Find a TenderAwarded
Published 17 Dec 2024, 15:09 GMT

Official UK procurement notice

ScotRail InterCity Replacement Fleet and Technical Support and Spares Supply

Official notice

Authority: ScotRail Trains Limited

GoodsNegotiated procedure with prior call for competition
Budget not disclosedValue not published
Submissions closed 3 Feb 2025awarded 18 Mar 2026
Awarded to Alstom Transport UK, Eversholt Rail
Contract term 10 yrs 1 moends 31 Dec 2035 · extension options published · starts 28 Nov 2025

What is being bought

Published requirement description

ScotRail has received proposals for the supply of rolling stock to operate 19 service diagrams per day on its intercity routes connecting Glasgow, Edinburgh, Perth, Stirling, Dundee, Inverness and Aberdeen.

This competition was a combined process to select providers of:

(a) the InterCity Replacement Fleet under a rolling stock lease, including any refurbishment and enhancement work; and a

(b) technical support and spares supply agreement, with additional maintenance and support during introduction and may include some heavy maintenance services.

These contracts have been awarded to two different contracting entities. However, in responding to this Contract Notice bidders were required to respond jointly in a manner that satisfies all contractual requirements.

CPV: Repair and maintenance services of rolling stock · Rolling stock

The lotProcurement structure

single lot · no lot value published
Lot #1Following the Cabinet Secretary for Transport’s announcement on 3 September 2024 that…AwardedRenewal 10 yrs 1 mo

Following the Cabinet Secretary for Transport’s announcement on 3 September 2024 that a replacement was to be sought for the High Speed Train (HST) fleet which operates intercity routes between Glasgow, Edinburgh, Aberdeen and Inverness, ScotRail (SRT) was seeking expressions of interest, and from those who prequalify, tenders for:

  1. the supply of a single fleet/class of existing rolling stock to operate its intercity services; and
  2. the provision of technical support and spares supply arrangement to enable SRT to maintain the fleet.

The InterCity Replacement Fleet must demonstrate improved reliability and availability, reduced emissions and operating costs compared to the current HSTs. The fleet must be capable of operating on existing Network Rail infrastructure on SRT’s intercity corridors with minimum changes to achieve a statement of compatibility and safety validation.

The fleet shall be of sufficient size to operate a minimum of 19 daily passenger diagrams plus sufficient spare trains for maintenance. The average passenger diagram operates approx 220,000 miles p/a.

The supplier of the trains will be required to refurbish the fleet (as needed) before it enters passenger service to provide SRT customers with a reliable and comfortable journey, attractive environment and suitable facilities. The fleet will be required to operate in reliable passenger service until at least 2035 and may be required (in whole or in part) until 2042 without further refurbishments.

With passenger services expected to enter service before the end of 2027, there will be a phased approach to the trains being introduced, with the final train expected to be in operation before the end of 2028.

SRT will conduct maintenance with support from a Service Provider under an enhanced Technical Support and Spare Supply Agreement (TSSSA+) to include all scheduled, unscheduled and ad hoc maintenance materials; off-train overhauls; technical support and continuous process improvement to improve productivity and efficiency.

The TSSSA+ includes enhanced elements:

-Knowledge transfer and training of SRT staff to competently operate and maintain the fleet.

-Heavy maintenance activities which cannot be conducted at SRT depots.

-Maintenance services at the supplier's facilities during driver training and fleet transition (when SRT will still be maintaining the HST fleet).

This Procurement was a single process to select providers of:

-the InterCity Replacement fleet under a rolling stock lease including any refurbishment and enhancement work.

-technical support and spares supply with additional maintenance and support during introduction.

Contracts have been awarded to two different contracting entities. Bidders were required to respond jointly to this Contract Notice to satisfy all contractual elements. E.g. as a joint venture or consortium with one party providing The Fleet and the other providing the TSSSA+ elements.

Applicants had their capability and financial standing evaluated and successful applicants proceeded to an Invitation to Negotiate.

This procurement was run by (contracts awarded by and signed with) SRT, its aim is to deliver Transport Scotland’s (TS) requirements. Following receipt and evaluation of tenders, SRT prepared a Final Business Case (FBC) in line with Scottish Transport Appraisal Guidance for approval by TS. This included comparison against alternative options, including procurement of a new build train (not in scope of this procurement).

Contract period: 28 Nov 2025 – 31 Dec 2035 (10 yrs 1 mo)
Delivery: Scotland
Extensions: Lease: options to extend some or all of the fleet up to 2042 TSSSA: options to extend up to 2042 · ScotRail have the option to extend up until 2040, for all or part of the fleet.Second stage: 1–3 candidates invited to tenderVariant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
Conditions of participation1
  • Suitability

    Selection criteria as stated in the procurement documents

Shortlisting
As stated in the procurement documents
Successive reduction
Candidates will be reduced successively across stages

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Negotiated procedure with prior call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
17 Dec 2024, 15:09 GMT
Last source update
13 Apr 2026, 09:51 BST
Authority reference
SR-PACT-PROJ-245
FTS notice number
2026/S 000-033078
Classification (CPV)
Repair and maintenance services of rolling stockRolling stock
Delivery area
Scotland (UKM)
Official registry OCID
ocds-h6vhtk-04c8cd Find a Tender
Contract terms summary

Lease and Technical Support and Spares Supply Agreement (TSSSA) payments as stated in the procurement documents.

Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment
Performance terms

As stated in the procurement documents.

Publisher note: (SC Ref:829177)

How it was run

Official notice
Run through: portal not identified
Language: EN

Tender documents are also served through a separate tool: https://www.publiccontractsscotland.gov.uk/ ↗

Submission deadline
3 Feb 2025, 16:00 GMT
Submission channel
{"electronicSubmission"}
Accepted languages
en
Deposits and guarantees

A Parent Company Guarantee, Advance Payment Bond and potentially other credit support arrangements may be required to be provided by the successful Bidder. Detailed requirements will be set out in the Invitation to Negotiate.

Detailed submission instructions & authority contactsFrom official release

Timeline

3 Feb 2025 → 13 Apr 2026 · 5 dates
  1. Submission deadline
    3 Feb 2025, 16:00 GMT
  2. Invitations to tender expected
    3 Mar 2025
  3. Contract starts327 days ago
    28 Nov 2025
  4. Bids must remain valid until203 days ago
    31 Mar 2026, 23:59 BST
  5. Notice published191 days ago
    13 Apr 2026, 09:51 BST

Notice history

2 events · 3 releases on Find a Tender · since 13 Jan 2025
  1. Deadline moved to 3 Feb 2025, 16:00 GMT
    13 Jan 2025, 16:39 GMT
    +6 days · was 28 Jan 2025, 16:00 GMT
  2. Status changed to complete
    13 Apr 2026, 09:51 BST
Published amendments (1 · 1 deadline change)
WhenWhatBeforeAfterShift
—DeadlineTime limit · IV.2.228 Jan 20253 Feb 2025+6 d
—Contract periodDuration Start · II.2.728 Nov 202528 Nov 2025+0 d
—Contract periodDuration End · II.2.731 Dec 203531 Dec 2035+0 d
—DateEstimated date of dispatch of invitations · IV.2.33 Mar 20253 Mar 2025+0 d
—Bid validityMinimum time frame during which the tenderer must maintain the tender · IV.2.631 Mar 202631 Mar 2026+0 d

Extension to PQQ response deadline only.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Bids received 1
Contracts signed 1latest 18 Mar 2026
Awarded toValueDateStatus
Alstom Transport UK, Eversholt Railjoint awardSubcontracting: declared——Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
1bids · 1 electronic · 1 from abroad0——

Contracting authority & participating public bodies

ScotRail Trains Limited

Contracting authorityRailway Services Atrium Court, 50 Waterloo Street, Glasgow, Scotland, G2 6HQContact email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Glasgow Sheriff Court and Justice of the Peace CourtReview body Glasgow

Bidders & participating suppliers

2 commercial parties on the notice
  • Alstom Transport UKAwarded supplier 175 High Holborn, London, London, WC1V 7AA
  • Eversholt RailAwarded supplier Chancery House, 53-64 Chancery Lane, London, London, WC2A 1QSContact phone

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria