "GB-COH-00245626",
          "name": "M Group Energy (Network Infrastructure) Limited"
        },
        {
          "id": "GB-COH-SC062782",
          "name": "Power Lines, Pipes and Cables Limited"
        },
        {
          "id": "GB-FTS-158716",
          "name": "Painhas S.A."
        },
        {
          "id": "GB-FTS-158717",
          "name": "Cobra Instalaciones y Servicios SA"
        },
        {
          "id": "GB-COH-11829648",
          "name": "Wood Transmission And Distribution Limited"
        }
      ],
      "relatedLots": [
        "3"
      ]
    }
  ],
  "tender": {
    "id": "SPT-OHL-SA",
    "lots": [
      {
        "id": "1",
        "title": "Design & Construction of 400kV Overhead Lines with HTLS",
        "status": "cancelled",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "hasOptions": true,
        "description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Non-Commercial",
              "type": "quality",
              "description": "50%"
            },
            {
              "name": "Commercial",
              "type": "cost",
              "description": "50%"
            }
          ]
        }
      },
      {
        "id": "2",
        "title": "Design & Construction of 275kV and 400kV Overhead Lines",
        "status": "cancelled",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "hasOptions": true,
        "description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice)",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Non-Commercial",
              "type": "quality",
              "description": "50%"
            },
            {
              "name": "Commercial",
              "type": "cost",
              "description": "50%"
            }
          ]
        }
      },
      {
        "id": "3",
        "title": "Design & Construction of 132kV Overhead Line Works",
        "status": "cancelled",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "hasOptions": true,
        "description": "Please refer to the contract notice that was published on 21 December 2023 with notice reference 2023/S 000-037752 (the Contract Notice).",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Non-Commercial",
              "type": "quality",
              "description": "50%"
            },
            {
              "name": "Commercial",
              "type": "cost",
              "description": "50%"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      }
    ],
    "title": "SPT - Strategic Agreement for Transmission Overhead Line Works",
    "status": "complete",
    "legalBasis": {
      "id": "32014L0025",
      "scheme": "CELEX"
    },
    "techniques": {
      "hasFrameworkAgreement": true
    },
    "description": "SPT has appointed partners with the capacity and capability to deliver its strategic infrastructure priorities through a strategic collaborative delivery model. \nThe agreement comprises three (3) Lots: -\n• Lot 1 is for 400kV Overhead Line Works involving a HTLS (High Temperature Low Sag) conductor system \n• Lot 2 is for 275kV and 400kV Overhead Line Works\n• Lot 3 is for 132kV Overhead Line Works\nThe partners appointed to the agreement may be allocated projects and they will provide engineering and design, procure any materials and equipment, and carry out the construction works as per the agreed design with SPT.\nThe contractual arrangements comprise a main Framework Agreement regulating the rights and obligations of SPT and the partners, with call-off contracts for individual packages using the NEC4 family of contracts.\nThere is no guarantee, express or implied, that the appointed partners under the Framework Agreement will receive any, or a particular volume or value of work.",
    "reviewDetails": "Any proceedings relating to a breach of a duty owed by SPT to an economic operator under the Utilities Contracts (Scotland) Regulations 2016 in relation to this procurement must be started within 30 days beginning with the date when the economic operator first knew or ought to have known that grounds for starting the proceedings had arisen unless the court considers that there is a good reason for extending the period within which proceedings may be brought, in which case the court may extend that period up to a maximum of 3 months from that date.",
    "classification": {
      "id": "45231400",
      "scheme": "CPV",
      "description": "Construction work for electricity power lines"
    },
    "procurementMethod": "selective",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Negotiated procedure with prior call for competition"
  },
  "parties": [
    {
      "id": "GB-COH-SC189126",
      "name": "SP TRANSMISSION PLC",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "postalCode": "G2 5AD",
        "countryName": "United Kingdom",
        "streetAddress": "320 St. Vincent Street"
      },
      "details": {
        "url": "http://www.spenergynetworks.co.uk/",
        "classifications": [
          {
            "id": "ELECTRICITY",
            "scheme": "TED_CE_ACTIVITY",
            "description": "Electricity"
          }
        ]
      },
      "identifier": {
        "id": "SC189126",
        "scheme": "GB-COH",
        "legalName": "SP TRANSMISSION PLC"
      },
      "contactPoint": {
        "name": "SPT Strategic Projects",
        "email": "OHLstrategicagreement@scottishpower.com"
      }
    },
    {
      "id": "GB-COH-01062438",
      "name": "Balfour Beatty Utility Solutions Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "01062438",
        "scheme": "GB-COH",
        "legalName": "Balfour Beatty Utility Solutions Limited"
      }
    },
    {
      "id": "GB-COH-01062438",
      "name": "Balfour Beatty Utility Solutions Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "01062438",
        "scheme": "GB-COH",
        "legalName": "Balfour Beatty Utility Solutions Limited"
      }
    },
    {
      "id": "GB-COH-00245626",
      "name": "M Group Energy (Network Infrastructure) Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "Stevenage",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "00245626",
        "scheme": "GB-COH",
        "legalName": "M Group Energy (Network Infrastructure) Limited"
      }
    },
    {
      "id": "GB-COH-04273754",
      "name": "Morgan Sindall Construction & Infrastructure Ltd",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "04273754",
        "scheme": "GB-COH",
        "legalName": "Morgan Sindall Construction & Infrastructure Ltd"
      }
    },
    {
      "id": "GB-COH-12930461",
      "name": "Aureos Energy Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "12930461",
        "scheme": "GB-COH",
        "legalName": "Aureos Energy Limited"
      }
    },
    {
      "id": "GB-COH-11829648",
      "name": "Wood Transmission And Distribution Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "Knutsford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "11829648",
        "scheme": "GB-COH",
        "legalName": "Wood Transmission And Distribution Limited"
      }
    },
    {
      "id": "GB-FTS-158716",
      "name": "Painhas S.A.",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "PT",
        "locality": "Viana do Castelo",
        "countryName": "Portugal"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Painhas S.A.",
        "noIdentifierRationale": "notOnAnyRegister"
      }
    },
    {
      "id": "GB-COH-SC062782",
      "name": "Power Lines, Pipes and Cables Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM",
        "locality": "Scotland",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "SC062782",
        "scheme": "GB-COH",
        "legalName": "Power Lines, Pipes and Cables Limited"
      }
    },
    {
      "id": "GB-FTS-158717",
      "name": "Cobra Instalaciones y Servicios SA",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "ES",
        "locality": "Madrid",
        "countryName": "Spain"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Cobra Instalaciones y Servicios SA",
        "noIdentifierRationale": "notOnAnyRegister"
      }
    },
    {
      "id": "GB-FTS-2553",
      "name": "Glasgow Sheriff Court",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Glasgow",
        "postalCode": "G5 9DA",
        "countryName": "United Kingdom",
        "streetAddress": "1 Carlton Place"
      },
      "identifier": {
        "legalName": "Glasgow Sheriff Court"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "050887-2025-1",
      "title": "Design & Construction of 400kV Overhead Lines with HTLS",
      "value": {
        "amount": 600000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "050887-2025-1",
      "dateSigned": "2024-12-02T00:00:00Z"
    },
    {
      "id": "050887-2025-2",
      "title": "Design & Construction of 275kV and 400kV Overhead Lines",
      "value": {
        "amount": 1875000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "050887-2025-2",
      "dateSigned": "2024-12-02T00:00:00Z"
    },
    {
      "id": "050887-2025-3",
      "title": "Design & Construction of 132kV Overhead Line Works",
      "value": {
        "amount": 525000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "050887-2025-3",
      "dateSigned": "2024-12-02T00:00:00Z"
    }
  ],
  "description": "All financial values stated in this notice are calculated using current prices plus assumed inflation based on RPI forecast rates to 2034. All values are estimates only and the final outturn values will depend on the precise works and services required to be delivered, the means of delivery, the way in which programme and project risks materialise, the actual rates of inflation up to completion of the programme, and other factors.\nThe precise details of each identified project, including specific location, route, form of electricity network infrastructure, construction methodology, and any associated mitigation or enhancement schemes are indicative and remain to be confirmed. The final project details are subject to all necessary consents being obtained (such as any required DCO, Electricity Act 1989 consent or planning permission), the requirements of those consents, and the terms of any necessary land rights to be secured to enable project delivery. SPT gives no commitment as to the basis on which any necessary consents or land rights will be applied for, or obtained.\nThis Framework Agreement, along with other framework agreements that SPT may procure through separate procurement processes, will contribute to SPT's delivery of its strategic projects under the Holistic Network Design (HND) model (which are funded by the Accelerated Strategic Transmission Investment, Large Onshore Transmission Investment and Medium Sized Investment Project frameworks) as well as any baseline projects forming part of SPT's RIIO-T2 and RIIO-T/3 price control settlements and any customer connection projects that SPT considers appropriate to be delivered under this model. For the avoidance of doubt, SPT may have separate arrangements for the delivery of similar works to the works which SPT intends to procure under the Framework Agreement but such arrangements may be based on a different delivery model.\nIt is currently anticipated that SPT's HND programme will be delivered by the partners through these Framework Agreements and the call-off contracts awarded under them, and the full scope of that is included in the scope advertised by this notice.\nHowever, and without limiting that, the works and services awarded to the partners through this Framework Agreement, and the other framework agreements, may extend beyond work required for the HND programme to involve additional works and services, through the award of further contracts in reliance on the procedure in Regulation 48(4)(e) of the Utilities Contracts (Scotland) Regulations 2016 concerning direct awards for new works, services or both, consisting of the repetition of similar works or services. Any contracts for new works or services consisting of the repetition of similar works or services will (as relevant in the circumstances) conform to the requirements of SPT's HND programme and / or for a particular project for which contracts are called-off under these Framework Agreements",
  "initiationType": "tender"
}
21 Dec 2023 · 037752-2023 · tender
{
  "id": "037752-2023",
  "tag": [
    "tender"
  ],
  "date": "2023-12-21T16:46:49Z",
  "ocid": "ocds-h6vhtk-04295b",
  "buyer": {
    "id": "GB-COH-SC189126",
    "name": "SP TRANSMISSION PLC"
  },
  "tender": {
    "id": "SPT-OHL-SA",
    "lots": [
      {
        "id": "1",
        "title": "Design & Construction of 400kV Overhead Lines with HTLS",
        "value": {
          "amount": 600000000,
          "currency": "GBP"
        },
        "status": "active",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option.  The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "renewal": {
          "description": "The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option."
        },
        "hasOptions": true,
        "hasRenewal": true,
        "description": "Lot 1 - 400kV Overhead Line Works involving HTLS\nThe works under this Lot will consist of the refurbishment and reconditioning of steel tower overhead lines.  \nThe Scope for Lot 1 includes, but is not limited to:\n•\tEarly Contractor Involvement\n•\tDesktop Design \n•\tDetailed Design\n•\tSite Survey and Condition assessment\n•\tSite establishment - including site prep, site facilities, temporary drainage, waste management\n•\tEnabling works - Access works, site preparation\n•\tTower refurbishment and modification including the supply of materials and equipment\n•\tTower painting\n•\tFoundation upgrades\n•\tCircuit reconductoring including the supply of materials and equipment\n•\tVegetation management \n•\tWhere required, new overhead lines to tie in with substation works.\nThe procurement documents contain further information on the scope of Lot 1, including the proposed contractual arrangements. Additional information: Potential bidders should note that the registration process for GoSupply can take up to two weeks, so interested parties that have not already done so should email OHLstrategicagreement@scottishpower.com in order to start the registration process as soon as possible to maximise the response time that is available to them.",
        "contractPeriod": {
          "durationInDays": 3600
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      },
      {
        "id": "2",
        "title": "Design & Construction of 275kV and 400kV Overhead Lines",
        "value": {
          "amount": 1875000000,
          "currency": "GBP"
        },
        "status": "active",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option. The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "renewal": {
          "description": "The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option."
        },
        "hasOptions": true,
        "hasRenewal": true,
        "description": "Lot 2 - 275kV and 400kV Overhead Line Works \nThe works under this Lot will consist of \n•\tRefurbishment and reconditioning of steel tower overhead lines.  \n•\tDesign and construction of new 275kV Overhead Lines\n•\tDesign and construction of new 400kV Overhead Lines\nThe Scope for Lot 2 includes, but is not limited to:\n•\tEarly Contractor Involvement\n•\tDesktop Design \n•\tDetailed Design\n•\tSite Survey and Condition assessment\n•\tSite establishment - including site prep, site facilities, temporary drainage, waste management\n•\tEnabling works - Access works, site preparation\n•\tTower refurbishment and modification including the supply of materials and equipment\n•\tTower painting\n•\tFoundation upgrades\n•\tCircuit reconductoring including the supply of materials and equipment\n•\tVegetation management\n•\tWhere required, new overhead lines to tie in with substation works.\n•\tSupply and installation of new 275kV overhead lines (SPT shall retain the option to free-issue conductor to the supplier)\n•\tSupply and installation of new 400kV overhead lines (SPT shall retain the option to free-issue conductor to the supplier)\nThe procurement documents contain further information on the scope of Lot 2, including the proposed contractual arrangements. Additional information: Potential bidders should note that the registration process for GoSupply can take up to two weeks, so interested parties that have not already done so should email OHLstrategicagreement@scottishpower.com  in order to start the registration process as soon as possible to maximise the response time that is available to them.",
        "contractPeriod": {
          "durationInDays": 3600
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      },
      {
        "id": "3",
        "title": "Design & Construction of 132kV Overhead Line Works",
        "value": {
          "amount": 525000000,
          "currency": "GBP"
        },
        "status": "active",
        "options": {
          "description": "The duration of the Framework Agreement is 5 years, but extendable up to 10 years (in aggregate) at SPT's option.  The duration of call-off contracts for specific packages may extend beyond the end of the overarching Framework Agreement."
        },
        "renewal": {
          "description": "The duration of the Framework Agreement is an initial 5 years, but extendable up to a maximum of 10 years at SPT's option."
        },
        "hasOptions": true,
        "hasRenewal": true,
        "description": "Lot 3 - 132kV Overhead Line Works \nThe works under this Lot will consist of:\n•\tRefurbishment and reconditioning of 132kV steel tower overhead lines.  \n•\tDesign and construction of new 132kV Tower and Wood Pole Overhead Lines\nThe Scope for Lot 3 includes, but is not limited to:\n•\tEarly Contractor Involvement\n•\tDesktop Design \n•\tDetailed Design\n•\tSite Survey and Condition assessment\n•\tSite establishment - including site prep, site facilities, temporary drainage, waste management\n•\tEnabling works - Access works, site preparation\n•\tTower refurbishment and modification including the supply of materials and equipment\n•\tTower painting\n•\tFoundation upgrades\n•\tCircuit reconductoring including the supply of materials and equipment\n•\tVegetation management \n•\tWhere required, new overhead lines to tie in with substation works.\n•\tSupply and installation of new 132kV overhead lines (SPT shall retain the option to free-issue conductor to the supplier)\nThe procurement documents contain further information on the scope of Lot 3, including the proposed contractual arrangements. Additional information: Potential bidders should note that the registration process for GoSupply can take up to two weeks, so interested parties that have not already done so should email OHLstrategicagreement@scottishpower.com  in order to start the registration process as soon as possible to maximise the response time that is available to them.",
        "contractPeriod": {
          "durationInDays": 3600
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryLocation": {
          "description": "SPT plan to work on a number of 400kV OHL with HTLS projects within this scope across its licence area covering central and southern Scotland."
        },
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryLocation": {
          "description": "SPT plan to work on a number of 275kV and 400kV OHL projects within this scope across its licence area covering central and southern Scotland."
        },
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryLocation": {
          "description": "SPT plan to work on a number of 132kV OHL projects within this scope across its licence area covering central and southern Scotland."
        },
        "deliveryAddresses": [
          {
            "region": "UKM"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45231400",
            "scheme": "CPV",
            "description": "Construction work for electricity power lines"
          }
        ]
      }
    ],
    "title": "SPT - Strategic Agreement for Transmission Overhead Line Works",
    "value": {
      "amount": 3000000000,
      "currency": "GBP"
    },
    "status": "active",
    "documents": [
      {
        "id": "economic",
        "documentType": "economicSelectionCriteria"
      },
      {
        "id": "technical",
        "documentType": "technicalSelectionCriteria"
      }
    ],
    "legalBasis": {
      "id": "32014L0025",
      "scheme": "CELEX"
    },
    "lotDetails": {
      "awardCriteriaDetails": "Where more than one Lot may be awarded to the same bidder, SPT reserves the right to award contracts combining several or all Lots. Bidders can bid for one, two or all three Lots.",
      "maximumLotsBidPerSupplier": null
    },
    "techniques": {
      "frameworkAgreement": {
        "periodRationale": "The potential 10 year duration is to align with SPT's part of the UK's aims through the \"Pathway to 2030 Holistic Network Design\" (as a first step towards Net Zero) and further substantial delivery steps that will be required (with respect to projects to be completed in the first half of the 2030s) to achieve Net Zero by 2050.",
        "maximumParticipants": null
      },
      "hasFrameworkAgreement": true
    },
    "description": "The agreement will comprise of three (3) Lots: -\n•\tLot 1 is for 400kV Overhead Line Works involving a HTLS (High Temperature Low Sag) conductor system \n•\tLot 2 is for 275kV and 400kV Overhead Line Works\n•\tLot 3 is for 132kV Overhead Line Works\nAll Lots are based on an EPC approach whereby the suppliers appointed to the agreement may be allocated projects and they will provide engineering and design, procure any materials and equipment, and carry out the construction works as per the agreed design with SPT.\nDetails of the projects anticipated to be covered under this agreement are available in SPT's procurement documents, including an indication of the scope of work and size of each project. Note that the exact scope of each project may change from the publication of this document. These projects are indicative and may be subject to change. SPT reserves the right to update or amend these projects or add additional projects to the framework.\nThere is no guarantee, express or implied, that the appointed suppliers under the framework agreement will receive any, or a particular volume or value of work.\nA virtual launch event will be held w/c 8 January 2024: to attend please email OHLstrategicagreement@scottishpower.com with the names and email addresses for your attendees.",
    "secondStage": {
      "invitationDate": "2024-02-26T00:00:00Z"
    },
    "tenderPeriod": {
      "endDate": "2024-01-31T12:00:00Z"
    },
    "contractTerms": {
      "performanceTerms": "Please refer to the contract documentation",
      "tendererLegalForm": "Where a group of economic operators are bidding, SPT may require the group to assume a specific legal form for the purpose of the award of the Framework Agreement, or to require that each economic operator assumes joint and several liability.",
      "hasElectronicPayment": true,
      "hasElectronicOrdering": true,
      "electronicInvoicingPolicy": "allowed"
    },
    "hasRecurrence": false,
    "reviewDetails": "Any proceedings relating to a breach of a duty owed by SPT to an economic operator under the Utilities Contracts (Scotland) Regulations 2016 in relation to this procurement must be started within 30 days beginning with the date when the economic operator first knew or ought to have known that grounds for starting the proceedings had arisen unless the court considers that there is a good reason for extending the period within which proceedings may be brought, in which case the court may extend that period up to a maximum of 3 months from that date.",
    "classification": {
      "id": "45231400",
      "scheme": "CPV",
      "description": "Construction work for electricity power lines"
    },
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "bidValidityPeriod": {
        "durationInDays": 180
      },
      "depositsGuarantees": "SPT may require that suppliers provide a parent company guarantee/guarantees or other form of suitable security (depending on the corporate structure) to cover all call-off contracts which may be issued to them under the Framework Agreement. Any bond requirements would be set out on a case-by-case basis in each call-off contract. Further details will be provided in the procurement documents."
    },
    "submissionMethod": [
      "written"
    ],
    "otherRequirements": {
      "reductionCriteria": "Please refer to the rules and criteria for participation and shortlisting as stated in the AQ."
    },
    "participationFees": [
      {
        "id": "1",
        "type": [
          "document"
        ]
      }
    ],
    "procurementMethod": "selective",
    "selectionCriteria": {
      "criteria": [
        {
          "type": "suitability",
          "appliesTo": [
            "supplier"
          ],
          "description": "Please refer to the AQ"
        }
      ]
    },
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Negotiated procedure with prior call for competition"
  },
  "parties": [
    {
      "id": "GB-COH-SC189126",
      "name": "SP TRANSMISSION PLC",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKM",
        "locality": "GLASGOW",
        "postalCode": "G2 5AD",
        "countryName": "United Kingdom",
        "streetAddress": "320 ST VINCENT STREET"
      },
      "details": {
        "url": "https://www.spenergynetworks.co.uk/",
        "buyerProfile": "https://www.scottishpower.com/pages/suppliers.aspx",
        "classifications": [
          {
            "id": "ELECTRICITY",
            "scheme": "TED_CE_ACTIVITY",
            "description": "Electricity"
          }
        ]
      },
      "identifier": {
        "id": "SC189126",
        "scheme": "GB-COH",
        "legalName": "SP TRANSMISSION PLC"
      },
      "contactPoint": {
        "url": "https://portal.mygosupply.com/login",
        "name": "SPT Strategic Projects",
        "email": "OHLstrategicagreement@scottishpower.com"
      }
    },
    {
      "id": "GB-FTS-2553",
      "name": "Glasgow Sheriff Court",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Glasgow",
        "postalCode": "G5 9DA",
        "countryName": "United Kingdom",
        "streetAddress": "1 Carlton Place"
      },
      "identifier": {
        "legalName": "Glasgow Sheriff Court"
      }
    }
  ],
  "language": "en",
  "description": "Interested parties must complete the following steps as soon as possible to participate in this stage of the procurement process:-\n1.\tRegister your interest by sending an email to SPT Strategic Projects at OHLstrategicagreement@scottishpower.com and make clear which Lots are of interest; \n2.\tFully register with Go Supply (if not already) and complete all required information:-\nSuppliers not already registered with Go Supply should register using the following link: https://portal.mygosupply.com/action/landing\nOther Useful Link: https://www.scottishpower.com/pages/suppliers.aspx\nSuppliers already registered with Go Supply must ensure that their registration details and information is up to date.  This can be done by visiting http://www.mygosupply.com and logging in using their unique login details; and \n3.\tComplete and submit SPT's additional questionnaire (AQ), which supplements the information provided to Go Supply, in accordance with the instructions detailed in the AQ by no later than the deadline stated in IV.2.2. \nAt this stage in the procurement process, the procurement documents include a memorandum of information (MoI) and an additional questionnaire (AQ) which will be sent to interested parties following SPT's receipt of the interested party's email (step 1 above). The qualification and shortlisting rules are set out in the AQ. \nAll financial values stated in this notice are calculated using current prices plus assumed inflation based on RPI forecast rates to 2034. All values are estimates only and the final outturn values will depend on the precise works and services required to be delivered, the means of delivery, the way in which programme and project risks materialise, the actual rates of inflation up to completion of the programme, and other factors.\nThe precise details of each identified project, including specific location, route, form of electricity network infrastructure, construction methodology, and any associated mitigation or enhancement schemes are indicative and remain to be confirmed. The final project details are subject to all necessary consents being obtained (such as any required DCO, Electricity Act 1989 consent or planning permission), the requirements of those consents, and the terms of any necessary land rights to be secured to enable project delivery. SPT gives no commitment as to the basis on which any necessary consents or land rights will be applied for, or obtained.\nParties participating in this procurement process do so at their own risk and shall bear their own costs, whether or not the process proceeds as anticipated, or at all.\nSubject to the fuller terms of the procurement documents, SPT reserves the right (in its sole and absolute discretion and without liability to any person): (i) not to accept the highest scoring, or any, bid(s); (ii) to cancel the procurement process or any lot or other part of it at any time; (iii) not to award a contract in any lot or at all; and (iv) to make changes to the content and structure of the procurement process at any time.\nThis Framework Agreement, along with other framework agreements that SPT may procure through separate procurement processes, will contribute to SPT's delivery of its strategic projects under the Holistic Network Design (HND) model (which are funded by the Accelerated Strategic Transmission Investment, Large Onshore Transmission Investment and Medium Sized Investment Project frameworks) as well as any baseline projects forming part of SPT's RIIO-T2 and RIIO-T/3 price control settlements and any customer connection projects that SPT considers appropriate to be delivered under this model.  For the avoidance of doubt, SPT may have separate arrangements for the delivery of similar works to the works which SPT intends to procure under the Framework Agreement but such arrangements may be based on a different delivery model.\nIt is currently anticipated that SPT's HND programme will be delivered by the suppliers through these Framework Agreements and the call-off contracts awarded under them, and the full scope of that is included in the scope advertised by this notice.\nHowever, and without limiting that, the works and services awarded to the suppliers through this Framework Agreement, and the other framework agreements, may extend beyond work required for the HND programme to involve additional works and services, through the award of further contracts in reliance on the procedure in Regulation 48(4)(e) of the Utilities Contracts (Scotland) Regulations 2016 concerning direct awards for new works, services or both, consisting of the repetition of similar works or services. Any contracts for new works or services consisting of the repetition of similar works or services will (as relevant in the circumstances) conform to the requirements of SPT's HND programme and / or for a particular project for which contracts are called-off under these Framework Agreements",