Official UK procurement notice
Single Party Framework for Electrical Control Systems
Authority: Liverpool City Region Combined Authority (LCRCA) / Merseytravel (Local council)
What is being bought
Published requirement descriptionMerseytravel requires to have a single party framework in place for the purpose of replacing electrical control systems (Variable Speed Drives (VSD)) and associated equipment including cables and SCADA and/or other control equipment initially across sites within the Merseytravel portfolio of buildings, these being Georges Dock, North John Street, NewQuay, Woodside and Sydney Street ventilation stations.
Within each of these locations the installation of one or more VSDs is to form the basis for the works. Each piece of work shall be ‘called-off’ from the Framework.
- Recurrence: Contract Notice to be issued approx. 6 months prior to end of the 4 year term of this Framework agreement.
CPV: Construction work · Electrical installation work · Installation services of electrical and mechanical equipment
How this framework works
From the published notice- Places
- up to 1 suppliers
The lotProcurement structure
single lot · value publishedLot #1Merseytravel requires to have a single framework in place for the purpose of replacing…Published value£5,000,000
Merseytravel requires to have a single framework in place for the purpose of replacing electrical control systems (Variable Speed Drives (VSD)) and associated equipment including cables and SCADA and/or other control equipment initially across sites within the Merseytravel portfolio of buildings, these being Georges Dock, North John Street, NewQuay, Woodside and Sydney Street ventilation stations.
Within each of these locations the installation of one or more VSDs is to form the basis for the works. Each piece of work shall be ‘called-off’ from the Framework.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 30
- Price: 70
- Price carries 70 of 100 points: a 10% discount moves about 7 points. This one is won on the number: sharpen the price before polishing the prose.
- “Single Party Framework for Electrical Control Systems” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
Yes · Contract Notice to be issued approx. 6 months prior to end of the 4 year term of this Framework agreement.
- First published
- 1 Feb 2022, 14:11 GMT
- Last source update
- 1 Feb 2022, 14:11 GMT
- Award evaluation window
- 29 Mar 2022 – …
- Authority reference
DN594365- FTS notice number
2022/S 000-002829- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0311a7Find a Tender
How it was run
Official notice- Appointment period ends
- 29 Mar 2022, 11:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 120 days from the deadline
- Bids opened
- 29 Mar 2022, 11:00 BST
Timeline
1 Feb 2022 → 29 Mar 2022 · 3 dates- Notice published1 Feb 2022, 14:11 GMT
- Admission / appointment period endsperiod end, not a bid countdown29 Mar 2022, 11:00 BST
- Bids opened29 Mar 2022, 11:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Royal Courts of JusticeReview body
Official documents & specifications (1)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria