Find a TenderAwarded
Published 10 Dec 2021, 22:45 GMT

Official UK procurement notice

Southern Water Non Infra Framework

Official notice

Authority: Southern Water Services Limited (Public body)

Framework agreement4 lotsWorksNegotiated procedure with prior call for competitionSME suitableMax 1 lot per supplier
Framework ceiling (notional)£250,000,000total for 4 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 12 May 2022awarded 3 Mar 2023
Lots 4max 1 won per supplier

What is being bought4 lots · detail below

Published requirement description

o provide Multi source Framework to deliver: Individual projects and programmes of work.

The framework is anticipated to deliver:

Services across Southern Water’s geographical region including IOW.

Works on both Water and Waste Water sites.

Individual projects and programmes of work will range from £100,000 to £10m+ (most in the middle of this range).

There is no upper threshold for the value of projects and programmes which may be awarded through the framework.

The works may include but not be limited to the following:

Pre-Construction survey and investigation, Design, Civils, Process, Mechanical, Electrical, controls and instrumentation projects.

Capital asset maintenance schemes.

Support and delivery of emerging needs which may include new build installations.

Environmental improvement programmes.

New build and planned asset improvements to pumping stations

Mechanical, Electrical and Control works

Security (SEMD) works

Water, waste water and sludge process improvement works

CPV: Sewage pumping stations construction work · Sewage treatment works · Sludge-treatment works · Wastewater pumping station · Wastewater treatment plant construction work · Wastewater-plant repair and maintenance work · Water distribution and related services · Water-treatment plant construction work · Water-treatment work

How this framework works

From the published notice
Places
up to 7 suppliers · 13 bids received (1.9 per place) · 6 appointed

Lots and requirements (4)Procurement structure

4 lots · all with a published value · win at most 1 of them
Lot #1SWS Entire RegionAwardedRenewalPublished value£100,000,000

Non-Infra Framework for Southern Water Services (SWS) to provide services across Southern Water’s geographical region including IOW. Including:

  • Works on both Water and Waste Water sites.
  • Individual projects and programmes of work will range from £100,000 to £10m+ (most in the middle of this range, programmes of similar work collated to form tranches).
  • No upper threshold for the value of projects and programmes which may be awarded through the framework.

The scope of the projects and tranches may include but not be limited to the following:

  • Pre-Construction survey and investigation
  • Design and Construction Management
  • Site Works (Civils, Process, Mechanical, Electrical, controls and instrumentation)
Delivery: South East · Sussex, Hampshire, Kent and Isle of Wight
Extensions: Initial term is remainder of AMP 7 and 1st year of AMP 8 - 39 months Extension periods available on this framework are up to 57 months, extension periods likely to be agreed annually after the initial termSecond stage: 4–15 candidates invited to tenderVariant bids: not allowed
Lot #2SWS East RegionRenewalPublished value£65,000,000

Pre -Construction survey and investigation, Design, Civils, Process, Mechanical, Electrical, controls and

instrumentation projects.

Capital asset maintenance schemes.

Support and delivery of emerging needs which may include new build installations.

Environmental improvement programmes.

New build and planned asset improvements to pumping stations

Mechanical, Electrical and Control works

Security (SEMD) works

Water, waste water and sludge process improvement works Additional information: The value of the framework initial term is £250,000,000 the lot value are estimated only as projects will be awarded in accordance with the criteria and may not be spread evenly across the Lots.

The remainder of the framework 57 months is estimated at £400M however SWS can not determine until funding into AMP 8 is confirmed.

Delivery: South East · East Sussex & Kent
Extensions: Initial term is remainder of AMP 7 and 1st year of AMP 8 - 39 months Extension periods available on this framework are up to 57 months, extension periods likely to be agreed annually after the initial termSecond stage: 4–15 candidates invited to tenderVariant bids: not allowed
Lot #3SWS West Region (inc IOW)RenewalPublished value£85,000,000

Pre -Construction survey and investigation, Design, Civils, Process, Mechanical, Electrical, controls and

instrumentation projects.

Capital asset maintenance schemes.

Support and delivery of emerging needs which may include new build installations.

Environmental improvement programmes.

New build and planned asset improvements to pumping stations

Mechanical, Electrical and Control works

Security (SEMD) works

Water, waste water and sludge process improvement works Additional information: The value of the framework initial term is £250,000,000 the lot value are estimated only as projects will be awarded in accordance with the criteria and may not be spread evenly across the Lots.

The remainder of the framework 57 months is estimated at £400M however SWS can not determine until funding into AMP 8 is confirmed.

Delivery: South East · West Sussex, Hampshire and IOW
Extensions: Initial term is remainder of AMP 7 and 1st year of AMP 8 - 39 months Extension periods available on this framework are up to 57 months, extension periods likely to be agreed annually after the initial termSecond stage: 4–15 candidates invited to tenderVariant bids: not allowed
Lot #4SWS Isle of WightRenewalPublished value£15,000,000

Pre-Construction survey and investigation, Design, Civils, Process, Mechanical, Electrical, controls and

instrumentation projects.

Capital asset maintenance schemes.

Support and delivery of emerging needs which may include new build installations.

Environmental improvement programmes.

New build and planned asset improvements to pumping stations

Mechanical, Electrical and Control works

Security (SEMD) works

Water, waste water and sludge process improvement works Additional information: The value of the framework initial term is £250,000,000 the lot value are estimated only as projects will be awarded in accordance with the criteria and may not be spread evenly across the Lots.

The remainder of the framework 57 months is estimated at £400M however SWS can not determine until funding into AMP 8 is confirmed.

Delivery: South East · IOW
Extensions: Initial term is remainder of AMP 7 and 1st year of AMP 8 - 39 months Extension periods available on this framework are up to 57 months, extension periods likely to be agreed annually after the initial termSecond stage: 4–15 candidates invited to tenderVariant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 80Price: 30Environmental: 20
Published sub-criteria (6)
  • Competency & Capability: 20
  • Contract Delivery: 20
  • Behaviours: 10
  • Design: 30
  • price: 30
  • Health Safety & Environment: 20
Published award criteria (6)
  • Health Safety & Environment: 20
  • Competency & Capability: 20
  • Contract Delivery: 20
  • Behaviours: 10
  • Design: 30
  • Price: 30
Lot distribution rule: Lot 1 - Entire SWS Region Lot 2 - East Lot 3 - West inc IOW Lot 4 - IOW Lot 1 up to 6 framework places minimum of 2 Lot 2, 3 and 4 awarded depending upon bids received and interest in geographical lotting. Lot 2 - if applicable will be 1 -3 framework places Lot 3 - if applicable will be 1 -3 framework places Lot 4 - if applicable will be 0 -2 framework places
Conditions of participation1
  • Suitability

    As described in the Procurement documents

Legal form for consortia
The successful partners, whether being a single contractor, prime contractor (which may be an existing company or special purpose vehicle) or consortium, will be required to be a single legal entity
Shortlisting
There will be a single PQQ that will qualify suppliers into the ITT stage. Service Providers must indicated in the PQQ all Lots they are bidding on, if you are successfully shortlisted at PQQ you must submit a response to the ITT for each lot bidding on. Each Lot evaluated against MEAT as described in the Procurement Documents
Successive reduction
Candidates will be reduced successively across stages
What this means for your bid
  • Price carries 30 of 130 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
  • “Southern Water Non Infra Framework” is a framework: the contest is a place on its panel, up to 7 suppliers, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Negotiated procedure with prior call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
10 Dec 2021, 22:45 GMT
Last source update
20 Mar 2023, 13:47 GMT
Authority reference
prj_2433
FTS notice number
2023/S 000-008004
Classification (CPV)
Sewage pumping stations construction workSewage treatment worksSludge-treatment worksWastewater pumping stationWastewater treatment plant construction workWastewater-plant repair and maintenance workWater distribution and related servicesWater-treatment plant construction workWater-treatment work
Delivery area
South East (UKJ)
Official registry OCID
ocds-h6vhtk-03001f Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment
Performance terms

As described in the Procurement documents

Publisher note: Framework will not exceed 8 years Initial term 3.25 years (excepted spend £250M) Extension term up to 4.75 years (estimation only £400M) Submission of expression of interest and procurement specific information: This procurement exercise will be conducted on the BravoSolution e-procurement portal at: https://southernwater.bravosolution.co.uk/ Candidates wishing to be considered for this contract must register their expression of interest and provide additional procurement specific information through the portal as follows: i) Candidates should register on the BravoSolution e-procurement portal at: https://southernwater.bravosolution.co.uk/ ii) Once registered, candidates must express their interest as follows: a) login to the portal; b) select ‘View current opportunities and notices’; c) access the listing related to this framework d) click on Express Interest button; iii) Once you have expressed interest, please complete the PQQ. You must then publish your reply using the publish button; iv) For any support in submitting your expression of interest please contact the eTendering help desk at. 0800 368 4850 or [email protected] CLOSING DATE FOR PQQ IS 12/05/2022

How it was run

Official notice
Run through: Jaggaer · Who buys & how to bid on JAGGAER
Supplier login requiredLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail
Appointment period ends
12 May 2022, 17:00 BST
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Bid validity
180 days from the deadline
Deposits and guarantees
PCG maybe required against financial standing assesments
Detailed submission instructions & authority contactsFrom official release

Timeline

12 May 2022 → 20 Mar 2023 · 4 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    12 May 2022, 17:00 BST
  2. Invitations to tender expected
    23 Jun 2022, 00:00 BST
  3. Next notice expected
    25 Jan 2023
  4. Notice published
    20 Mar 2023, 13:47 GMT

Notice history

5 events · 4 releases on Find a Tender · since 12 Apr 2022
  1. Published value updated to £250,000,000
    12 Apr 2022, 15:41 BST
    was £15,000,000
  2. Status changed to active
    12 Apr 2022, 15:41 BST
  3. Procurement method changed
    12 Apr 2022, 15:41 BST
  4. Deadline published: 12 May 2022, 17:00 BST
    12 Apr 2022, 15:41 BST
  5. Status changed to complete
    20 Mar 2023, 13:47 GMT
Published amendments (1 · 0 deadline changes)
WhenWhatBeforeAfterShift
—TextEstimated total value · II.1.515000000150000000

1 amendment published without a description.

Routine re-releases (4)
  • 2021-12: 1 release · 10 Dec 2021

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 6admitted to the panel · see the list ↓
Bids received 135 from SMEs
Contracts signed 5latest 3 Mar 2023

5 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 4 of these contracts carry the same published figure, £130,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Non Infra Framework

    Signed
    3 Mar 2023
    Value
    ceiling above
    Status
    active
  • Non Infra Framework

    Signed
    3 Mar 2023
    Value
    ceiling above
    Status
    active
  • Non Infra Framework

    Signed
    3 Mar 2023
    Value
    ceiling above
    Status
    active
  • Non Infra Framework

    Signed
    3 Mar 2023
    Value
    ceiling above
    Status
    active
  • Non Infra Framework

    Signed
    3 Feb 2023
    Value
    £13,000,000
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · SWS Entire Region13bids · 13 electronic · 13 from abroad5——

Contracting authority & participating public bodies

Southern Water Services Ltd.

Contracting authorityPublic bodyWater Southern House, Worthing, South East, BN13 3NXContact email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Southern WaterReview body Worthing
  • Southern Water ServicesReview contact point Worthing

Framework contractors & participating bidders

6 commercial parties on the notice
  • Barhale LtdFramework contractor01268005 Barhale House, Bescot Crescent, Walsall, West Midlands, WS1 4NN, Walsall, UK, WS1 4NN
  • Binnies UK LtdFramework contractor03163649 Spring Lodge, 172 Chester Road, Helsby, Cheshire, United Kingdom,, Cheshire, UK, WA6 0AR
  • Bridges Electrical Engineers LtdFramework contractor02837204 Engineering House, Second Avenue, Westfield Trading Estate, Midsomer Norton, BA3 4BH, Midsomer Norton, UK, BA3 4BH
  • Galliford Try Construction LimitedFramework contractor2472080 Blake House, 3 Frayswater Place, Cowley, Uxbridge, UK, UB8 2AD
  • WGM EngineeringFramework contractorSC099834 65 Sussex Street, Glasgow, Scotland, G41 1DX, Glasgow, UK, G41 1DX
  • Ward and Burke Construction LtdFramework contractor336958 Stradbally East, Kilcolgan, Co Galway, Ireland., Co Galway, UK

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria