Find a TenderAwardedContract award notice
Published 15 Oct 2025, 17:38 BST

Official UK procurement notice

Single Supplier Framework Agreement for SaaS Platform Client Side Advisory for Implementation and Post Implementation Period (Project Prime)

Official notice

Authority: ENERGIA GROUP NI HOLDINGS LIMITED (Public body)

Framework agreement2 lotsServicesOpen procedureAbove thresholdUtilities
Sectors: IT Services & Software (72) Delivery listed: Ireland (IE)Northern Ireland (UKN)
Framework ceiling (notional)£1,800,000total for 2 lots · framework ceiling, not attributable revenue
Submissions closed 17 Nov 2025awarded 16 Apr 2026
Award (standstill) to KPMG Ireland
Framework period 1 yr 6 moends 11 Jul 2027 · up to 11 Jul 2028 with extensions · starts 12 Jan 2026

What is being bought2 lots · detail below

Published requirement description

We require a Client Side Advisor (CSA) to have full access to a talent pool with experience of ERP Tier 1 systems which can be agreed and drawn down upon once the contract is awarded. We expect the advisory service provider to have direct experience with our chosen solution. The CSA will be experienced in ERP implementation with tested implementation methodology, accelerated deployment and programme phasing which will support the project team and will provide advice on the overarching programme plan and SOW being agreed with the System implementer. A blend of skills will be drawn down as and when required from the CSA's team to work alongside Energia Group's internal team. It is Energia's intention to award this contract as a single supplier framework agreement in 2 Lots:

Lot 1 - Client Side Advisory for Implementation and Post Implementation Period Appointment of a system agnostic CSA who will lead the successful delivery of ERP implementation and drive value from the SI, mitigate risks normally associated with a complex ERP programme and provide expertise to the project team where required.

Lot 2 - Client Side Advisory for Enhancements and Additional Modules (Optional)

The EGTI2501 Enterprise Resource Planning (ERP) Platform and Associated Implementation and Support Services includes the scope to avail of procuring and implementing additional modules throughout the contract period. Should Energia proceed with procuring these additional modules, we reserve the right at our discretion, to avail or not avail of this EGTI2505 Software as a Service (SaaS) Client Side Advisory for Implementation and Post Implementation Period (Project Prime) contract for support during their implementation.

CPV: IT services: consulting, software development, Internet and support

How this framework works

From the published notice
Type
Open framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Framework period
1 yr 6 mo · up to 2 yrs 6 mo from 12 Jan 2026
Who may buy through it

Energia Group NI Holdings Ltd is the contracting entity for the purposes of this procurement process and the Contract(s) to be awarded to the successful Supplier(s).

Whilst it is the intention for Energia Group Holdings NI Ltd to be the counterparty in the awarded Contract, it reserves the right to allow any of the Energia Group entities to enter the Contract with the successful Supplier.

Published description of the framework

It is Energia's intention to appoint one (1) supplier to the framework for both Lots.

Being a single supplier framework, only the Supplier that submits the MAT will be appointed to both Lot 1 and Lot 2 of the framework.

Lot 1 - Client Advisory for the Implementation and Post Implementation Period

The successful Supplier will be appointed for the scope of this Lot. Appointment will be based on the successful Supplier's tender submission and this ITT framework conditions of contract.

Lot 2 - Client Advisory for Enhancements and Additional Modules (optional)

This Lot is optional for Energia and may be availed of on an ad hoc basis and the successful Supplier will not have to compete for each new contract.

Future call offs under Lot 2 will be detailed in SOW(s) which will form part of the framework contract.

The Supplier is appointed as per their tender submission pricing and ITT framework conditions of contract with a SOW.

It is emphasised that this contract agreement constitutes no guarantee to purchase a specific quantity of services.

Lots and requirements (2)Procurement structure

2 lots · all with a published value · same evaluation weights on every lot

Every one of these 2 lots carries the same published figure, £1,800,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Client Side Advisory for the Implementation and Post Implementation PeriodAwardedRenewal 1 yr 6 moceiling above

The source published no individual description for this lot.

Contract period: 12 Jan 2026 – 11 Jul 2027 (1 yr 6 mo) · up to 11 Jul 2028 with extensions
Delivery listed: Ireland (IE), Northern Ireland
Extensions: Lot 1 - Client Side Advisory for Implementation and Post Implementation Period Please note, this lot may include additional modules at the same time as the initial ERP implementation roadmap should that be appropriate. This will be confirmed on appointment. Lot 2 - Client Side Advisory for Enhancements and Additional Modules (Optional) CSA for other project requirements Energia also reserves the right to avail of Lot 2 for CSA requirements that fall within scope of this framework for any system within Energia Group. This will depend on our business needs and will be at Energia's discretion. Other system Requirements will be discussed with the Supplier and will follow the framework call off as detailed below. · The initial contract term will be for a period of 18 months with an option to extend the contract by a further 2 x 6 months subject to review, totalling a maximum of 30 months (potentially 2.5 years). Extending the contract will be at Energia's discretion.
Lot #2Client Side Advisor for Enhancements and Additional Modules (optional)AwardedRenewal 6 moceiling above

The source published no individual description for this lot.

Contract period: 12 Jul 2027 – 11 Jan 2028 (6 mo) · up to 11 Jan 2030 with extensions
Delivery listed: Ireland (IE), Northern Ireland
Extensions: Lot 1 - Client Side Advisory for Implementation and Post Implementation Period Please note, this lot may include additional modules at the same time as the initial ERP implementation roadmap should that be appropriate. This will be confirmed on appointment. Lot 2 - Client Side Advisory for Enhancements and Additional Modules (Optional) CSA for other project requirements Energia also reserves the right to avail of Lot 2 for CSA requirements that fall within scope of this framework for any system within Energia Group. This will depend on our business needs and will be at Energia's discretion. Other system Requirements will be discussed with the Supplier and will follow the framework call off as detailed below. · This framework Lot will be for one (1) x 6 months year post Lot 1 contract fulfilment with the option to extend the contract for a further 5 x 6 months, totalling a maximum of 30months (potentially 2.5 years) subject to Energia's business needs and satisfactory contract performance. However, Lot 1 and Lot 2 combined will be no longer than 48 months. For the avoidance of doubt, if Lot 1 is extended to 30 months then the Lot 2 total contract period can be no longer than 3 x 6 months (i.e. 18 months).

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 2 lots
Quality: 65%Price: 35%
Published sub-criteria (2)
  • Technical/Quality: 65%
  • Cost: 35%
Published award criteria (2)
  • Technical/Quality
  • Cost
What this means for your bid
  • Price carries 35 of 100 points: a 10% discount moves about 3.5 points. The method statement decides this lot, not the discount.
  • “Single Supplier Framework Agreement for SaaS Platform Client Side…” is a framework: the contest is a place on its panel, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Energia Group NI Holdings Ltd is the contracting entity for the purposes of this procurement process and the Contract(s) to be awarded to the successful Supplier(s). Whilst it is the intention for Energia Group Holdings NI Ltd to be the counterparty in the awarded Contract, it reserves the right to allow any of the Energia Group entities to enter the Contract with the successful Supplier.
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
15 Oct 2025, 17:38 BST
Last source update
16 Apr 2026, 16:00 BST
Award evaluation window
Submission end – 8 Dec 2025
Authority reference
EGTI2505
FTS notice number
2025/S 000-065732
Latest notice
Contract award notice (UK6)
Classification (CPV)
IT services: consulting, software development, Internet and support
Delivery area in notice
Ireland (IE)Northern Ireland (UKN)
Official registry OCID
ocds-h6vhtk-05cd9a Find a Tender

How it was run

Official notice
Run through: portal not identified
Electronic submission allowedLanguage: EN
Appointment period ends
17 Nov 2025, 12:00 GMT
Clarification deadline
10 Nov 2025, 12:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Tender documents will be available on procurement.energiagroup.com ↗

Before Supplier's can access the invitation to tender documents, Supplier's must sign the attached NDA and return their signed form to [email protected].

When Energia is in receipt of a signed NDA, the Supplier will receive a copy of the tender documents and be asked if they wish to submit a tender response.

Timeline

15 Oct 2025 → 27 Apr 2026 · 8 dates
  1. Tender notice published371 days ago
    15 Oct 2025, 17:38 BST
  2. Clarification questions by345 days ago
    10 Nov 2025, 12:00 GMT
  3. Admission / appointment period ends338 days ago · period end, not a bid countdown
    17 Nov 2025, 12:00 GMT
  4. Award decision expected by317 days ago
    8 Dec 2025, 23:59 GMT
  5. Contract starts283 days ago
    12 Jan 2026
  6. Assessment summaries sent189 days ago
    16 Apr 2026, 00:00 BST
  7. Latest notice published188 days ago
    16 Apr 2026, 16:00 BST
  8. Standstill ends177 days ago
    27 Apr 2026, 23:59 BST

Notice history

4 events · 2 releases on Find a Tender · since 15 Oct 2025
  1. Tender notice published
    15 Oct 2025, 17:38 BST
    UK4
  2. Contract award notice published
    16 Apr 2026, 16:00 BST
    UK6
  3. Status changed to complete
    16 Apr 2026, 16:00 BST
  4. Contract signature expected
    14 May 2026, 23:59 BST
    scheduled

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awarded toValueDateStatus
Across several lots1 award
KPMG Ireland21 May 2026 – 20 Nov 2027 · up to 20 Nov 2028Extensions: The initial contract term will be for a period of 18 months with an option to extend the contract by a further 2 x 6 months subject to review, totalling a maximum of 30 months (potentially 2.5 years). Extending the contract will be at Energia's discretion. · Options: Lot 2. Client Side Advisor for Enhancements and Additional Modules (optional) Description This Lot is optional for Energia and may be availed of on an ad hoc basis and the successful Supplier will not have to compete for each new contract. Future call offs under Lot 2 will be detailed in SOW(s) which will form part of the framework contract. The Supplier is appointed as per their tender submission pricing and ITT framework conditions of contract with a SOW. This framework Lot will be for one (1) x 6 months year post Lot 1 contract fulfilment with the option to extend the contract for a further 5 x 6 months, totalling a maximum of 30months (potentially 2.5 years) subject to Energia's business needs and satisfactory contract performance. However, Lot 1 and Lot 2 combined will be no longer than 48 months. For the avoidance of doubt, if Lot 1 is extended to 30 months then the Lot 2 total contract period can be no longer than 3 x 6 months (i.e. 18 months).£1,028,86216 Apr 2026standstill to 27 Apr 2026Standstill

Contracting authority & participating public bodies

ENERGIA GROUP NI HOLDINGS LIMITED

Contracting authorityPrivate utilityNorthern Irish devolved regulations apply GB-COH: NI033250 · GB-PPON: PDPH-4346-JGHQ Greenwood House, 64 Newforge Lane, Belfast, Northern Ireland, BT9 5NFContact email

Framework contractors & participating bidders

1 commercial party on the notice
  • KPMG IrelandFramework contractorGB-PPON: PZNV-4377-GCLH 1 Stokes Place, St Stephen's Green, Dublin, IE, D02 DE03, IEContact email

Official documents & specifications (3)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specifications tenderBidding documents and specificationsDOCXPlease see attached a Non Disclosure Agreement (NDA). Before Supplier's can access the invitation to tender documents, Supplier's must sign the attached NDA and return the signed form to [email protected]. It is the Supplier's responsibility to review and return the s…

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender