Southern Water Non Infra Framework
Authority: Southern Water Services Limited (Public body)
What is being bought4 lots · detail below
Published requirement descriptiono provide Multi source Framework to deliver: Individual projects and programmes of work.
The framework is anticipated to deliver:
Services across Southern Water’s geographical region including IOW.
Works on both Water and Waste Water sites.
Individual projects and programmes of work will range from £100,000 to £10m+ (most in the middle of this range).
There is no upper threshold for the value of projects and programmes which may be awarded through the framework.
The works may include but not be limited to the following:
Pre-Construction survey and investigation, Design, Civils, Process, Mechanical, Electrical, controls and instrumentation projects.
Capital asset maintenance schemes.
Support and delivery of emerging needs which may include new build installations.
Environmental improvement programmes.
New build and planned asset improvements to pumping stations
Mechanical, Electrical and Control works
Security (SEMD) works
Water, waste water and sludge process improvement works
CPV: Sewage pumping stations construction work · Sewage treatment works · Sludge-treatment works · Wastewater pumping station · Wastewater treatment plant construction work · Wastewater-plant repair and maintenance work · Water distribution and related services · Water-treatment plant construction work · Water-treatment work
How this framework works
From the published notice- Places
- up to 7 suppliers · 13 bids received (1.9 per place) · 6 appointed
Lots and requirements (4)Procurement structure
4 lots · all with a published value · win at most 1 of themLot #1SWS Entire RegionAwardedRenewalPublished value£100,000,000
Non-Infra Framework for Southern Water Services (SWS) to provide services across Southern Water’s geographical region including IOW. Including:
- Works on both Water and Waste Water sites.
- Individual projects and programmes of work will range from £100,000 to £10m+ (most in the middle of this range, programmes of similar work collated to form tranches).
- No upper threshold for the value of projects and programmes which may be awarded through the framework.
The scope of the projects and tranches may include but not be limited to the following:
- Pre-Construction survey and investigation
- Design and Construction Management
- Site Works (Civils, Process, Mechanical, Electrical, controls and instrumentation)
Lot #2SWS East RegionRenewalPublished value£65,000,000
Pre -Construction survey and investigation, Design, Civils, Process, Mechanical, Electrical, controls and
instrumentation projects.
Capital asset maintenance schemes.
Support and delivery of emerging needs which may include new build installations.
Environmental improvement programmes.
New build and planned asset improvements to pumping stations
Mechanical, Electrical and Control works
Security (SEMD) works
Water, waste water and sludge process improvement works Additional information: The value of the framework initial term is £250,000,000 the lot value are estimated only as projects will be awarded in accordance with the criteria and may not be spread evenly across the Lots.
The remainder of the framework 57 months is estimated at £400M however SWS can not determine until funding into AMP 8 is confirmed.
Lot #3SWS West Region (inc IOW)RenewalPublished value£85,000,000
Pre -Construction survey and investigation, Design, Civils, Process, Mechanical, Electrical, controls and
instrumentation projects.
Capital asset maintenance schemes.
Support and delivery of emerging needs which may include new build installations.
Environmental improvement programmes.
New build and planned asset improvements to pumping stations
Mechanical, Electrical and Control works
Security (SEMD) works
Water, waste water and sludge process improvement works Additional information: The value of the framework initial term is £250,000,000 the lot value are estimated only as projects will be awarded in accordance with the criteria and may not be spread evenly across the Lots.
The remainder of the framework 57 months is estimated at £400M however SWS can not determine until funding into AMP 8 is confirmed.
Lot #4SWS Isle of WightRenewalPublished value£15,000,000
Pre-Construction survey and investigation, Design, Civils, Process, Mechanical, Electrical, controls and
instrumentation projects.
Capital asset maintenance schemes.
Support and delivery of emerging needs which may include new build installations.
Environmental improvement programmes.
New build and planned asset improvements to pumping stations
Mechanical, Electrical and Control works
Security (SEMD) works
Water, waste water and sludge process improvement works Additional information: The value of the framework initial term is £250,000,000 the lot value are estimated only as projects will be awarded in accordance with the criteria and may not be spread evenly across the Lots.
The remainder of the framework 57 months is estimated at £400M however SWS can not determine until funding into AMP 8 is confirmed.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (6)
- Competency & Capability: 20
- Contract Delivery: 20
- Behaviours: 10
- Design: 30
- price: 30
- Health Safety & Environment: 20
Published award criteria (6)
- Health Safety & Environment: 20
- Competency & Capability: 20
- Contract Delivery: 20
- Behaviours: 10
- Design: 30
- Price: 30
- Suitability
As described in the Procurement documents
- Legal form for consortia
- The successful partners, whether being a single contractor, prime contractor (which may be an existing company or special purpose vehicle) or consortium, will be required to be a single legal entity
- Shortlisting
- There will be a single PQQ that will qualify suppliers into the ITT stage. Service Providers must indicated in the PQQ all Lots they are bidding on, if you are successfully shortlisted at PQQ you must submit a response to the ITT for each lot bidding on. Each Lot evaluated against MEAT as described in the Procurement Documents
- Successive reduction
- Candidates will be reduced successively across stages
- Price carries 30 of 130 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- “Southern Water Non Infra Framework” is a framework: the contest is a place on its panel, up to 7 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 10 Dec 2021, 22:45 GMT
- Last source update
- 20 Mar 2023, 13:47 GMT
- Authority reference
prj_2433- FTS notice number
2023/S 000-008004- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03001fFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Performance terms
As described in the Procurement documents
Publisher note: Framework will not exceed 8 years Initial term 3.25 years (excepted spend £250M) Extension term up to 4.75 years (estimation only £400M) Submission of expression of interest and procurement specific information: This procurement exercise will be conducted on the BravoSolution e-procurement portal at: https://southernwater.bravosolution.co.uk/ Candidates wishing to be considered for this contract must register their expression of interest and provide additional procurement specific information through the portal as follows: i) Candidates should register on the BravoSolution e-procurement portal at: https://southernwater.bravosolution.co.uk/ ii) Once registered, candidates must express their interest as follows: a) login to the portal; b) select ‘View current opportunities and notices’; c) access the listing related to this framework d) click on Express Interest button; iii) Once you have expressed interest, please complete the PQQ. You must then publish your reply using the publish button; iv) For any support in submitting your expression of interest please contact the eTendering help desk at. 0800 368 4850 or [email protected] CLOSING DATE FOR PQQ IS 12/05/2022
How it was run
Official notice- Appointment period ends
- 12 May 2022, 17:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Deposits and guarantees
- PCG maybe required against financial standing assesments
Timeline
12 May 2022 → 20 Mar 2023 · 4 dates- Admission / appointment period endsperiod end, not a bid countdown12 May 2022, 17:00 BST
- Invitations to tender expected23 Jun 2022, 00:00 BST
- Next notice expected25 Jan 2023
- Notice published20 Mar 2023, 13:47 GMT
Notice history
5 events · 4 releases on Find a Tender · since 12 Apr 2022- Published value updated to £250,000,00012 Apr 2022, 15:41 BSTwas £15,000,000
- Status changed to active12 Apr 2022, 15:41 BST
- Procurement method changed12 Apr 2022, 15:41 BST
- Deadline published: 12 May 2022, 17:00 BST12 Apr 2022, 15:41 BST
- Status changed to complete20 Mar 2023, 13:47 GMT
Published amendments (1 · 0 deadline changes)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | TextEstimated total value · II.1.5 | 15000000 | 150000000 |
1 amendment published without a description.
Routine re-releases (4)
- 2021-12: 1 release · 10 Dec 2021
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast5 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 4 of these contracts carry the same published figure, £130,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Non Infra Framework
- Signed
- 3 Mar 2023
- Value
- ceiling above
- Status
- active
Non Infra Framework
- Signed
- 3 Mar 2023
- Value
- ceiling above
- Status
- active
Non Infra Framework
- Signed
- 3 Mar 2023
- Value
- ceiling above
- Status
- active
Non Infra Framework
- Signed
- 3 Mar 2023
- Value
- ceiling above
- Status
- active
Non Infra Framework
- Signed
- 3 Feb 2023
- Value
- £13,000,000
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · SWS Entire Region | 13bids · 13 electronic · 13 from abroad | 5 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Southern WaterReview body
- Southern Water ServicesReview contact point
Framework contractors & participating bidders
6 commercial parties on the notice- Barhale LtdFramework contractor
- Binnies UK LtdFramework contractor
- Bridges Electrical Engineers LtdFramework contractor
- Galliford Try Construction LimitedFramework contractor
- WGM EngineeringFramework contractor
- Ward and Burke Construction LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria