"id": "064413-2026",
"tag": [
"tender"
],
"date": "2026-07-08T17:41:00+01:00",
"ocid": "ocds-h6vhtk-065365",
"buyer": {
"id": "GB-PPON-PCNL-5714-PRZV",
"name": "Portsmouth City Council"
},
"tender": {
"id": "P00005192",
"lots": [
{
"id": "1",
"title": "Lot 1a - Minor Coastal & Flood Civil Engineering Works",
"value": {
"amount": 6000000,
"currency": "GBP",
"amountGross": 7200000
},
"status": "active",
"renewal": {
"description": "The Framework contract will start as close to 1st March 2027 as possible and operate for an initial term of four years. \nProvision has been included for a framework extension of up to two years (taking the maximum framework duration to six years) to enable alignment with potential changes to the Environment Agency's funding programme and offers some resilience in the context of Local Government Reorganisation (LGR) and the potential for increased procurement demand in the early years of new authorities, but a need to continue to maintain sea defence assets.\nThe two-year extension provision was openly included in the PME documentation shared with users and the market and no objections or concerns were raised through feedback received."
},
"hasRenewal": true,
"description": "PURPOSE\nThis Lot will focus on smaller, non-complex works, such as maintenance and repairs, that will generally be local authority funded.\nCORE SCOPE\nThe following scope items are considered core to this Lot and will be tested at Framework level:\n•\tTimber structures, groynes & revetments \n•\tPrecast and insitu concrete works\n•\tRock works\n•\tEarth and flood embankments\n•\tFlood gates, boards and demountable defences\n•\tH&S issues and emergency works response\n•\tMarine, harbour, and river works\n•\tSlipways, promenades, steps and access ramps\nNON-CORE SCOPE\nThe following scope items can be called off via this Lot but may not have been sufficiently tested at Framework level:\n•\tDrainage infrastructure\n•\tHeritage works\n•\tIncidental beach management works\n•\tPiling works\n•\tEarly Contractor Involvement (ECI) \n•\tDesign responsibility \nVALUE\nTypical call-off value range\t£10k - £100k* \nMaximum contract value range\t£0k - £250k*\nOn occasion we may require works below £10k but these will be packaged up where possible. \nThere may also be occasional opportunities up to £250k where, for example, the works are non-complex but repetitive over a longer stretch of coast or repetitive over time.",
"identifiers": [
{
"id": "1a"
}
],
"secondStage": {
"maximumCandidates": 8,
"minimumCandidates": 4
},
"suitability": {
"sme": true
},
"awardCriteria": {
"criteria": [
{
"name": "Cost",
"type": "cost",
"numbers": [
{
"number": 20,
"weight": "percentageExact"
}
],
"description": "To be determined at tender stage, however the Cost element for each Lot will assess:\n•\tNEC4 fee percentages relevant to contract options applicable to each Lot, which could be multiple, that will be held for the Framework duration on a meet or beat basis\nNo rates will be set as part of the Framework."
},
{
"name": "Quality",
"type": "quality",
"numbers": [
{
"number": 80,
"weight": "percentageExact"
}
],
"description": "It is anticipated that the 80% quality weighting at the second stage will be divided as follows across two assessment areas: \n•\tTechnical Delivery (55%)\nTesting suppliers' approach to methodology, programme and resource against core scope requirements - achieved by using representative/typical hypothetical scenarios (and/or a live mini bid for Lot 2 but this is subject to final approvals); and\n•\tFramework Delivery (25%)\nTesting suppliers' approach and commitment to Framework delivery.\nHowever, these are subject to refinement of 5% in either direction on an overall cost/quality basis of 20/80 and would move proportionately if the overall tender cost/quality basis was to change up to 30/70.\nFull evaluation criteria will be defined upon the publication of the 2nd stage tender but will likely include the following themes and relative weightings for each of the quality assessment areas: \n•\tTechnical delivery - using 3 equally weighted scenarios \no\tMethodology (relative sub-weighting: 2)\no\tProgramme (relative sub-weighting: between 1 and 1.5)\no\tResource (relative sub-weighting: 1)\n•\tFramework delivery - across 5 equally weighted thematic areas\no\tFramework management\no\tQuality management\no\tSupplier Resilience\no\tSocial Value (including Sustainability)\no\tHealth & Safety"
}
]
},
"contractPeriod": {
"endDate": "2031-02-28T23:59:59Z",
"startDate": "2027-03-01T00:00:00Z",
"maxExtentDate": "2033-02-28T23:59:59Z"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "FINANCIAL CAPACITY\nFinancial capacity (from core supplier submission)\tPass/Fail\nConsortium/ Subcontracting\nWhere a consortium and / or sub-contracting is being significantly relied upon during the framework & to deliver the contracts, consortium members / sub-contractors must complete this Question and each achieve a Pass in respect of the Business Risk Assessment and combined Turnover of all parties must meet the criteria set out below. \nWhere a consortium and / or subcontractor is being relied upon to meet the financial capacity threshold, a direct contractual relationship in the form of a collateral warranty / Parent company Guarantee/ other contractual arrangement will be required as protection.\nBusiness Risk Assessment\nPass\nBusiness risk score calculated using Credit Safe financial ratios of 50 or above\nOr\nScore of 49 or less - subject to provision of a guarantee, from either a parent company, consortium member or a financial guarantor, provision subject to the guarantor financial institution achieving a business risk assessment score of 50 or above \nOr \nScore of 49 or less or where a Credit Safe score cannot be accurately obtained and/or no guarantor is available, satisfactory assessment of financial information provided against the following key factors: acid test, liquidity, retained profit, CCJ instances, bankruptcies, invoice payment performance\nFail: The response does not meet the criteria for a Pass.\nAND\nTurnover Assessment\nLatest turnover figures must be at least £500,000.\nIf Tenderers are unable to meet the minimum turnover levels but feel that they are able to demonstrate alternative evidence of financial capacity they are instructed to submit this asap via request for clarification in order that the Council may consider the information and provide a decision that will be final. \nWhere the contractor fails to meet the Turnover Assessment, Parent Company Guarantees may be considered where this allows them to meet the requirements. \nInsurance\tPass / Fail \nPlease confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:\n•\t£10M Public Liability each & every claim\n•\t£5M Employers Liability each & every claim\nNo Professional Indemnity is required although could be asked for at mini-competition stage if required for larger contracts."
},
{
"type": "technical",
"description": "RELEVANT EXPERIENCE and contract examples - Pass / Fail and scored - 100%\n(Refer to 'Criteria used to select suppliers to tender for this lot' section)\nHEALTH & SAFETY - Pass / Fail \n•\tSSIP Approved Contractor (Any member scheme)\n•\tHSE Enforcement / Remedial Orders\n•\tProsecution & Enforcement\n•\tHSE FFI Charges\nMODERN SLAVERY - Pass / Fail\nConfirmation that the bidder and any subcontractor they are relying on to satisfy the conditions of participation, is a 'relevant commercial organisation' and has a statement, policy, etc. in place that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request. \nOr\nConfirmation that the bidder is not a 'relevant commercial organisation' but still has OR can commit to having a statement, policy, etc. in place within 1 year of framework commencement, that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request.\nSUSTAINABILITY - Pass/Fail\nConfirmation that the Supplier has evidence of a sustainability policy (or equivalent)."
},
{
"description": "Relevant experience - Pass / Fail and scored - 100%\nA minimum of 4 and a maximum of 5 contract case studies relating to works completed or are currently being completed within the past 5 years must be submitted using the Contract Case Study template provided.\nEach Contract Case Study requires validation external to the Suppliers' organisation regarding the accuracy of information provided.\nMultiple case studies that apply to the same client organisation are permitted as long as each example relates to a discrete contract. \nThe case studies will firstly be assessed holistically and must demonstrate evidence of meeting the Minimum requirements stated in this section to pass.\nSuppliers that pass the minimum requirements will then have their case studies scored, in accordance with the scoring methodology set out in the COP document.\nExperience Elements - Lot 1A\nLot 1a Minimum Requirements (MR) - pass/fail\t\nMR1\tAt least 3 of the case studies must concern coastal works within a tidal area.\nMR2\tAt least 1 example of concrete repairs (examples could include but limited to spalled concrete or voiding)\t\nMR3\tAt least 1 example of sea defence timber repair (examples could range from plank replacement to new piles)\t\nMR4\tAt least 2 of the case studies must demonstrate experience delivering work packages with values ranging from £50,000 - £150,000. (If subcontracted as part of larger project, this value is for piece of work undertaken by your organisation)\nLot 1a Additional Experience (AE) - scored\t\nAE1\tEvidence of delivering rock works (for example rock gabions and placed rock armour)\nAE2\tEvidence of delivering flood embankments placing impermeable materials to fixed levels\nAE3\tEvidence of delivering flood gates, flood boards and demountable defences\nAE4\tEvidence of delivering emergency flood and erosion works response.\nAE5\tEvidence of delivering marine, harbour, and river works\nAE6\tEvidence of delivering slipways, promenades, coastal steps and ramps",
"forReduction": true
}
]
}
},
{
"id": "1b",
"title": "Lot 1b - General Coastal & Flood Civil Engineering Works",
"value": {
"amount": 30000000,
"currency": "GBP",
"amountGross": 36000000
},
"status": "active",
"renewal": {
"description": "The Framework contract will start as close to 1st March 2027 as possible and operate for an initial term of four years. \nProvision has been included for a framework extension of up to two years (taking the maximum framework duration to six years) to enable alignment with potential changes to the Environment Agency's funding programme and offers some resilience in the context of Local Government Reorganisation (LGR) and the potential for increased procurement demand in the early years of new authorities, but a need to continue to maintain sea defence assets.\nThe two-year extension provision was openly included in the PME documentation shared with users and the market and no objections or concerns were raised through feedback received."
},
"hasRenewal": true,
"description": "PURPOSE\nWorks under this Lot would generally be capitally funded projects, requiring the full suite of consents and approvals, and be notifiable under CDM. \nCall-offs under this Lot could include works such as:\n•\treplacement or significant repair of aging or damaged defences \n•\tconstruction of new defences.\nCORE SCOPE\nThe following scope items are considered core to this Lot and will be tested at Framework level:\n•\tTimber structures, groynes & revetments \n•\tPrecast and insitu concrete works \n•\tRock works \n•\tEarth and flood embankments\n•\tFlood gates, boards and demountable defences\n•\tH&S issues and emergency works response\n•\tMarine, harbour, and river works \n•\tSlipways, promenades, steps and access ramps\n•\tRealignment and habitat creation\n•\tHeritage works \n•\tPiling works \nNON-CORE SCOPE\nThe following scope items can be called off via this Lot but may not have been sufficiently tested at Framework level:\n•\tDrainage infrastructure\n•\tIncidental beach management works\n•\tNatural Flood Management \n•\tEarly Contractor Involvement (ECI) \n•\tDesign responsibility/Principal Designer \nVALUE\nTypical call-off value range \t£250k* - £5M \nMaximum contract value range\t£100k* up to £10M\nOn occasion works of a more complex nature but lower value may be required taking the contract below the typical value range of £250k.\n* Note for Lots 1a and 1b: For call-offs estimated between £100k - £250k, Lots 1a and 1b 'dovetail' into one another and Contracting Authorities have the flexibility to use either Lot at their discretion, based on the complexity and risks associated with the work scope.\nThere may also be occasional opportunities for contracts in excess of FTS threshold values if the Framework is deemed the best route to market for the requirement.",
"secondStage": {
"maximumCandidates": 8,
"minimumCandidates": 4
},
"suitability": {
"sme": true
},
"awardCriteria": {
"criteria": [
{
"name": "Cost",
"type": "cost",
"numbers": [
{
"number": 20,
"weight": "percentageExact"
}
],
"description": "To be determined at tender stage, however the Cost element for each Lot will assess:\n•\tNEC4 fee percentages relevant to contract options applicable to each Lot, which could be multiple, that will be held for the Framework duration on a meet or beat basis\nNo rates will be set as part of the Framework."
},
{
"name": "Quality",
"type": "quality",
"numbers": [
{
"number": 80,
"weight": "percentageExact"
}
],
"description": "It is anticipated that the 80% quality weighting at the second stage will be divided as follows across two assessment areas: \n•\tTechnical Delivery (55%)\nTesting suppliers' approach to methodology, programme and resource against core scope requirements - achieved by using representative/typical hypothetical scenarios (and/or a live mini bid for Lot 2 but this is subject to final approvals); and\n•\tFramework Delivery (25%)\nTesting suppliers' approach and commitment to Framework delivery.\nHowever, these are subject to refinement of 5% in either direction on an overall cost/quality basis of 20/80 and would move proportionately if the overall tender cost/quality basis was to change up to 30/70.\nFull evaluation criteria will be defined upon the publication of the 2nd stage tender but will likely include the following themes and relative weightings for each of the quality assessment areas: \n•\tTechnical delivery - using 3 equally weighted scenarios \no\tMethodology (relative sub-weighting: 2)\no\tProgramme (relative sub-weighting: between 1 and 1.5)\no\tResource (relative sub-weighting: 1)\n•\tFramework delivery - across 5 equally weighted thematic areas\no\tFramework management\no\tQuality management\no\tSupplier Resilience\no\tSocial Value (including Sustainability)\no\tHealth & Safety"
}
]
},
"contractPeriod": {
"endDate": "2031-02-28T23:59:59Z",
"startDate": "2027-03-01T00:00:00Z",
"maxExtentDate": "2033-02-28T23:59:59Z"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "FINANCIAL CAPACITY\nFinancial capacity (from core supplier submission)\tPass/Fail\nConsortium/ Subcontracting\nWhere a consortium and / or sub-contracting is being significantly relied upon during the framework & to deliver the contracts, consortium members / sub-contractors must complete this Question and each achieve a Pass in respect of the Business Risk Assessment and combined Turnover of all parties must meet the criteria set out below. \nWhere a consortium and / or subcontractor is being relied upon to meet the financial capacity threshold, a direct contractual relationship in the form of a collateral warranty / Parent company Guarantee/ other contractual arrangement will be required as protection.\nBusiness Risk Assessment\nPass\nBusiness risk score calculated using Credit Safe financial ratios of 50 or above\nOr\nScore of 49 or less - subject to provision of a guarantee, from either a parent company, consortium member or a financial guarantor, provision subject to the guarantor financial institution achieving a business risk assessment score of 50 or above \nOr \nScore of 49 or less or where a Credit Safe score cannot be accurately obtained and/or no guarantor is available, satisfactory assessment of financial information provided against the following key factors: acid test, liquidity, retained profit, CCJ instances, bankruptcies, invoice payment performance\nFail: The response does not meet the criteria for a Pass.\nAND\nTurnover Assessment\nLatest turnover figures must be at least £8m\nIf Tenderers are unable to meet the minimum turnover levels but feel that they are able to demonstrate alternative evidence of financial capacity they are instructed to submit this asap via request for clarification in order that the Council may consider the information and provide a decision that will be final. \nWhere the contractor fails to meet the Turnover Assessment, Parent Company Guarantees may be considered where this allows them to meet the requirements. \nInsurance\tPass / Fail \nPlease confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:\n•\t£10M Public Liability each & every claim\n•\t£5M Employers Liability each & every claim\n•\t£1m Professional Indemnity (Relating to claims or series of claims arising out of one event, which must be maintained for a period of 12 years after the defects period of the final works phase)"
},
{
"type": "technical",
"description": "RELEVANT EXPERIENCE and contract examples - Pass / Fail and scored - 100%\n(Refer to 'Criteria used to select suppliers to tender for this lot' section)\nHEALTH & SAFETY - Pass / Fail \n•\tSSIP Approved Contractor (Any member scheme)\n•\tHSE Enforcement / Remedial Orders\n•\tProsecution & Enforcement\n•\tHSE FFI Charges\nMODERN SLAVERY - Pass / Fail\nConfirmation that the bidder and any subcontractor they are relying on to satisfy the conditions of participation, is a 'relevant commercial organisation' and has a statement, policy, etc. in place that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request. \nOr\nConfirmation that the bidder is not a 'relevant commercial organisation' but still has OR can commit to having a statement, policy, etc. in place within 1 year of framework commencement, that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request.\nSUSTAINABILITY - Pass/Fail\nEvidence of ISO14001 (or equivalent) or working towards to have in place within 1 year of Framework start date.\nACCREDITATIONS - Pass/Fail\nEvidence of ISO9001 (or equivalent) or working towards to have in place within 1 year of Framework start date.\nABI performance bond - Info only\nWhilst not required to be held at Framework level, Suppliers on Lot 1b should be aware that an ABI Performance Bond of a value circa 10% of project value may be required for call-off contracts in excess of £5M. Any such requirement would be made clear in call-off documentation on a project specific basis."
},
{
"description": "Relevant experience - Pass / Fail and scored - 100%\nA minimum of 4 and a maximum of 5 contract case studies relating to works completed or are currently being completed within the past 5 years must be submitted using the Contract Case Study template provided.\nEach Contract Case Study requires validation external to the Suppliers' organisation regarding the accuracy of information provided.\nMultiple case studies that apply to the same client organisation are permitted as long as each example relates to a discrete contract. \nThe case studies will firstly be assessed holistically and must demonstrate evidence of meeting the Minimum requirements stated in this section to pass.\nSuppliers that pass the minimum requirements will then have their case studies scored, in accordance with the scoring methodology set out in the COP document.\nExperience Elements for LOT 1B\nLot 1b Minimum Requirements (MR) - pass/fail\nMR1 - At least 3 of the case studies must be within a tidal area. \nMR2 - At least 1 example of asset refurbishment and/or replacement (i.e. returning an asset to its design performance or replacing like for like) \nMR3 - At least 1 example of a new open coast defence asset - examples could include but not limited to a new sea wall, groyne fields or multiple structures \nMR4 - At least 1 example of an estuary or harbour works - examples could include port works, jetties, flood walls, outfalls \nMR5 - At least 1 example of using NEC4 ECC - any option. \nMR6 - At least 2 of the case studies must demonstrate experience delivering contracts as Principal Contractor, as defined in CDM 2015, with values ranging from £250,000 - £5,000,000. (If subcontracted as part of larger project, this value is for piece of work undertaken by your organisation) \nLot 1b Additional Experience (AE) - scored\nAE1 - Evidence of timber retaining for example, timber groynes & timber revetments \nAE2 - Evidence of precast and insitu concrete works to form seawalls or promenades \nAE3 - Evidence of delivering heavy graded rock armour work) \nAE4 - Evidence of delivering flood embankments placing impermeable materials to fixed levels \nAE5 - Evidence of delivering flood gates, flood boards and demountable defences \nAE6 - Evidence of delivering emergency flood and erosion works response and managing public safety \nAE7 - Evidence of delivering slipways, promenades, coastal steps and ramps \nAE8 - Evidence of realignment and habitat creation, where defences are removed to enable the sea to flood the land. \nAE9 - Evidence of Heritage works using approved conservation materials and methods. \nAE10 - Evidence of piling works, steel sheet or timber to provide a retaining structure.",
"forReduction": true
}
]
}
},
{
"id": "2",
"title": "Lot 2 - Specialist Beach Management Works",
"value": {
"amount": 6000000,
"currency": "GBP",
"amountGross": 7200000
},
"status": "active",
"renewal": {
"description": "The Framework contract will start as close to 1st March 2027 as possible and operate for an initial term of four years. \nProvision has been included for a framework extension of up to two years (taking the maximum framework duration to six years) to enable alignment with potential changes to the Environment Agency's funding programme and offers some resilience in the context of Local Government Reorganisation (LGR) and the potential for increased procurement demand in the early years of new authorities, but a need to continue to maintain sea defence assets.\nThe two-year extension provision was openly included in the PME documentation shared with users and the market and no objections or concerns were raised through feedback received."
},
"hasRenewal": true,
"description": "CORE SCOPE\nThe following scope items are considered core to this Lot and will be tested at Framework level:\n•\tBeach management works\n•\tExcavation, haulage, deposition, profiling and screening of beach material\n•\tGround works associated with flood and coastal risk management\n•\tH&S issues and emergency works response\n•\tLand based importing of suitable beach material from external sources\n•\tSlipways, promenades, steps and access ramps\nNON-CORE SCOPE\nThe following scope items can be called off via this Lot but may not have been sufficiently tested at Framework level:\n•\tIncidental general coastal & flood civil engineering works\n•\tDesign responsibility/Principal Designer \n•\tShore based support of marine based importing of material from external sources. \nVALUE\nTypical call-off value range and rationale\t£50k - £1M\nMaximum contract value range\t£0k - £5M",
"secondStage": {
"maximumCandidates": 8,
"minimumCandidates": 4
},
"suitability": {
"sme": true
},
"awardCriteria": {
"criteria": [
{
"name": "Cost",
"type": "cost",
"numbers": [
{
"number": 20,
"weight": "percentageExact"
}
],
"description": "To be determined at tender stage, however the Cost element for each Lot will assess:\n•\tNEC4 fee percentages relevant to contract options applicable to each Lot, which could be multiple, that will be held for the Framework duration on a meet or beat basis\n•\tContractual priced submission if live mini bid used \nNo rates will be set as part of the Framework.\nIt is currently subject to approvals if a live mini bid will be used at tender stage for Lot 2, but, if this is the case, it is likely that Lot 2 would be assessed on an overall cost/quality basis of 30/70 instead of 20/80 and not use any scenarios for qualitative assessment. Instead, the full quality weighting available for Technical Delivery would be used to assess quality of the live mini bid and the additional 10% allocated to cost would allow for assessment of a contractual price of the live mini bid alongside Framework fee percentages."
},
{
"name": "Quality",
"type": "quality",
"numbers": [
{
"number": 80,
"weight": "percentageExact"
}
],
"description": "It is anticipated that the 80% quality weighting at the second stage will be divided as follows across two assessment areas: \n•\tTechnical Delivery (55%)\nTesting suppliers' approach to methodology, programme and resource against core scope requirements - achieved by using representative/typical hypothetical scenarios (and/or a live mini bid for Lot 2 but this is subject to final approvals); and\n•\tFramework Delivery (25%)\nTesting suppliers' approach and commitment to Framework delivery.\nHowever, these are subject to refinement of 5% in either direction on an overall cost/quality basis of 20/80 and would move proportionately if the overall tender cost/quality basis was to change up to 30/70.\nFull evaluation criteria will be defined upon the publication of the 2nd stage tender but will likely include the following themes and relative weightings for each of the quality assessment areas: \n•\tTechnical delivery - using 3 equally weighted scenarios \no\tMethodology (relative sub-weighting: 2)\no\tProgramme (relative sub-weighting: between 1 and 1.5)\no\tResource (relative sub-weighting: 1)\n•\tFramework delivery - across 5 equally weighted thematic areas\no\tFramework management\no\tQuality management\no\tSupplier Resilience\no\tSocial Value (including Sustainability)\no\tHealth & Safety"
}
]
},
"contractPeriod": {
"endDate": "2031-02-28T23:59:59Z",
"startDate": "2027-03-01T00:00:00Z",
"maxExtentDate": "2033-02-28T23:59:59Z"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "FINANCIAL CAPACITY\nFinancial capacity (from core supplier submission)\tPass/Fail\nConsortium/ Subcontracting\nWhere a consortium and / or sub-contracting is being significantly relied upon during the framework & to deliver the contracts, consortium members / sub-contractors must complete this Question and each achieve a Pass in respect of the Business Risk Assessment and combined Turnover of all parties must meet the criteria set out below. \nWhere a consortium and / or subcontractor is being relied upon to meet the financial capacity threshold, a direct contractual relationship in the form of a collateral warranty / Parent company Guarantee/ other contractual arrangement will be required as protection.\nBusiness Risk Assessment\nPass\nBusiness risk score calculated using Credit Safe financial ratios of 50 or above\nOr\nScore of 49 or less - subject to provision of a guarantee, from either a parent company, consortium member or a financial guarantor, provision subject to the guarantor financial institution achieving a business risk assessment score of 50 or above \nOr \nScore of 49 or less or where a Credit Safe score cannot be accurately obtained and/or no guarantor is available, satisfactory assessment of financial information provided against the following key factors: acid test, liquidity, retained profit, CCJ instances, bankruptcies, invoice payment performance\nFail: The response does not meet the criteria for a Pass.\nAND\nTurnover Assessment\nLatest turnover figures must be at least £1,000,000.\nIf Tenderers are unable to meet the minimum turnover levels but feel that they are able to demonstrate alternative evidence of financial capacity they are instructed to submit this asap via request for clarification in order that the Council may consider the information and provide a decision that will be final. \nWhere the contractor fails to meet the Turnover Assessment, Parent Company Guarantees may be considered where this allows them to meet the requirements. \nInsurance\tPass / Fail \nPlease confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:\n•\t£10M Public Liability each & every claim\n•\t£5M Employers Liability each & every claim\nNo Professional Indemnity is required although could be asked for at mini-competition stage if required for larger contracts."
},
{
"type": "technical",
"description": "RELEVANT EXPERIENCE and contract examples - Pass / Fail and scored - 100%\n(Refer to 'Criteria used to select suppliers to tender for this lot' section)\nHEALTH & SAFETY - Pass / Fail \n•\tSSIP Approved Contractor (Any member scheme)\n•\tHSE Enforcement / Remedial Orders\n•\tProsecution & Enforcement\n•\tHSE FFI Charges\nMODERN SLAVERY - Pass / Fail\nConfirmation that the bidder and any subcontractor they are relying on to satisfy the conditions of participation, is a 'relevant commercial organisation' and has a statement, policy, etc. in place that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request. \nOr\nConfirmation that the bidder is not a 'relevant commercial organisation' but still has OR can commit to having a statement, policy, etc. in place within 1 year of framework commencement, that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request.\nSUSTAINABILITY - Pass/Fail\nConfirmation that the Supplier has evidence of a sustainability policy (or equivalent)."
},
{
"description": "Relevant experience - Pass / Fail and scored - 100%\nA minimum of 4 and a maximum of 5 contract case studies relating to works completed or are currently being completed within the past 5 years must be submitted using the Contract Case Study template provided.\nEach Contract Case Study requires validation external to the Suppliers' organisation regarding the accuracy of information provided.\nMultiple case studies that apply to the same client organisation are permitted as long as each example relates to a discrete contract. \nThe case studies will firstly be assessed holistically and must demonstrate evidence of meeting the Minimum requirements stated in this section to pass.\nSuppliers that pass the minimum requirements will then have their case studies scored, in accordance with the scoring methodology set out in the COP document.\nExperience Elements for LOT 2\nLot 2 Minimum Requirements (MR) - pass/fail\t\nMR1 - At least 2 case studies must be coastal works demonstrating working and planning within the tidal cycle and its constraints . \nMR2 - At least 1 example of movement and placement of insitu beach materials for flood and coastal protection purposes. \nMR3 - At least 1 example of coastal ancillary works -clearance of and/or maintaining access for; outfalls, slipways, promenades, access steps or access ramps. \nMR4 - At least 1 example of safe management of the public in and around works using large construction equipment. \nMR5 - At least 2 of the case studies must demonstrate experience delivering contracts as Principal Contractor, as defined in CDM 2015, with values ranging from £50,000-£500k. (If subcontracted as part of larger project, this value is for piece of work undertaken by your organisation) \nLot 2 Additional Experience (AE) - scored\t\nAE1 - Evidence of using NEC4 ECC/ESCS and/or TSC/TSSC - any option. \nAE2 - Evidence of excavation, haulage, deposition, profiling and screening of beach material for flood defence purposes. \nAE3 - Evidence of ground works associated with flood and coastal risk management \nAE4 - Evidence of undertaking emergency beach management works response to achieve a design beach profile - demonstrating ability to be agile and responding quickly and manage public safety. \nAE5 - Evidence of land-based importing of suitable beach material from external sources and transporting this to the beach face. \nAE6 - Evidence of delivering slipways, promenades, coastal steps and ramp beach clearance.",
"forReduction": true
}
]
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKJ21",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ22",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ27",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ28",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ3",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ4",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKK15",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45111200",
"scheme": "CPV",
"description": "Site preparation and clearance work"
},
{
"id": "45111210",
"scheme": "CPV",
"description": "Blasting and associated rock-removal work"
},
{
"id": "45111230",
"scheme": "CPV",
"description": "Ground-stabilisation work"
},
{
"id": "45111240",
"scheme": "CPV",
"description": "Ground-drainage work"
},
{
"id": "45111250",
"scheme": "CPV",
"description": "Ground investigation work"
},
{
"id": "45112100",
"scheme": "CPV",
"description": "Trench-digging work"
},
{
"id": "45112200",
"scheme": "CPV",
"description": "Soil-stripping work"
},
{
"id": "45112300",
"scheme": "CPV",
"description": "Infill and land-reclamation work"
},
{
"id": "45112360",
"scheme": "CPV",
"description": "Land rehabilitation work"
},
{
"id": "45112400",
"scheme": "CPV",
"description": "Excavating work"
},
{
"id": "45112500",
"scheme": "CPV",
"description": "Earthmoving work"
},
{
"id": "45112600",
"scheme": "CPV",
"description": "Cut and fill"
},
{
"id": "45112700",
"scheme": "CPV",
"description": "Landscaping work"
},
{
"id": "45120000",
"scheme": "CPV",
"description": "Test drilling and boring work"
},
{
"id": "45223500",
"scheme": "CPV",
"description": "Reinforced-concrete structures"
},
{
"id": "45232450",
"scheme": "CPV",
"description": "Drainage construction works"
},
{
"id": "45232451",
"scheme": "CPV",
"description": "Drainage and surface works"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233200",
"scheme": "CPV",
"description": "Various surface works"
},
{
"id": "45233253",
"scheme": "CPV",
"description": "Surface work for footpaths"
},
{
"id": "45243000",
"scheme": "CPV",
"description": "Coastal-defence works"
},
{
"id": "45246000",
"scheme": "CPV",
"description": "River regulation and flood control works"
},
{
"id": "45252124",
"scheme": "CPV",
"description": "Dredging and pumping works"
},
{
"id": "45252125",
"scheme": "CPV",
"description": "Rock-dumping work"
}
]
},
{
"id": "1b",
"relatedLot": "1b",
"deliveryAddresses": [
{
"region": "UKJ21",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ22",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ27",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ28",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ3",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ4",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKK15",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45111200",
"scheme": "CPV",
"description": "Site preparation and clearance work"
},
{
"id": "45111210",
"scheme": "CPV",
"description": "Blasting and associated rock-removal work"
},
{
"id": "45111230",
"scheme": "CPV",
"description": "Ground-stabilisation work"
},
{
"id": "45111240",
"scheme": "CPV",
"description": "Ground-drainage work"
},
{
"id": "45111250",
"scheme": "CPV",
"description": "Ground investigation work"
},
{
"id": "45112100",
"scheme": "CPV",
"description": "Trench-digging work"
},
{
"id": "45112200",
"scheme": "CPV",
"description": "Soil-stripping work"
},
{
"id": "45112300",
"scheme": "CPV",
"description": "Infill and land-reclamation work"
},
{
"id": "45112360",
"scheme": "CPV",
"description": "Land rehabilitation work"
},
{
"id": "45112400",
"scheme": "CPV",
"description": "Excavating work"
},
{
"id": "45112500",
"scheme": "CPV",
"description": "Earthmoving work"
},
{
"id": "45112600",
"scheme": "CPV",
"description": "Cut and fill"
},
{
"id": "45112700",
"scheme": "CPV",
"description": "Landscaping work"
},
{
"id": "45120000",
"scheme": "CPV",
"description": "Test drilling and boring work"
},
{
"id": "45223500",
"scheme": "CPV",
"description": "Reinforced-concrete structures"
},
{
"id": "45232450",
"scheme": "CPV",
"description": "Drainage construction works"
},
{
"id": "45232451",
"scheme": "CPV",
"description": "Drainage and surface works"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233200",
"scheme": "CPV",
"description": "Various surface works"
},
{
"id": "45233253",
"scheme": "CPV",
"description": "Surface work for footpaths"
},
{
"id": "45243000",
"scheme": "CPV",
"description": "Coastal-defence works"
},
{
"id": "45246000",
"scheme": "CPV",
"description": "River regulation and flood control works"
},
{
"id": "45252124",
"scheme": "CPV",
"description": "Dredging and pumping works"
},
{
"id": "45252125",
"scheme": "CPV",
"description": "Rock-dumping work"
}
]
},
{
"id": "2",
"relatedLot": "2",
"deliveryAddresses": [
{
"region": "UKJ21",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ22",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ27",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ28",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ3",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ4",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKK15",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45111200",
"scheme": "CPV",
"description": "Site preparation and clearance work"
},
{
"id": "45111210",
"scheme": "CPV",
"description": "Blasting and associated rock-removal work"
},
{
"id": "45111230",
"scheme": "CPV",
"description": "Ground-stabilisation work"
},
{
"id": "45111240",
"scheme": "CPV",
"description": "Ground-drainage work"
},
{
"id": "45111250",
"scheme": "CPV",
"description": "Ground investigation work"
},
{
"id": "45112100",
"scheme": "CPV",
"description": "Trench-digging work"
},
{
"id": "45112200",
"scheme": "CPV",
"description": "Soil-stripping work"
},
{
"id": "45112300",
"scheme": "CPV",
"description": "Infill and land-reclamation work"
},
{
"id": "45112360",
"scheme": "CPV",
"description": "Land rehabilitation work"
},
{
"id": "45112400",
"scheme": "CPV",
"description": "Excavating work"
},
{
"id": "45112500",
"scheme": "CPV",
"description": "Earthmoving work"
},
{
"id": "45112600",
"scheme": "CPV",
"description": "Cut and fill"
},
{
"id": "45112700",
"scheme": "CPV",
"description": "Landscaping work"
},
{
"id": "45120000",
"scheme": "CPV",
"description": "Test drilling and boring work"
},
{
"id": "45223500",
"scheme": "CPV",
"description": "Reinforced-concrete structures"
},
{
"id": "45232450",
"scheme": "CPV",
"description": "Drainage construction works"
},
{
"id": "45232451",
"scheme": "CPV",
"description": "Drainage and surface works"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233200",
"scheme": "CPV",
"description": "Various surface works"
},
{
"id": "45233253",
"scheme": "CPV",
"description": "Surface work for footpaths"
},
{
"id": "45243000",
"scheme": "CPV",
"description": "Coastal-defence works"
},
{
"id": "45246000",
"scheme": "CPV",
"description": "River regulation and flood control works"
},
{
"id": "45252124",
"scheme": "CPV",
"description": "Dredging and pumping works"
},
{
"id": "45252125",
"scheme": "CPV",
"description": "Rock-dumping work"
}
]
}
],
"title": "SCG / SCOPAC Coastal & Flood Works Framework 2027",
"value": {
"amount": 75000000,
"currency": "GBP",
"amountGross": 90000000
},
"status": "active",
"coveredBy": [
"GPA",
"CPTPP"
],
"documents": [
{
"id": "conflictOfInterest",
"description": "Not published",
"documentType": "conflictOfInterest"
},
{
"id": "064413-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/064413-2026",
"format": "text/html",
"noticeType": "UK4",
"description": "Tender notice on Find a Tender",
"documentType": "tenderNotice",
"datePublished": "2026-07-08T17:41:00+01:00"
}
],
"procedure": {
"features": "Portsmouth City Council, (the Council) has decided to utilise a two-stage Competitive Flexible Procedure to establish 3 lots under the framework, consisting of the following stages: \n• Stage 1 - a discrete Conditions of Participation stage to limit the number of suppliers to a maximum of 8 per lot.\n • Stage 2 - a Tendering Round with up to the top 6 suppliers being awarded a place on each lot of the framework (Up to 4 suppliers on tier 1, and 2 suppliers on tier 2).\nStage 1 - Conditions of Participation Stage This stage focuses on shortlisting suppliers that meet the necessary technical, financial, and operational capabilities required by the contract. It aims to reduce the number of bidders through consideration of meeting the conditions of participation and level of relevant experience and contract examples. \nIn the event that there are less than eight suppliers who meet the Conditions of Participation criteria for any Lot, the Council reserve the right to:\n•\tproceed to the second stage of the tender process for that Lot regardless, providing there are more than four qualifying suppliers; or\n•\tremove the impacted Lot from the Framework, if less than four qualifying suppliers, without impact on the remainder of the Lots progressing through the procurement process\nThe Council also reserves the right to determine the final number of contractors appointed to each Lot and the structure of tiering. This may include (but is not limited to) establishing a Lot without a Reserve Tier, where this is considered appropriate based on the number and quality of compliant tenders received. As a minimum for Framework viability, a Lot must contain a minimum of 2 Delivery Tier suppliers\nAny interested suppliers will need to register on the governments Central Digital Platform for the Council to review any potential grounds for exclusion and conduct a debarment check. \nThe Council will be required to undertake checks on any named subcontractor a supplier incorporates into their bid. If the subcontractor was to meet the exclusion grounds and/or be listed on the debarment list, then the Council will need to investigate this as part of any award decision. The Council may require a supplier to change the nominated sub contractor if they do not meet the exclusion grounds and/or listed on the debarment list.\nStage 2 - Invitation to Tender (ITT) The second stage, shortlisted suppliers are invited to submit detailed proposals, including price in line with the stated, delivery methodology. The Council are envisioning applying a cost/quality weighting of 20% cost/80% quality for the second stage tender evaluation. However, this split is indicative and the Council reserves its right to refine award criteria during the procurement procedure and to adopt a Cost/Quality split up to 30/70, which may differ between Lots. \nThe specific weightings for the proposed cost & quality criteria are to be detailed on issue of ITT, however will fall within the ranges stated within the Lot sections of this notice.\nThe Council are intending to follow the subsequent Procurement Programme:\nPSQ published via Intend\t 8th July 2026\nTender notice issued on fts 8th July 2026\nBidders Briefing 16th July 2026 @ 1pm \nPSQ return deadline\t 14th August 2026 @ 12 noon\nPSQ evaluations complete\t 21st September 2026 \nTender published via Intend\t 28th September 2026\nTender clarification deadline 10th November 2026 @ 12noon\nTender return deadline \t 20th November 2026 @ 12 noon\nIssue assessment summaries \t22nd January 2027\nContract Award notice on FTS 22nd January 2027\nEnd of standstill\t 3rd February 2027\nFramework Award\t 8th February 2027 \nFramework Start Date\t 1st March 2027\nBIDDERS BRIEFING\nA supplier briefing for Stage 1 will be held on Thursday 16th July at 1pm via Microsoft TEAMS. \nAttendance is not compulsory and not taking part will not preclude Suppliers from taking part in Stage 1 of the procurement exercise. \nTo assist with record keeping and enabling us to provide technical assistance on the day if required, please inform the Council by Wednesday 15th July 2026 at 5pm who will be attending using the correspondence function on Intend.\nLink to join the briefing is within the Conditions of Participation documentation."
},
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"recurrence": {
"dates": [
{
"startDate": "2032-08-28T23:59:59+01:00"
}
]
},
"techniques": {
"frameworkAgreement": {
"type": "open",
"method": "withAndWithoutReopeningCompetition",
"description": "MAMIMUM NUMBER OFSUPPLIERS AND TIERING \nMaximum Number of suppliers on the framework is 6 per lot, which if different suppliers are appointed onto each of the lots, may result in a maximum of 18 suppliers being allocated onto the framework in total. Refer to scope for fuller details.\nIdeally each Lot will consist of a Delivery Tier of 4 contractors and a Reserve Tier of 2 contractors. The definitions of which are:\n•\tDelivery Tier: the top 4 ranked contractors from framework tender stage who will deliver the framework under normal operating conditions.\n•\tReserve Tier: the 5th and 6th ranked contractors from framework tender stage that may be called upon in exceptional circumstances or moved up into the Delivery Tier in the event that a contractor is removed, or removes themselves, from the Delivery Tier on a permanent or temporary basis. This tier provides framework contingency only and will not be actively managed.\nHowever, the Council reserves the right, at its sole discretion, to determine the final number of contractors appointed to each Lot and the structure of tiering. This may include (but is not limited to) establishing a Lot without a Reserve Tier, where this is considered appropriate based on the number and quality of compliant tenders received.\nAs a minimum for Framework viability, a Lot must contain a minimum of 2 Delivery Tier suppliers.\nPRICING\nEach Lot will have NEC4 fee percentages set at Framework level on a meet or beat basis for the duration of the Framework for NEC4 contracts and payment options most likely to be used for that Lot. \nNo further rates such as prelims, material rates etc will apply at Framework level and all pricing at call-off stage will be managed via mini-competition. \nCALL OFF MECHANISMS\nMini competition\nThe default option for the Framework will be to use a mini-competition process to award a contract.\nFor a mini competition, Contracting Authorities would be required to produce and issue an Invitation to Bid document to all Suppliers named on the Lot (or Lots) appropriate to the work scope and value. \nEvaluation criteria will be applied on a project-by-project basis dependant on the nature of the works and the contracting strategy required and will not necessarily follow the same weightings as applied for establishing the Framework. \nFor mini-competitions, Contracting Authorities may choose to focus evaluation on cost only or include a mixture of cost and quality elements, as below:\n•\tCost Only or Cost Focused Bid - Project specific cost element makes up 80% - 100% of the evaluation. Quality elements may be asked for but assessed on a pass/fail basis or on a low weighting. This approach is most likely to be used on Lot 1a or possibly Lot 2 where the work scope is low value & low complexity.\n•\tCost and Quality Bid - Evaluation is split between project specific cost and quality elements (but not necessarily equally). \tEvaluation weightings are project specific and will likely differ from those used at Framework set-up. This approach will be used in most circumstances for Lots 1b and 2, and for more complex works Lot 1a where approaches to the work may significantly differ between Suppliers.\n•\tHigh Quality Focused Bid - Evaluation will focus on quality and experience. Application of the X22 Contracting Clause may apply. \nThe emphasis would be on building an integrated project delivery team, a design and build scheme or where a scheme is of high complexity or high quality. Likely to only be used for Lot 1b higher value longer term works.\nDirect Award options (all Lots)\nOn occasion, Direct Award options can be the most appropriate and/or economically advantageous route to market. Direct awards will predominantly be used for lower value shorter term emergency requirements, repeat work requirements, specialist works and award by ranking / rotation, etc. but could also be used for higher value longer term works, subject to legal diligence on objective justification and governance sign off. We are proposing to allow Direct Awards via the framework across all Lots under the following scenarios:\n - Urgent or emergency basis\n - Repeat Work Basis: Work development \n - Repeat Work Basis: Specialist work\nCALL-OFF FLEXIBILITIES \nFor call-offs estimated between £100k - £250k, it is proposed that Lots 1a and 1b 'dovetail' into one another and Contracting Authorities will have the flexibility to use either Lot at their sole discretion. The decision of which Lot to progress a call-off procedure with will mostly consider the complexity and risks associated with the work type/scope of the contract. Where appropriate an expression of interest may be used, however, a decision will result in the selection of one Lot and will progress a call-off with either Lot 1a OR Lot 1b and will not be a hybrid of the two.\nThe Framework will also likely allow for calls for competition using cross-Lot or cross-Tier features, mainly when the nature or value of the call-off was not tested at Framework set-up. It is not intended for this to be commonplace. In all instances an Expression of Interest and/or sifting brief would be used to establish a maximum shortlist of 4 suppliers to be invited to mini-competition.\nPERFORMANCE MANAGEMENT / KPIs\nThe detailed KPIs and scoring methodology will be set out within stage 2 tender documents. The KPIs will include for and develop upon the high-level structure set out below:\n• Time\n• Cost \n• Quality\n• Number of defects / Efficiency of managing defects identified \n• Communications, reporting & response\n• Health & Safety Management\n• Minimising Disruption, Site Logistics, Security & Access\n• Quality Management \n• Handover at Practical Completion\nThe Council will publish a Contract Performance Notice which summarises delivery performance against the finalised KPIs for any call off over £5m. \nThe Council will work in partnership with the appointed contractor and will review KPI performance with the contractor at regular intervals. The Council will seek to agree KPI scores with the contractor prior to issue of a Contract Performance Notice.\nIn the event of significant non-performance, such as significant persistent performance issues where reasonable opportunity has been provided to the contractor to address but has failed to do so, application of significant damages or other significant penalties,\ntermination (including partial termination) of the contract or the reaching of a settlement agreement between the parties, the Council will be required to issue a Performance Notice within 30 days of the breach in accordance with Section 71 of the Procurement Act 23.\nConsequences for performance will be detailed at tender stage but at high level will include for demotion to secondary tier, restriction of direct award opportunities, suspension from the framework agreement through to termination.",
"buyerCategories": "FRAMEWORK ACCESS\nThe Framework is being established primarily for use by SCG/SCOPAC member Contracting Authorities, which currently includes:\n• Bournemouth Christchurch and Poole (BCP) Council\n• Chichester District Council\n• Dorset Council\n• Eastleigh Borough Council\n• Fareham Borough Council\n• Gosport Borough Council\n• Hampshire County Council\n• Havant Borough Council\n• Isle of Wight Council\n• New Forest District Council\n• Portsmouth City Council\n• Southampton City Council\nThe framework will also be accessible to all Contracting Authorities within the Southern and Wessex Regional Flood and Coastal Committee's (Southern RFCC, Wessex RFCC), regardless of SCG/SCOPAC membership, which currently includes:\n• Hampshire\n• Dorset\n• West Sussex\n• East Sussex\n• Isle of Wight\n• Kent\n• Somerset\n• Wiltshire\nContracting Authorities under future iterations of SCG/SCOPAC membership and the Southern RFCC, will be able to access the Framework following changes as a result of LGR or other factors.",
"periodRationale": "The Framework contract will start as close to 1st March 2027 as possible and operate for an initial term of four years. \nProvision has been included for a framework extension of up to two years (taking the maximum framework duration to six years) to enable alignment with potential changes to the Environment Agency's funding programme and offers some resilience in the context of Local Government Reorganisation (LGR) and the potential for increased procurement demand in the early years of new authorities, but a need to continue to maintain sea defence assets.",
"maximumParticipants": 18,
"buyerLocationRestrictions": [
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ21"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ22"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ27"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ28"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ3"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ4"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKK15"
]
}
}
]
},
"hasFrameworkAgreement": true
},
"awardPeriod": {
"endDate": "2027-01-22T23:59:59Z"
},
"description": "Portsmouth City Council ('the council') on behalf of the Southern Coastal Group (SCG) and SCOPAC (Standing Conference on Problem Associated with the Coast), is inviting expressions of interest from suitably qualified contractors for inclusion onto a multi-contractor Coastal & Flood Works Framework Agreement. This framework will replace the existing SCG Minor Works Framework that is due to expire on 30th November 2026.\nThe Council s aiming to commence the framework from March 2027 which will run for a period of four years, with an option to extend for a further 2 years in increments to be agreed. \nThe framework will comprise of 3 lots: \n•\tLot 1a - Minor Coastal Civil Engineering Works. \n•\tLot 1b - General Coastal Civil Engineering Works. \n•\tLot 2 - Specialist beach management. \nContractors may apply for any or all of the 3 lots. Each framework lot will be made up of a primary tier of up to 4 contractors and a secondary tier of up to 2 contractors. The secondary tier will primarily be used on a contingency resource basis. \nStage 1 Application is via submission of a completed Procurement Selection Questionnaire (PSQ) by 14th August 2026 @ 12:00. The council anticipates shortlisting 8 contractors for each Lot from assessment of the returned PSQ submissions, who will then be invited to tender.\nThe value of the framework across both lots is estimated to be in the region of £25M - £75m over six years. \nFrom previous spend, and future demand from SCG Members and with consideration of proposed EA General Works grant aid funding rule changes expected in April this year, we are estimating annual Framework usage and values to be the following, however there is no guarantee of this volume of work and actual volumes and spend may be higher or lower:\nLot 1a - Estimated 10-20 call offs p/a, totalling £500k - £1m p/a\nLot 1b - Estimated 5-10 call offs p/a, totalling £2m-£5m p/a\nLot 2 - Estimated 5-10 call offs p/a, totalling £500k-£1m p/a\nThe average value of works called off via the framework for each Lot by SCG and SCOPAC is likely to range from:\n•\tLot 1a: £10k - £100k\n•\tLot 1b: £250k - £5m \n•\tLot 2: £50k - £1m\nHowever, there may also be commissions below £100k and on occasion in excess of £5m. Although it is unlikely that very high or very low value work will be procured via the agreement no upper or lower value constraints shall apply. \nCONTRACT TERMS\nThe framework will be let using NEC4 Framework Contract with following call-off options as appropriate:\n•\tNEC4 ECC and ECSC\n•\tNEC4 TSC and TSSC\n•\tStandard Authority PO T&Cs for low value, low complex works.\nSCOPE\nRefer to individual Lot information section of notice for details.\nESTABLISHMENT PROJECTS\nFor lot 1a and lot 1b the framework will be establish based upon a scenario project(s). The Council may establish lot 2 upon either a scenario project(s) also OR a live project. This is to be confirmed at tender stage.\nLOCAL GOVERNMENT REVIEW\nAs part of the wider Local Government Review (LGR), the Council is required to actively engage in discussions with neighbouring authorities to explore potential opportunities for collaboration, shared service delivery, and governance alignment. While this engagement is ongoing, no formal decisions or agreements have been reached at this stage.\nUnder current LGR proposals, it is likely to require Portsmouth City Council to form a new Authority by merging with other neighbouring Authorities. For Portsmouth, this will result in a new Council being created to provide the same services to everyone in the city, whilst covering a larger area and have a different name. Effectively all the current council services in the area of the new council boundary would be merged to create a new Council.\nThe government has announced its decision on Local Government Reorganisation on Wednesday 25th March 2026 that Portsmouth City Council will become part of a larger unitary authority that will cover the areas of Gosport, Fareham and Havant, and include Newlands, Horndean, Clanfield and Rowlands Castle.\nThe new unitary authority vesting date will be on 1st April 2028. \nIn the event of reorganisation, contracts will include clauses that allow for the assignment of the contract to successor authorities. Any assignment clause is likely to state any contract may be assigned to any new authority that succeeds the original contracting authority.\nFor further details in respect of LGR for the Council see the following link -\nhttps://www.portsmouth.gov.uk/services/council-and-democracy/devolution-and-plans-for- local-government-reorganisation/\nFor wider LGR information please refer to this link to the government page: Local government reorganisation: Policy and programme updates - GOV.UK",
"riskDetails": "MODIFICATIONS\nIf a modification cannot be defined as non-substantial and / or below threshold, the Council may still make modifications to the contract, not exceeding 50% of the latest contract value per modification, in respect the following situations:\n• Where the modification was transparently and unambiguously allowed for within the contract \n• Materialisation of a published known risk \n• Urgency & the protection of life \n• Unforeseeable circumstances which could not have been reasonably foreseen by the Council \n• Additional goods, works & services which are a repetition of items already covered within the scope of the contract and only where a change of contractor would significantly impact compatibility and result in significant in duplication of costs.\nIn such instances the Council will issue a Contract Change Notice each time a modification is made and publish an updated redacted version of the contract within 90 days of the modification. The Council may decide to include for a voluntary 8 working day standstill period from issuing a Contract Change Notice to subsequent modification of the contract in order to mitigate risk of challenge, although it will be under no legal obligation to do so. \nKNOWN RISKS\nThe detailed known risk will be set out within the tender documents; however the Council has identified the following known risk areas which could materialise over the course of the procurement process for this framework of its subsequent call-off contracts, framework lifetime and delivery of call off contracts over £5m and may significantly impact programme, cost and scope of the contracts. \n•\tEnvironment Agency funding - impacting volume of work, framework value and programme.\n•\tLocal Government Reorganisation - impacting User base and contract duration.\n•\tUnforeseen Ground or Marine Conditions such as discovery of adverse ground, geotechnical, or unexploded ordnance (UXO) conditions could impact scope, programme and cost. \n•\tSevere Weather Events / tidal anomalies which cause damage to works, equipment, or incomplete coastal defences that could impact scope, programme and cost. \n•\tContaminated Land - Identification of contaminated land before or during works could impact scope, programme and cost.\n•\tCondition of existing assets - Issues with existing asset structure and foundations found during works could impact scope, programme and cost.\n•\tProximity of an occupied site - Restrictions on work activities in order to minimise disruption to neighbours and other stakeholder could impact programme & cost.\n•\tUnrecorded underground services - Issues with service connections found during works could impact scope, programme and cost.\n•\tDiscovery of protected species on site or identification of protected species before or during works could impact programme and cost. \n•\tDelays to gaining planning approval could impact upon the procurement programme, contract award date and works commencement dates. \n•\tDesign changes required to meet planning conditions could impact upon scope, programme and costs. \nIn accordance with Schedule 8 of the Procurement Act 23, the Council reserves the right to modify any call off contract from this framework, without initiating a new procurement procedure, should any of these risks materialise during the procurement process and/or delivery of the contract. Any such modification will be limited to addressing the consequences of the known risk and will not alter the overall nature of the contract. Where\napplicable and required a modification to the Tender Notice or a Contract Change Notice will be published in accordance with the requirements of the Procurement Act.",
"enquiryPeriod": {
"endDate": "2026-08-04T12:00:00+01:00"
},
"hasRecurrence": true,
"aboveThreshold": true,
"submissionTerms": {
"languages": [
"en"
],
"electronicSubmissionPolicy": "allowed"
},
"participationFees": [
{
"id": "ocds-h6vhtk-065365",
"type": [
"win"
],
"description": "A framework rebate fee of 0.5% will be charged to suppliers who are awarded call-off contracts estimated to be £100,000 or more in total lifetime value.\nThe flat rate of 0.5% will be based on the estimated Total of the Prices for ECC/ECSCs or Forecast Outturn Cost for TSC/TSSCs, with a maximum fee of £10,000 per call-off.",
"relativeValue": {
"proportion": 0.005,
"monetaryValue": "award"
}
}
],
"procurementMethod": "selective",
"mainProcurementCategory": "works",
"submissionMethodDetails": "https://in-tendhost.co.uk/portsmouthcc/aspx/Home\nSuppliers who are not already registered on the In-tend system will need to register their details in order to access the procurement documentation, raise clarification requests and\nreturn tender submissions.",
"procurementMethodDetails": "Competitive flexible procedure",
"expressionOfInterestDeadline": "2026-08-14T12:00:00+01:00"
},
"parties": [
{
"id": "GB-PPON-PCNL-5714-PRZV",
"name": "Portsmouth City Council",
"roles": [
"buyer"
],
"address": {
"region": "UKJ31",
"country": "GB",
"locality": "Portsmouth",
"postalCode": "PO1 2AL",
"countryName": "United Kingdom",
"streetAddress": "Civic Offices, Guildhall Square"
},
"details": {
"url": "https://www.portsmouth.gov.uk",
"classifications": [
{
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE",
"description": "Public authority - sub-central government"
}
]
},
"identifier": {
"id": "PCNL-5714-PRZV",
"scheme": "GB-PPON"
},
"contactPoint": {
"name": "Procurement Service",
"email": "procurement@portsmouthcc.gov.uk",
"telephone": "442392688235"
}
}
],
"language": "en",
"initiationType": "tender"
}Complete JSON history (2 releases)
8 Jul 2026 · 064413-2026 · tender
{
"id": "064413-2026",
"tag": [
"tender"
],
"date": "2026-07-08T17:41:00+01:00",
"ocid": "ocds-h6vhtk-065365",
"buyer": {
"id": "GB-PPON-PCNL-5714-PRZV",
"name": "Portsmouth City Council"
},
"tender": {
"id": "P00005192",
"lots": [
{
"id": "1",
"title": "Lot 1a - Minor Coastal & Flood Civil Engineering Works",
"value": {
"amount": 6000000,
"currency": "GBP",
"amountGross": 7200000
},
"status": "active",
"renewal": {
"description": "The Framework contract will start as close to 1st March 2027 as possible and operate for an initial term of four years. \nProvision has been included for a framework extension of up to two years (taking the maximum framework duration to six years) to enable alignment with potential changes to the Environment Agency's funding programme and offers some resilience in the context of Local Government Reorganisation (LGR) and the potential for increased procurement demand in the early years of new authorities, but a need to continue to maintain sea defence assets.\nThe two-year extension provision was openly included in the PME documentation shared with users and the market and no objections or concerns were raised through feedback received."
},
"hasRenewal": true,
"description": "PURPOSE\nThis Lot will focus on smaller, non-complex works, such as maintenance and repairs, that will generally be local authority funded.\nCORE SCOPE\nThe following scope items are considered core to this Lot and will be tested at Framework level:\n•\tTimber structures, groynes & revetments \n•\tPrecast and insitu concrete works\n•\tRock works\n•\tEarth and flood embankments\n•\tFlood gates, boards and demountable defences\n•\tH&S issues and emergency works response\n•\tMarine, harbour, and river works\n•\tSlipways, promenades, steps and access ramps\nNON-CORE SCOPE\nThe following scope items can be called off via this Lot but may not have been sufficiently tested at Framework level:\n•\tDrainage infrastructure\n•\tHeritage works\n•\tIncidental beach management works\n•\tPiling works\n•\tEarly Contractor Involvement (ECI) \n•\tDesign responsibility \nVALUE\nTypical call-off value range\t£10k - £100k* \nMaximum contract value range\t£0k - £250k*\nOn occasion we may require works below £10k but these will be packaged up where possible. \nThere may also be occasional opportunities up to £250k where, for example, the works are non-complex but repetitive over a longer stretch of coast or repetitive over time.",
"identifiers": [
{
"id": "1a"
}
],
"secondStage": {
"maximumCandidates": 8,
"minimumCandidates": 4
},
"suitability": {
"sme": true
},
"awardCriteria": {
"criteria": [
{
"name": "Cost",
"type": "cost",
"numbers": [
{
"number": 20,
"weight": "percentageExact"
}
],
"description": "To be determined at tender stage, however the Cost element for each Lot will assess:\n•\tNEC4 fee percentages relevant to contract options applicable to each Lot, which could be multiple, that will be held for the Framework duration on a meet or beat basis\nNo rates will be set as part of the Framework."
},
{
"name": "Quality",
"type": "quality",
"numbers": [
{
"number": 80,
"weight": "percentageExact"
}
],
"description": "It is anticipated that the 80% quality weighting at the second stage will be divided as follows across two assessment areas: \n•\tTechnical Delivery (55%)\nTesting suppliers' approach to methodology, programme and resource against core scope requirements - achieved by using representative/typical hypothetical scenarios (and/or a live mini bid for Lot 2 but this is subject to final approvals); and\n•\tFramework Delivery (25%)\nTesting suppliers' approach and commitment to Framework delivery.\nHowever, these are subject to refinement of 5% in either direction on an overall cost/quality basis of 20/80 and would move proportionately if the overall tender cost/quality basis was to change up to 30/70.\nFull evaluation criteria will be defined upon the publication of the 2nd stage tender but will likely include the following themes and relative weightings for each of the quality assessment areas: \n•\tTechnical delivery - using 3 equally weighted scenarios \no\tMethodology (relative sub-weighting: 2)\no\tProgramme (relative sub-weighting: between 1 and 1.5)\no\tResource (relative sub-weighting: 1)\n•\tFramework delivery - across 5 equally weighted thematic areas\no\tFramework management\no\tQuality management\no\tSupplier Resilience\no\tSocial Value (including Sustainability)\no\tHealth & Safety"
}
]
},
"contractPeriod": {
"endDate": "2031-02-28T23:59:59Z",
"startDate": "2027-03-01T00:00:00Z",
"maxExtentDate": "2033-02-28T23:59:59Z"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "FINANCIAL CAPACITY\nFinancial capacity (from core supplier submission)\tPass/Fail\nConsortium/ Subcontracting\nWhere a consortium and / or sub-contracting is being significantly relied upon during the framework & to deliver the contracts, consortium members / sub-contractors must complete this Question and each achieve a Pass in respect of the Business Risk Assessment and combined Turnover of all parties must meet the criteria set out below. \nWhere a consortium and / or subcontractor is being relied upon to meet the financial capacity threshold, a direct contractual relationship in the form of a collateral warranty / Parent company Guarantee/ other contractual arrangement will be required as protection.\nBusiness Risk Assessment\nPass\nBusiness risk score calculated using Credit Safe financial ratios of 50 or above\nOr\nScore of 49 or less - subject to provision of a guarantee, from either a parent company, consortium member or a financial guarantor, provision subject to the guarantor financial institution achieving a business risk assessment score of 50 or above \nOr \nScore of 49 or less or where a Credit Safe score cannot be accurately obtained and/or no guarantor is available, satisfactory assessment of financial information provided against the following key factors: acid test, liquidity, retained profit, CCJ instances, bankruptcies, invoice payment performance\nFail: The response does not meet the criteria for a Pass.\nAND\nTurnover Assessment\nLatest turnover figures must be at least £500,000.\nIf Tenderers are unable to meet the minimum turnover levels but feel that they are able to demonstrate alternative evidence of financial capacity they are instructed to submit this asap via request for clarification in order that the Council may consider the information and provide a decision that will be final. \nWhere the contractor fails to meet the Turnover Assessment, Parent Company Guarantees may be considered where this allows them to meet the requirements. \nInsurance\tPass / Fail \nPlease confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:\n•\t£10M Public Liability each & every claim\n•\t£5M Employers Liability each & every claim\nNo Professional Indemnity is required although could be asked for at mini-competition stage if required for larger contracts."
},
{
"type": "technical",
"description": "RELEVANT EXPERIENCE and contract examples - Pass / Fail and scored - 100%\n(Refer to 'Criteria used to select suppliers to tender for this lot' section)\nHEALTH & SAFETY - Pass / Fail \n•\tSSIP Approved Contractor (Any member scheme)\n•\tHSE Enforcement / Remedial Orders\n•\tProsecution & Enforcement\n•\tHSE FFI Charges\nMODERN SLAVERY - Pass / Fail\nConfirmation that the bidder and any subcontractor they are relying on to satisfy the conditions of participation, is a 'relevant commercial organisation' and has a statement, policy, etc. in place that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request. \nOr\nConfirmation that the bidder is not a 'relevant commercial organisation' but still has OR can commit to having a statement, policy, etc. in place within 1 year of framework commencement, that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request.\nSUSTAINABILITY - Pass/Fail\nConfirmation that the Supplier has evidence of a sustainability policy (or equivalent)."
},
{
"description": "Relevant experience - Pass / Fail and scored - 100%\nA minimum of 4 and a maximum of 5 contract case studies relating to works completed or are currently being completed within the past 5 years must be submitted using the Contract Case Study template provided.\nEach Contract Case Study requires validation external to the Suppliers' organisation regarding the accuracy of information provided.\nMultiple case studies that apply to the same client organisation are permitted as long as each example relates to a discrete contract. \nThe case studies will firstly be assessed holistically and must demonstrate evidence of meeting the Minimum requirements stated in this section to pass.\nSuppliers that pass the minimum requirements will then have their case studies scored, in accordance with the scoring methodology set out in the COP document.\nExperience Elements - Lot 1A\nLot 1a Minimum Requirements (MR) - pass/fail\t\nMR1\tAt least 3 of the case studies must concern coastal works within a tidal area.\nMR2\tAt least 1 example of concrete repairs (examples could include but limited to spalled concrete or voiding)\t\nMR3\tAt least 1 example of sea defence timber repair (examples could range from plank replacement to new piles)\t\nMR4\tAt least 2 of the case studies must demonstrate experience delivering work packages with values ranging from £50,000 - £150,000. (If subcontracted as part of larger project, this value is for piece of work undertaken by your organisation)\nLot 1a Additional Experience (AE) - scored\t\nAE1\tEvidence of delivering rock works (for example rock gabions and placed rock armour)\nAE2\tEvidence of delivering flood embankments placing impermeable materials to fixed levels\nAE3\tEvidence of delivering flood gates, flood boards and demountable defences\nAE4\tEvidence of delivering emergency flood and erosion works response.\nAE5\tEvidence of delivering marine, harbour, and river works\nAE6\tEvidence of delivering slipways, promenades, coastal steps and ramps",
"forReduction": true
}
]
}
},
{
"id": "1b",
"title": "Lot 1b - General Coastal & Flood Civil Engineering Works",
"value": {
"amount": 30000000,
"currency": "GBP",
"amountGross": 36000000
},
"status": "active",
"renewal": {
"description": "The Framework contract will start as close to 1st March 2027 as possible and operate for an initial term of four years. \nProvision has been included for a framework extension of up to two years (taking the maximum framework duration to six years) to enable alignment with potential changes to the Environment Agency's funding programme and offers some resilience in the context of Local Government Reorganisation (LGR) and the potential for increased procurement demand in the early years of new authorities, but a need to continue to maintain sea defence assets.\nThe two-year extension provision was openly included in the PME documentation shared with users and the market and no objections or concerns were raised through feedback received."
},
"hasRenewal": true,
"description": "PURPOSE\nWorks under this Lot would generally be capitally funded projects, requiring the full suite of consents and approvals, and be notifiable under CDM. \nCall-offs under this Lot could include works such as:\n•\treplacement or significant repair of aging or damaged defences \n•\tconstruction of new defences.\nCORE SCOPE\nThe following scope items are considered core to this Lot and will be tested at Framework level:\n•\tTimber structures, groynes & revetments \n•\tPrecast and insitu concrete works \n•\tRock works \n•\tEarth and flood embankments\n•\tFlood gates, boards and demountable defences\n•\tH&S issues and emergency works response\n•\tMarine, harbour, and river works \n•\tSlipways, promenades, steps and access ramps\n•\tRealignment and habitat creation\n•\tHeritage works \n•\tPiling works \nNON-CORE SCOPE\nThe following scope items can be called off via this Lot but may not have been sufficiently tested at Framework level:\n•\tDrainage infrastructure\n•\tIncidental beach management works\n•\tNatural Flood Management \n•\tEarly Contractor Involvement (ECI) \n•\tDesign responsibility/Principal Designer \nVALUE\nTypical call-off value range \t£250k* - £5M \nMaximum contract value range\t£100k* up to £10M\nOn occasion works of a more complex nature but lower value may be required taking the contract below the typical value range of £250k.\n* Note for Lots 1a and 1b: For call-offs estimated between £100k - £250k, Lots 1a and 1b 'dovetail' into one another and Contracting Authorities have the flexibility to use either Lot at their discretion, based on the complexity and risks associated with the work scope.\nThere may also be occasional opportunities for contracts in excess of FTS threshold values if the Framework is deemed the best route to market for the requirement.",
"secondStage": {
"maximumCandidates": 8,
"minimumCandidates": 4
},
"suitability": {
"sme": true
},
"awardCriteria": {
"criteria": [
{
"name": "Cost",
"type": "cost",
"numbers": [
{
"number": 20,
"weight": "percentageExact"
}
],
"description": "To be determined at tender stage, however the Cost element for each Lot will assess:\n•\tNEC4 fee percentages relevant to contract options applicable to each Lot, which could be multiple, that will be held for the Framework duration on a meet or beat basis\nNo rates will be set as part of the Framework."
},
{
"name": "Quality",
"type": "quality",
"numbers": [
{
"number": 80,
"weight": "percentageExact"
}
],
"description": "It is anticipated that the 80% quality weighting at the second stage will be divided as follows across two assessment areas: \n•\tTechnical Delivery (55%)\nTesting suppliers' approach to methodology, programme and resource against core scope requirements - achieved by using representative/typical hypothetical scenarios (and/or a live mini bid for Lot 2 but this is subject to final approvals); and\n•\tFramework Delivery (25%)\nTesting suppliers' approach and commitment to Framework delivery.\nHowever, these are subject to refinement of 5% in either direction on an overall cost/quality basis of 20/80 and would move proportionately if the overall tender cost/quality basis was to change up to 30/70.\nFull evaluation criteria will be defined upon the publication of the 2nd stage tender but will likely include the following themes and relative weightings for each of the quality assessment areas: \n•\tTechnical delivery - using 3 equally weighted scenarios \no\tMethodology (relative sub-weighting: 2)\no\tProgramme (relative sub-weighting: between 1 and 1.5)\no\tResource (relative sub-weighting: 1)\n•\tFramework delivery - across 5 equally weighted thematic areas\no\tFramework management\no\tQuality management\no\tSupplier Resilience\no\tSocial Value (including Sustainability)\no\tHealth & Safety"
}
]
},
"contractPeriod": {
"endDate": "2031-02-28T23:59:59Z",
"startDate": "2027-03-01T00:00:00Z",
"maxExtentDate": "2033-02-28T23:59:59Z"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "FINANCIAL CAPACITY\nFinancial capacity (from core supplier submission)\tPass/Fail\nConsortium/ Subcontracting\nWhere a consortium and / or sub-contracting is being significantly relied upon during the framework & to deliver the contracts, consortium members / sub-contractors must complete this Question and each achieve a Pass in respect of the Business Risk Assessment and combined Turnover of all parties must meet the criteria set out below. \nWhere a consortium and / or subcontractor is being relied upon to meet the financial capacity threshold, a direct contractual relationship in the form of a collateral warranty / Parent company Guarantee/ other contractual arrangement will be required as protection.\nBusiness Risk Assessment\nPass\nBusiness risk score calculated using Credit Safe financial ratios of 50 or above\nOr\nScore of 49 or less - subject to provision of a guarantee, from either a parent company, consortium member or a financial guarantor, provision subject to the guarantor financial institution achieving a business risk assessment score of 50 or above \nOr \nScore of 49 or less or where a Credit Safe score cannot be accurately obtained and/or no guarantor is available, satisfactory assessment of financial information provided against the following key factors: acid test, liquidity, retained profit, CCJ instances, bankruptcies, invoice payment performance\nFail: The response does not meet the criteria for a Pass.\nAND\nTurnover Assessment\nLatest turnover figures must be at least £8m\nIf Tenderers are unable to meet the minimum turnover levels but feel that they are able to demonstrate alternative evidence of financial capacity they are instructed to submit this asap via request for clarification in order that the Council may consider the information and provide a decision that will be final. \nWhere the contractor fails to meet the Turnover Assessment, Parent Company Guarantees may be considered where this allows them to meet the requirements. \nInsurance\tPass / Fail \nPlease confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:\n•\t£10M Public Liability each & every claim\n•\t£5M Employers Liability each & every claim\n•\t£1m Professional Indemnity (Relating to claims or series of claims arising out of one event, which must be maintained for a period of 12 years after the defects period of the final works phase)"
},
{
"type": "technical",
"description": "RELEVANT EXPERIENCE and contract examples - Pass / Fail and scored - 100%\n(Refer to 'Criteria used to select suppliers to tender for this lot' section)\nHEALTH & SAFETY - Pass / Fail \n•\tSSIP Approved Contractor (Any member scheme)\n•\tHSE Enforcement / Remedial Orders\n•\tProsecution & Enforcement\n•\tHSE FFI Charges\nMODERN SLAVERY - Pass / Fail\nConfirmation that the bidder and any subcontractor they are relying on to satisfy the conditions of participation, is a 'relevant commercial organisation' and has a statement, policy, etc. in place that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request. \nOr\nConfirmation that the bidder is not a 'relevant commercial organisation' but still has OR can commit to having a statement, policy, etc. in place within 1 year of framework commencement, that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request.\nSUSTAINABILITY - Pass/Fail\nEvidence of ISO14001 (or equivalent) or working towards to have in place within 1 year of Framework start date.\nACCREDITATIONS - Pass/Fail\nEvidence of ISO9001 (or equivalent) or working towards to have in place within 1 year of Framework start date.\nABI performance bond - Info only\nWhilst not required to be held at Framework level, Suppliers on Lot 1b should be aware that an ABI Performance Bond of a value circa 10% of project value may be required for call-off contracts in excess of £5M. Any such requirement would be made clear in call-off documentation on a project specific basis."
},
{
"description": "Relevant experience - Pass / Fail and scored - 100%\nA minimum of 4 and a maximum of 5 contract case studies relating to works completed or are currently being completed within the past 5 years must be submitted using the Contract Case Study template provided.\nEach Contract Case Study requires validation external to the Suppliers' organisation regarding the accuracy of information provided.\nMultiple case studies that apply to the same client organisation are permitted as long as each example relates to a discrete contract. \nThe case studies will firstly be assessed holistically and must demonstrate evidence of meeting the Minimum requirements stated in this section to pass.\nSuppliers that pass the minimum requirements will then have their case studies scored, in accordance with the scoring methodology set out in the COP document.\nExperience Elements for LOT 1B\nLot 1b Minimum Requirements (MR) - pass/fail\nMR1 - At least 3 of the case studies must be within a tidal area. \nMR2 - At least 1 example of asset refurbishment and/or replacement (i.e. returning an asset to its design performance or replacing like for like) \nMR3 - At least 1 example of a new open coast defence asset - examples could include but not limited to a new sea wall, groyne fields or multiple structures \nMR4 - At least 1 example of an estuary or harbour works - examples could include port works, jetties, flood walls, outfalls \nMR5 - At least 1 example of using NEC4 ECC - any option. \nMR6 - At least 2 of the case studies must demonstrate experience delivering contracts as Principal Contractor, as defined in CDM 2015, with values ranging from £250,000 - £5,000,000. (If subcontracted as part of larger project, this value is for piece of work undertaken by your organisation) \nLot 1b Additional Experience (AE) - scored\nAE1 - Evidence of timber retaining for example, timber groynes & timber revetments \nAE2 - Evidence of precast and insitu concrete works to form seawalls or promenades \nAE3 - Evidence of delivering heavy graded rock armour work) \nAE4 - Evidence of delivering flood embankments placing impermeable materials to fixed levels \nAE5 - Evidence of delivering flood gates, flood boards and demountable defences \nAE6 - Evidence of delivering emergency flood and erosion works response and managing public safety \nAE7 - Evidence of delivering slipways, promenades, coastal steps and ramps \nAE8 - Evidence of realignment and habitat creation, where defences are removed to enable the sea to flood the land. \nAE9 - Evidence of Heritage works using approved conservation materials and methods. \nAE10 - Evidence of piling works, steel sheet or timber to provide a retaining structure.",
"forReduction": true
}
]
}
},
{
"id": "2",
"title": "Lot 2 - Specialist Beach Management Works",
"value": {
"amount": 6000000,
"currency": "GBP",
"amountGross": 7200000
},
"status": "active",
"renewal": {
"description": "The Framework contract will start as close to 1st March 2027 as possible and operate for an initial term of four years. \nProvision has been included for a framework extension of up to two years (taking the maximum framework duration to six years) to enable alignment with potential changes to the Environment Agency's funding programme and offers some resilience in the context of Local Government Reorganisation (LGR) and the potential for increased procurement demand in the early years of new authorities, but a need to continue to maintain sea defence assets.\nThe two-year extension provision was openly included in the PME documentation shared with users and the market and no objections or concerns were raised through feedback received."
},
"hasRenewal": true,
"description": "CORE SCOPE\nThe following scope items are considered core to this Lot and will be tested at Framework level:\n•\tBeach management works\n•\tExcavation, haulage, deposition, profiling and screening of beach material\n•\tGround works associated with flood and coastal risk management\n•\tH&S issues and emergency works response\n•\tLand based importing of suitable beach material from external sources\n•\tSlipways, promenades, steps and access ramps\nNON-CORE SCOPE\nThe following scope items can be called off via this Lot but may not have been sufficiently tested at Framework level:\n•\tIncidental general coastal & flood civil engineering works\n•\tDesign responsibility/Principal Designer \n•\tShore based support of marine based importing of material from external sources. \nVALUE\nTypical call-off value range and rationale\t£50k - £1M\nMaximum contract value range\t£0k - £5M",
"secondStage": {
"maximumCandidates": 8,
"minimumCandidates": 4
},
"suitability": {
"sme": true
},
"awardCriteria": {
"criteria": [
{
"name": "Cost",
"type": "cost",
"numbers": [
{
"number": 20,
"weight": "percentageExact"
}
],
"description": "To be determined at tender stage, however the Cost element for each Lot will assess:\n•\tNEC4 fee percentages relevant to contract options applicable to each Lot, which could be multiple, that will be held for the Framework duration on a meet or beat basis\n•\tContractual priced submission if live mini bid used \nNo rates will be set as part of the Framework.\nIt is currently subject to approvals if a live mini bid will be used at tender stage for Lot 2, but, if this is the case, it is likely that Lot 2 would be assessed on an overall cost/quality basis of 30/70 instead of 20/80 and not use any scenarios for qualitative assessment. Instead, the full quality weighting available for Technical Delivery would be used to assess quality of the live mini bid and the additional 10% allocated to cost would allow for assessment of a contractual price of the live mini bid alongside Framework fee percentages."
},
{
"name": "Quality",
"type": "quality",
"numbers": [
{
"number": 80,
"weight": "percentageExact"
}
],
"description": "It is anticipated that the 80% quality weighting at the second stage will be divided as follows across two assessment areas: \n•\tTechnical Delivery (55%)\nTesting suppliers' approach to methodology, programme and resource against core scope requirements - achieved by using representative/typical hypothetical scenarios (and/or a live mini bid for Lot 2 but this is subject to final approvals); and\n•\tFramework Delivery (25%)\nTesting suppliers' approach and commitment to Framework delivery.\nHowever, these are subject to refinement of 5% in either direction on an overall cost/quality basis of 20/80 and would move proportionately if the overall tender cost/quality basis was to change up to 30/70.\nFull evaluation criteria will be defined upon the publication of the 2nd stage tender but will likely include the following themes and relative weightings for each of the quality assessment areas: \n•\tTechnical delivery - using 3 equally weighted scenarios \no\tMethodology (relative sub-weighting: 2)\no\tProgramme (relative sub-weighting: between 1 and 1.5)\no\tResource (relative sub-weighting: 1)\n•\tFramework delivery - across 5 equally weighted thematic areas\no\tFramework management\no\tQuality management\no\tSupplier Resilience\no\tSocial Value (including Sustainability)\no\tHealth & Safety"
}
]
},
"contractPeriod": {
"endDate": "2031-02-28T23:59:59Z",
"startDate": "2027-03-01T00:00:00Z",
"maxExtentDate": "2033-02-28T23:59:59Z"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "FINANCIAL CAPACITY\nFinancial capacity (from core supplier submission)\tPass/Fail\nConsortium/ Subcontracting\nWhere a consortium and / or sub-contracting is being significantly relied upon during the framework & to deliver the contracts, consortium members / sub-contractors must complete this Question and each achieve a Pass in respect of the Business Risk Assessment and combined Turnover of all parties must meet the criteria set out below. \nWhere a consortium and / or subcontractor is being relied upon to meet the financial capacity threshold, a direct contractual relationship in the form of a collateral warranty / Parent company Guarantee/ other contractual arrangement will be required as protection.\nBusiness Risk Assessment\nPass\nBusiness risk score calculated using Credit Safe financial ratios of 50 or above\nOr\nScore of 49 or less - subject to provision of a guarantee, from either a parent company, consortium member or a financial guarantor, provision subject to the guarantor financial institution achieving a business risk assessment score of 50 or above \nOr \nScore of 49 or less or where a Credit Safe score cannot be accurately obtained and/or no guarantor is available, satisfactory assessment of financial information provided against the following key factors: acid test, liquidity, retained profit, CCJ instances, bankruptcies, invoice payment performance\nFail: The response does not meet the criteria for a Pass.\nAND\nTurnover Assessment\nLatest turnover figures must be at least £1,000,000.\nIf Tenderers are unable to meet the minimum turnover levels but feel that they are able to demonstrate alternative evidence of financial capacity they are instructed to submit this asap via request for clarification in order that the Council may consider the information and provide a decision that will be final. \nWhere the contractor fails to meet the Turnover Assessment, Parent Company Guarantees may be considered where this allows them to meet the requirements. \nInsurance\tPass / Fail \nPlease confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:\n•\t£10M Public Liability each & every claim\n•\t£5M Employers Liability each & every claim\nNo Professional Indemnity is required although could be asked for at mini-competition stage if required for larger contracts."
},
{
"type": "technical",
"description": "RELEVANT EXPERIENCE and contract examples - Pass / Fail and scored - 100%\n(Refer to 'Criteria used to select suppliers to tender for this lot' section)\nHEALTH & SAFETY - Pass / Fail \n•\tSSIP Approved Contractor (Any member scheme)\n•\tHSE Enforcement / Remedial Orders\n•\tProsecution & Enforcement\n•\tHSE FFI Charges\nMODERN SLAVERY - Pass / Fail\nConfirmation that the bidder and any subcontractor they are relying on to satisfy the conditions of participation, is a 'relevant commercial organisation' and has a statement, policy, etc. in place that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request. \nOr\nConfirmation that the bidder is not a 'relevant commercial organisation' but still has OR can commit to having a statement, policy, etc. in place within 1 year of framework commencement, that is compliant with Section 54 of the Modern Slavery Act 215, that can be provided upon request.\nSUSTAINABILITY - Pass/Fail\nConfirmation that the Supplier has evidence of a sustainability policy (or equivalent)."
},
{
"description": "Relevant experience - Pass / Fail and scored - 100%\nA minimum of 4 and a maximum of 5 contract case studies relating to works completed or are currently being completed within the past 5 years must be submitted using the Contract Case Study template provided.\nEach Contract Case Study requires validation external to the Suppliers' organisation regarding the accuracy of information provided.\nMultiple case studies that apply to the same client organisation are permitted as long as each example relates to a discrete contract. \nThe case studies will firstly be assessed holistically and must demonstrate evidence of meeting the Minimum requirements stated in this section to pass.\nSuppliers that pass the minimum requirements will then have their case studies scored, in accordance with the scoring methodology set out in the COP document.\nExperience Elements for LOT 2\nLot 2 Minimum Requirements (MR) - pass/fail\t\nMR1 - At least 2 case studies must be coastal works demonstrating working and planning within the tidal cycle and its constraints . \nMR2 - At least 1 example of movement and placement of insitu beach materials for flood and coastal protection purposes. \nMR3 - At least 1 example of coastal ancillary works -clearance of and/or maintaining access for; outfalls, slipways, promenades, access steps or access ramps. \nMR4 - At least 1 example of safe management of the public in and around works using large construction equipment. \nMR5 - At least 2 of the case studies must demonstrate experience delivering contracts as Principal Contractor, as defined in CDM 2015, with values ranging from £50,000-£500k. (If subcontracted as part of larger project, this value is for piece of work undertaken by your organisation) \nLot 2 Additional Experience (AE) - scored\t\nAE1 - Evidence of using NEC4 ECC/ESCS and/or TSC/TSSC - any option. \nAE2 - Evidence of excavation, haulage, deposition, profiling and screening of beach material for flood defence purposes. \nAE3 - Evidence of ground works associated with flood and coastal risk management \nAE4 - Evidence of undertaking emergency beach management works response to achieve a design beach profile - demonstrating ability to be agile and responding quickly and manage public safety. \nAE5 - Evidence of land-based importing of suitable beach material from external sources and transporting this to the beach face. \nAE6 - Evidence of delivering slipways, promenades, coastal steps and ramp beach clearance.",
"forReduction": true
}
]
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKJ21",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ22",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ27",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ28",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ3",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ4",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKK15",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45111200",
"scheme": "CPV",
"description": "Site preparation and clearance work"
},
{
"id": "45111210",
"scheme": "CPV",
"description": "Blasting and associated rock-removal work"
},
{
"id": "45111230",
"scheme": "CPV",
"description": "Ground-stabilisation work"
},
{
"id": "45111240",
"scheme": "CPV",
"description": "Ground-drainage work"
},
{
"id": "45111250",
"scheme": "CPV",
"description": "Ground investigation work"
},
{
"id": "45112100",
"scheme": "CPV",
"description": "Trench-digging work"
},
{
"id": "45112200",
"scheme": "CPV",
"description": "Soil-stripping work"
},
{
"id": "45112300",
"scheme": "CPV",
"description": "Infill and land-reclamation work"
},
{
"id": "45112360",
"scheme": "CPV",
"description": "Land rehabilitation work"
},
{
"id": "45112400",
"scheme": "CPV",
"description": "Excavating work"
},
{
"id": "45112500",
"scheme": "CPV",
"description": "Earthmoving work"
},
{
"id": "45112600",
"scheme": "CPV",
"description": "Cut and fill"
},
{
"id": "45112700",
"scheme": "CPV",
"description": "Landscaping work"
},
{
"id": "45120000",
"scheme": "CPV",
"description": "Test drilling and boring work"
},
{
"id": "45223500",
"scheme": "CPV",
"description": "Reinforced-concrete structures"
},
{
"id": "45232450",
"scheme": "CPV",
"description": "Drainage construction works"
},
{
"id": "45232451",
"scheme": "CPV",
"description": "Drainage and surface works"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233200",
"scheme": "CPV",
"description": "Various surface works"
},
{
"id": "45233253",
"scheme": "CPV",
"description": "Surface work for footpaths"
},
{
"id": "45243000",
"scheme": "CPV",
"description": "Coastal-defence works"
},
{
"id": "45246000",
"scheme": "CPV",
"description": "River regulation and flood control works"
},
{
"id": "45252124",
"scheme": "CPV",
"description": "Dredging and pumping works"
},
{
"id": "45252125",
"scheme": "CPV",
"description": "Rock-dumping work"
}
]
},
{
"id": "1b",
"relatedLot": "1b",
"deliveryAddresses": [
{
"region": "UKJ21",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ22",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ27",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ28",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ3",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ4",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKK15",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45111200",
"scheme": "CPV",
"description": "Site preparation and clearance work"
},
{
"id": "45111210",
"scheme": "CPV",
"description": "Blasting and associated rock-removal work"
},
{
"id": "45111230",
"scheme": "CPV",
"description": "Ground-stabilisation work"
},
{
"id": "45111240",
"scheme": "CPV",
"description": "Ground-drainage work"
},
{
"id": "45111250",
"scheme": "CPV",
"description": "Ground investigation work"
},
{
"id": "45112100",
"scheme": "CPV",
"description": "Trench-digging work"
},
{
"id": "45112200",
"scheme": "CPV",
"description": "Soil-stripping work"
},
{
"id": "45112300",
"scheme": "CPV",
"description": "Infill and land-reclamation work"
},
{
"id": "45112360",
"scheme": "CPV",
"description": "Land rehabilitation work"
},
{
"id": "45112400",
"scheme": "CPV",
"description": "Excavating work"
},
{
"id": "45112500",
"scheme": "CPV",
"description": "Earthmoving work"
},
{
"id": "45112600",
"scheme": "CPV",
"description": "Cut and fill"
},
{
"id": "45112700",
"scheme": "CPV",
"description": "Landscaping work"
},
{
"id": "45120000",
"scheme": "CPV",
"description": "Test drilling and boring work"
},
{
"id": "45223500",
"scheme": "CPV",
"description": "Reinforced-concrete structures"
},
{
"id": "45232450",
"scheme": "CPV",
"description": "Drainage construction works"
},
{
"id": "45232451",
"scheme": "CPV",
"description": "Drainage and surface works"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233200",
"scheme": "CPV",
"description": "Various surface works"
},
{
"id": "45233253",
"scheme": "CPV",
"description": "Surface work for footpaths"
},
{
"id": "45243000",
"scheme": "CPV",
"description": "Coastal-defence works"
},
{
"id": "45246000",
"scheme": "CPV",
"description": "River regulation and flood control works"
},
{
"id": "45252124",
"scheme": "CPV",
"description": "Dredging and pumping works"
},
{
"id": "45252125",
"scheme": "CPV",
"description": "Rock-dumping work"
}
]
},
{
"id": "2",
"relatedLot": "2",
"deliveryAddresses": [
{
"region": "UKJ21",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ22",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ27",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ28",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ3",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ4",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKK15",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45111200",
"scheme": "CPV",
"description": "Site preparation and clearance work"
},
{
"id": "45111210",
"scheme": "CPV",
"description": "Blasting and associated rock-removal work"
},
{
"id": "45111230",
"scheme": "CPV",
"description": "Ground-stabilisation work"
},
{
"id": "45111240",
"scheme": "CPV",
"description": "Ground-drainage work"
},
{
"id": "45111250",
"scheme": "CPV",
"description": "Ground investigation work"
},
{
"id": "45112100",
"scheme": "CPV",
"description": "Trench-digging work"
},
{
"id": "45112200",
"scheme": "CPV",
"description": "Soil-stripping work"
},
{
"id": "45112300",
"scheme": "CPV",
"description": "Infill and land-reclamation work"
},
{
"id": "45112360",
"scheme": "CPV",
"description": "Land rehabilitation work"
},
{
"id": "45112400",
"scheme": "CPV",
"description": "Excavating work"
},
{
"id": "45112500",
"scheme": "CPV",
"description": "Earthmoving work"
},
{
"id": "45112600",
"scheme": "CPV",
"description": "Cut and fill"
},
{
"id": "45112700",
"scheme": "CPV",
"description": "Landscaping work"
},
{
"id": "45120000",
"scheme": "CPV",
"description": "Test drilling and boring work"
},
{
"id": "45223500",
"scheme": "CPV",
"description": "Reinforced-concrete structures"
},
{
"id": "45232450",
"scheme": "CPV",
"description": "Drainage construction works"
},
{
"id": "45232451",
"scheme": "CPV",
"description": "Drainage and surface works"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233200",
"scheme": "CPV",
"description": "Various surface works"
},
{
"id": "45233253",
"scheme": "CPV",
"description": "Surface work for footpaths"
},
{
"id": "45243000",
"scheme": "CPV",
"description": "Coastal-defence works"
},
{
"id": "45246000",
"scheme": "CPV",
"description": "River regulation and flood control works"
},
{
"id": "45252124",
"scheme": "CPV",
"description": "Dredging and pumping works"
},
{
"id": "45252125",
"scheme": "CPV",
"description": "Rock-dumping work"
}
]
}
],
"title": "SCG / SCOPAC Coastal & Flood Works Framework 2027",
"value": {
"amount": 75000000,
"currency": "GBP",
"amountGross": 90000000
},
"status": "active",
"coveredBy": [
"GPA",
"CPTPP"
],
"documents": [
{
"id": "conflictOfInterest",
"description": "Not published",
"documentType": "conflictOfInterest"
},
{
"id": "064413-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/064413-2026",
"format": "text/html",
"noticeType": "UK4",
"description": "Tender notice on Find a Tender",
"documentType": "tenderNotice",
"datePublished": "2026-07-08T17:41:00+01:00"
}
],
"procedure": {
"features": "Portsmouth City Council, (the Council) has decided to utilise a two-stage Competitive Flexible Procedure to establish 3 lots under the framework, consisting of the following stages: \n• Stage 1 - a discrete Conditions of Participation stage to limit the number of suppliers to a maximum of 8 per lot.\n • Stage 2 - a Tendering Round with up to the top 6 suppliers being awarded a place on each lot of the framework (Up to 4 suppliers on tier 1, and 2 suppliers on tier 2).\nStage 1 - Conditions of Participation Stage This stage focuses on shortlisting suppliers that meet the necessary technical, financial, and operational capabilities required by the contract. It aims to reduce the number of bidders through consideration of meeting the conditions of participation and level of relevant experience and contract examples. \nIn the event that there are less than eight suppliers who meet the Conditions of Participation criteria for any Lot, the Council reserve the right to:\n•\tproceed to the second stage of the tender process for that Lot regardless, providing there are more than four qualifying suppliers; or\n•\tremove the impacted Lot from the Framework, if less than four qualifying suppliers, without impact on the remainder of the Lots progressing through the procurement process\nThe Council also reserves the right to determine the final number of contractors appointed to each Lot and the structure of tiering. This may include (but is not limited to) establishing a Lot without a Reserve Tier, where this is considered appropriate based on the number and quality of compliant tenders received. As a minimum for Framework viability, a Lot must contain a minimum of 2 Delivery Tier suppliers\nAny interested suppliers will need to register on the governments Central Digital Platform for the Council to review any potential grounds for exclusion and conduct a debarment check. \nThe Council will be required to undertake checks on any named subcontractor a supplier incorporates into their bid. If the subcontractor was to meet the exclusion grounds and/or be listed on the debarment list, then the Council will need to investigate this as part of any award decision. The Council may require a supplier to change the nominated sub contractor if they do not meet the exclusion grounds and/or listed on the debarment list.\nStage 2 - Invitation to Tender (ITT) The second stage, shortlisted suppliers are invited to submit detailed proposals, including price in line with the stated, delivery methodology. The Council are envisioning applying a cost/quality weighting of 20% cost/80% quality for the second stage tender evaluation. However, this split is indicative and the Council reserves its right to refine award criteria during the procurement procedure and to adopt a Cost/Quality split up to 30/70, which may differ between Lots. \nThe specific weightings for the proposed cost & quality criteria are to be detailed on issue of ITT, however will fall within the ranges stated within the Lot sections of this notice.\nThe Council are intending to follow the subsequent Procurement Programme:\nPSQ published via Intend\t 8th July 2026\nTender notice issued on fts 8th July 2026\nBidders Briefing 16th July 2026 @ 1pm \nPSQ return deadline\t 14th August 2026 @ 12 noon\nPSQ evaluations complete\t 21st September 2026 \nTender published via Intend\t 28th September 2026\nTender clarification deadline 10th November 2026 @ 12noon\nTender return deadline \t 20th November 2026 @ 12 noon\nIssue assessment summaries \t22nd January 2027\nContract Award notice on FTS 22nd January 2027\nEnd of standstill\t 3rd February 2027\nFramework Award\t 8th February 2027 \nFramework Start Date\t 1st March 2027\nBIDDERS BRIEFING\nA supplier briefing for Stage 1 will be held on Thursday 16th July at 1pm via Microsoft TEAMS. \nAttendance is not compulsory and not taking part will not preclude Suppliers from taking part in Stage 1 of the procurement exercise. \nTo assist with record keeping and enabling us to provide technical assistance on the day if required, please inform the Council by Wednesday 15th July 2026 at 5pm who will be attending using the correspondence function on Intend.\nLink to join the briefing is within the Conditions of Participation documentation."
},
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"recurrence": {
"dates": [
{
"startDate": "2032-08-28T23:59:59+01:00"
}
]
},
"techniques": {
"frameworkAgreement": {
"type": "open",
"method": "withAndWithoutReopeningCompetition",
"description": "MAMIMUM NUMBER OFSUPPLIERS AND TIERING \nMaximum Number of suppliers on the framework is 6 per lot, which if different suppliers are appointed onto each of the lots, may result in a maximum of 18 suppliers being allocated onto the framework in total. Refer to scope for fuller details.\nIdeally each Lot will consist of a Delivery Tier of 4 contractors and a Reserve Tier of 2 contractors. The definitions of which are:\n•\tDelivery Tier: the top 4 ranked contractors from framework tender stage who will deliver the framework under normal operating conditions.\n•\tReserve Tier: the 5th and 6th ranked contractors from framework tender stage that may be called upon in exceptional circumstances or moved up into the Delivery Tier in the event that a contractor is removed, or removes themselves, from the Delivery Tier on a permanent or temporary basis. This tier provides framework contingency only and will not be actively managed.\nHowever, the Council reserves the right, at its sole discretion, to determine the final number of contractors appointed to each Lot and the structure of tiering. This may include (but is not limited to) establishing a Lot without a Reserve Tier, where this is considered appropriate based on the number and quality of compliant tenders received.\nAs a minimum for Framework viability, a Lot must contain a minimum of 2 Delivery Tier suppliers.\nPRICING\nEach Lot will have NEC4 fee percentages set at Framework level on a meet or beat basis for the duration of the Framework for NEC4 contracts and payment options most likely to be used for that Lot. \nNo further rates such as prelims, material rates etc will apply at Framework level and all pricing at call-off stage will be managed via mini-competition. \nCALL OFF MECHANISMS\nMini competition\nThe default option for the Framework will be to use a mini-competition process to award a contract.\nFor a mini competition, Contracting Authorities would be required to produce and issue an Invitation to Bid document to all Suppliers named on the Lot (or Lots) appropriate to the work scope and value. \nEvaluation criteria will be applied on a project-by-project basis dependant on the nature of the works and the contracting strategy required and will not necessarily follow the same weightings as applied for establishing the Framework. \nFor mini-competitions, Contracting Authorities may choose to focus evaluation on cost only or include a mixture of cost and quality elements, as below:\n•\tCost Only or Cost Focused Bid - Project specific cost element makes up 80% - 100% of the evaluation. Quality elements may be asked for but assessed on a pass/fail basis or on a low weighting. This approach is most likely to be used on Lot 1a or possibly Lot 2 where the work scope is low value & low complexity.\n•\tCost and Quality Bid - Evaluation is split between project specific cost and quality elements (but not necessarily equally). \tEvaluation weightings are project specific and will likely differ from those used at Framework set-up. This approach will be used in most circumstances for Lots 1b and 2, and for more complex works Lot 1a where approaches to the work may significantly differ between Suppliers.\n•\tHigh Quality Focused Bid - Evaluation will focus on quality and experience. Application of the X22 Contracting Clause may apply. \nThe emphasis would be on building an integrated project delivery team, a design and build scheme or where a scheme is of high complexity or high quality. Likely to only be used for Lot 1b higher value longer term works.\nDirect Award options (all Lots)\nOn occasion, Direct Award options can be the most appropriate and/or economically advantageous route to market. Direct awards will predominantly be used for lower value shorter term emergency requirements, repeat work requirements, specialist works and award by ranking / rotation, etc. but could also be used for higher value longer term works, subject to legal diligence on objective justification and governance sign off. We are proposing to allow Direct Awards via the framework across all Lots under the following scenarios:\n - Urgent or emergency basis\n - Repeat Work Basis: Work development \n - Repeat Work Basis: Specialist work\nCALL-OFF FLEXIBILITIES \nFor call-offs estimated between £100k - £250k, it is proposed that Lots 1a and 1b 'dovetail' into one another and Contracting Authorities will have the flexibility to use either Lot at their sole discretion. The decision of which Lot to progress a call-off procedure with will mostly consider the complexity and risks associated with the work type/scope of the contract. Where appropriate an expression of interest may be used, however, a decision will result in the selection of one Lot and will progress a call-off with either Lot 1a OR Lot 1b and will not be a hybrid of the two.\nThe Framework will also likely allow for calls for competition using cross-Lot or cross-Tier features, mainly when the nature or value of the call-off was not tested at Framework set-up. It is not intended for this to be commonplace. In all instances an Expression of Interest and/or sifting brief would be used to establish a maximum shortlist of 4 suppliers to be invited to mini-competition.\nPERFORMANCE MANAGEMENT / KPIs\nThe detailed KPIs and scoring methodology will be set out within stage 2 tender documents. The KPIs will include for and develop upon the high-level structure set out below:\n• Time\n• Cost \n• Quality\n• Number of defects / Efficiency of managing defects identified \n• Communications, reporting & response\n• Health & Safety Management\n• Minimising Disruption, Site Logistics, Security & Access\n• Quality Management \n• Handover at Practical Completion\nThe Council will publish a Contract Performance Notice which summarises delivery performance against the finalised KPIs for any call off over £5m. \nThe Council will work in partnership with the appointed contractor and will review KPI performance with the contractor at regular intervals. The Council will seek to agree KPI scores with the contractor prior to issue of a Contract Performance Notice.\nIn the event of significant non-performance, such as significant persistent performance issues where reasonable opportunity has been provided to the contractor to address but has failed to do so, application of significant damages or other significant penalties,\ntermination (including partial termination) of the contract or the reaching of a settlement agreement between the parties, the Council will be required to issue a Performance Notice within 30 days of the breach in accordance with Section 71 of the Procurement Act 23.\nConsequences for performance will be detailed at tender stage but at high level will include for demotion to secondary tier, restriction of direct award opportunities, suspension from the framework agreement through to termination.",
"buyerCategories": "FRAMEWORK ACCESS\nThe Framework is being established primarily for use by SCG/SCOPAC member Contracting Authorities, which currently includes:\n• Bournemouth Christchurch and Poole (BCP) Council\n• Chichester District Council\n• Dorset Council\n• Eastleigh Borough Council\n• Fareham Borough Council\n• Gosport Borough Council\n• Hampshire County Council\n• Havant Borough Council\n• Isle of Wight Council\n• New Forest District Council\n• Portsmouth City Council\n• Southampton City Council\nThe framework will also be accessible to all Contracting Authorities within the Southern and Wessex Regional Flood and Coastal Committee's (Southern RFCC, Wessex RFCC), regardless of SCG/SCOPAC membership, which currently includes:\n• Hampshire\n• Dorset\n• West Sussex\n• East Sussex\n• Isle of Wight\n• Kent\n• Somerset\n• Wiltshire\nContracting Authorities under future iterations of SCG/SCOPAC membership and the Southern RFCC, will be able to access the Framework following changes as a result of LGR or other factors.",
"periodRationale": "The Framework contract will start as close to 1st March 2027 as possible and operate for an initial term of four years. \nProvision has been included for a framework extension of up to two years (taking the maximum framework duration to six years) to enable alignment with potential changes to the Environment Agency's funding programme and offers some resilience in the context of Local Government Reorganisation (LGR) and the potential for increased procurement demand in the early years of new authorities, but a need to continue to maintain sea defence assets.",
"maximumParticipants": 18,
"buyerLocationRestrictions": [
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ21"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ22"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ27"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ28"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ3"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKJ4"
]
}
},
{
"gazetteer": {
"scheme": "GB-ITL",
"identifiers": [
"UKK15"
]
}
}
]
},
"hasFrameworkAgreement": true
},
"awardPeriod": {
"endDate": "2027-01-22T23:59:59Z"
},
"description": "Portsmouth City Council ('the council') on behalf of the Southern Coastal Group (SCG) and SCOPAC (Standing Conference on Problem Associated with the Coast), is inviting expressions of interest from suitably qualified contractors for inclusion onto a multi-contractor Coastal & Flood Works Framework Agreement. This framework will replace the existing SCG Minor Works Framework that is due to expire on 30th November 2026.\nThe Council s aiming to commence the framework from March 2027 which will run for a period of four years, with an option to extend for a further 2 years in increments to be agreed. \nThe framework will comprise of 3 lots: \n•\tLot 1a - Minor Coastal Civil Engineering Works. \n•\tLot 1b - General Coastal Civil Engineering Works. \n•\tLot 2 - Specialist beach management. \nContractors may apply for any or all of the 3 lots. Each framework lot will be made up of a primary tier of up to 4 contractors and a secondary tier of up to 2 contractors. The secondary tier will primarily be used on a contingency resource basis. \nStage 1 Application is via submission of a completed Procurement Selection Questionnaire (PSQ) by 14th August 2026 @ 12:00. The council anticipates shortlisting 8 contractors for each Lot from assessment of the returned PSQ submissions, who will then be invited to tender.\nThe value of the framework across both lots is estimated to be in the region of £25M - £75m over six years. \nFrom previous spend, and future demand from SCG Members and with consideration of proposed EA General Works grant aid funding rule changes expected in April this year, we are estimating annual Framework usage and values to be the following, however there is no guarantee of this volume of work and actual volumes and spend may be higher or lower:\nLot 1a - Estimated 10-20 call offs p/a, totalling £500k - £1m p/a\nLot 1b - Estimated 5-10 call offs p/a, totalling £2m-£5m p/a\nLot 2 - Estimated 5-10 call offs p/a, totalling £500k-£1m p/a\nThe average value of works called off via the framework for each Lot by SCG and SCOPAC is likely to range from:\n•\tLot 1a: £10k - £100k\n•\tLot 1b: £250k - £5m \n•\tLot 2: £50k - £1m\nHowever, there may also be commissions below £100k and on occasion in excess of £5m. Although it is unlikely that very high or very low value work will be procured via the agreement no upper or lower value constraints shall apply. \nCONTRACT TERMS\nThe framework will be let using NEC4 Framework Contract with following call-off options as appropriate:\n•\tNEC4 ECC and ECSC\n•\tNEC4 TSC and TSSC\n•\tStandard Authority PO T&Cs for low value, low complex works.\nSCOPE\nRefer to individual Lot information section of notice for details.\nESTABLISHMENT PROJECTS\nFor lot 1a and lot 1b the framework will be establish based upon a scenario project(s). The Council may establish lot 2 upon either a scenario project(s) also OR a live project. This is to be confirmed at tender stage.\nLOCAL GOVERNMENT REVIEW\nAs part of the wider Local Government Review (LGR), the Council is required to actively engage in discussions with neighbouring authorities to explore potential opportunities for collaboration, shared service delivery, and governance alignment. While this engagement is ongoing, no formal decisions or agreements have been reached at this stage.\nUnder current LGR proposals, it is likely to require Portsmouth City Council to form a new Authority by merging with other neighbouring Authorities. For Portsmouth, this will result in a new Council being created to provide the same services to everyone in the city, whilst covering a larger area and have a different name. Effectively all the current council services in the area of the new council boundary would be merged to create a new Council.\nThe government has announced its decision on Local Government Reorganisation on Wednesday 25th March 2026 that Portsmouth City Council will become part of a larger unitary authority that will cover the areas of Gosport, Fareham and Havant, and include Newlands, Horndean, Clanfield and Rowlands Castle.\nThe new unitary authority vesting date will be on 1st April 2028. \nIn the event of reorganisation, contracts will include clauses that allow for the assignment of the contract to successor authorities. Any assignment clause is likely to state any contract may be assigned to any new authority that succeeds the original contracting authority.\nFor further details in respect of LGR for the Council see the following link -\nhttps://www.portsmouth.gov.uk/services/council-and-democracy/devolution-and-plans-for- local-government-reorganisation/\nFor wider LGR information please refer to this link to the government page: Local government reorganisation: Policy and programme updates - GOV.UK",
"riskDetails": "MODIFICATIONS\nIf a modification cannot be defined as non-substantial and / or below threshold, the Council may still make modifications to the contract, not exceeding 50% of the latest contract value per modification, in respect the following situations:\n• Where the modification was transparently and unambiguously allowed for within the contract \n• Materialisation of a published known risk \n• Urgency & the protection of life \n• Unforeseeable circumstances which could not have been reasonably foreseen by the Council \n• Additional goods, works & services which are a repetition of items already covered within the scope of the contract and only where a change of contractor would significantly impact compatibility and result in significant in duplication of costs.\nIn such instances the Council will issue a Contract Change Notice each time a modification is made and publish an updated redacted version of the contract within 90 days of the modification. The Council may decide to include for a voluntary 8 working day standstill period from issuing a Contract Change Notice to subsequent modification of the contract in order to mitigate risk of challenge, although it will be under no legal obligation to do so. \nKNOWN RISKS\nThe detailed known risk will be set out within the tender documents; however the Council has identified the following known risk areas which could materialise over the course of the procurement process for this framework of its subsequent call-off contracts, framework lifetime and delivery of call off contracts over £5m and may significantly impact programme, cost and scope of the contracts. \n•\tEnvironment Agency funding - impacting volume of work, framework value and programme.\n•\tLocal Government Reorganisation - impacting User base and contract duration.\n•\tUnforeseen Ground or Marine Conditions such as discovery of adverse ground, geotechnical, or unexploded ordnance (UXO) conditions could impact scope, programme and cost. \n•\tSevere Weather Events / tidal anomalies which cause damage to works, equipment, or incomplete coastal defences that could impact scope, programme and cost. \n•\tContaminated Land - Identification of contaminated land before or during works could impact scope, programme and cost.\n•\tCondition of existing assets - Issues with existing asset structure and foundations found during works could impact scope, programme and cost.\n•\tProximity of an occupied site - Restrictions on work activities in order to minimise disruption to neighbours and other stakeholder could impact programme & cost.\n•\tUnrecorded underground services - Issues with service connections found during works could impact scope, programme and cost.\n•\tDiscovery of protected species on site or identification of protected species before or during works could impact programme and cost. \n•\tDelays to gaining planning approval could impact upon the procurement programme, contract award date and works commencement dates. \n•\tDesign changes required to meet planning conditions could impact upon scope, programme and costs. \nIn accordance with Schedule 8 of the Procurement Act 23, the Council reserves the right to modify any call off contract from this framework, without initiating a new procurement procedure, should any of these risks materialise during the procurement process and/or delivery of the contract. Any such modification will be limited to addressing the consequences of the known risk and will not alter the overall nature of the contract. Where\napplicable and required a modification to the Tender Notice or a Contract Change Notice will be published in accordance with the requirements of the Procurement Act.",
"enquiryPeriod": {
"endDate": "2026-08-04T12:00:00+01:00"
},
"hasRecurrence": true,
"aboveThreshold": true,
"submissionTerms": {
"languages": [
"en"
],
"electronicSubmissionPolicy": "allowed"
},
"participationFees": [
{
"id": "ocds-h6vhtk-065365",
"type": [
"win"
],
"description": "A framework rebate fee of 0.5% will be charged to suppliers who are awarded call-off contracts estimated to be £100,000 or more in total lifetime value.\nThe flat rate of 0.5% will be based on the estimated Total of the Prices for ECC/ECSCs or Forecast Outturn Cost for TSC/TSSCs, with a maximum fee of £10,000 per call-off.",
"relativeValue": {
"proportion": 0.005,
"monetaryValue": "award"
}
}
],
"procurementMethod": "selective",
"mainProcurementCategory": "works",
"submissionMethodDetails": "https://in-tendhost.co.uk/portsmouthcc/aspx/Home\nSuppliers who are not already registered on the In-tend system will need to register their details in order to access the procurement documentation, raise clarification requests and\nreturn tender submissions.",
"procurementMethodDetails": "Competitive flexible procedure",
"expressionOfInterestDeadline": "2026-08-14T12:00:00+01:00"
},
"parties": [
{
"id": "GB-PPON-PCNL-5714-PRZV",
"name": "Portsmouth City Council",
"roles": [
"buyer"
],
"address": {
"region": "UKJ31",
"country": "GB",
"locality": "Portsmouth",
"postalCode": "PO1 2AL",
"countryName": "United Kingdom",
"streetAddress": "Civic Offices, Guildhall Square"
},
"details": {
"url": "https://www.portsmouth.gov.uk",
"classifications": [
{
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE",
"description": "Public authority - sub-central government"
}
]
},
"identifier": {
"id": "PCNL-5714-PRZV",
"scheme": "GB-PPON"
},
"contactPoint": {
"name": "Procurement Service",
"email": "procurement@portsmouthcc.gov.uk",
"telephone": "442392688235"
}
}
],
"language": "en",
"initiationType": "tender"
}13 Feb 2026 · 013201-2026 · planning
{
"id": "013201-2026",
"tag": [
"planning"
],
"date": "2026-02-13T00:38:50Z",
"ocid": "ocds-h6vhtk-065365",
"buyer": {
"id": "GB-PPON-PCNL-5714-PRZV",
"name": "Portsmouth City Council"
},
"tender": {
"id": "P00005192",
"lots": [
{
"id": "1",
"status": "planning",
"hasRenewal": true,
"suitability": {
"sme": true
},
"contractPeriod": {
"endDate": "2030-11-30T23:59:59Z",
"startDate": "2026-12-01T00:00:00Z",
"maxExtentDate": "2032-11-30T23:59:59Z"
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKJ21",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ22",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ27",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ28",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ3",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ4",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKK15",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKK2",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45111200",
"scheme": "CPV",
"description": "Site preparation and clearance work"
},
{
"id": "45111210",
"scheme": "CPV",
"description": "Blasting and associated rock-removal work"
},
{
"id": "45111230",
"scheme": "CPV",
"description": "Ground-stabilisation work"
},
{
"id": "45111240",
"scheme": "CPV",
"description": "Ground-drainage work"
},
{
"id": "45111250",
"scheme": "CPV",
"description": "Ground investigation work"
},
{
"id": "45112100",
"scheme": "CPV",
"description": "Trench-digging work"
},
{
"id": "45112200",
"scheme": "CPV",
"description": "Soil-stripping work"
},
{
"id": "45112300",
"scheme": "CPV",
"description": "Infill and land-reclamation work"
},
{
"id": "45112360",
"scheme": "CPV",
"description": "Land rehabilitation work"
},
{
"id": "45112400",
"scheme": "CPV",
"description": "Excavating work"
},
{
"id": "45112500",
"scheme": "CPV",
"description": "Earthmoving work"
},
{
"id": "45112600",
"scheme": "CPV",
"description": "Cut and fill"
},
{
"id": "45112700",
"scheme": "CPV",
"description": "Landscaping work"
},
{
"id": "45120000",
"scheme": "CPV",
"description": "Test drilling and boring work"
},
{
"id": "45223500",
"scheme": "CPV",
"description": "Reinforced-concrete structures"
},
{
"id": "45232450",
"scheme": "CPV",
"description": "Drainage construction works"
},
{
"id": "45232451",
"scheme": "CPV",
"description": "Drainage and surface works"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233200",
"scheme": "CPV",
"description": "Various surface works"
},
{
"id": "45233253",
"scheme": "CPV",
"description": "Surface work for footpaths"
},
{
"id": "45243000",
"scheme": "CPV",
"description": "Coastal-defence works"
},
{
"id": "45246000",
"scheme": "CPV",
"description": "River regulation and flood control works"
},
{
"id": "45252124",
"scheme": "CPV",
"description": "Dredging and pumping works"
},
{
"id": "45252125",
"scheme": "CPV",
"description": "Rock-dumping work"
}
]
}
],
"title": "Southern Coastal Group and SCOPAC - Coastal & Flood Works Framework - Preliminary Market Engagement",
"value": {
"amount": 75000000,
"currency": "GBP",
"amountGross": 90000000
},
"status": "planning",
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"techniques": {
"hasFrameworkAgreement": true
},
"description": "INTRODUCTION\nOn behalf of the Southern Coastal Group (SCG), Coastal Partners is seeking to establish a Coastal and Flood Works framework to be used primarily by SCG members. Portsmouth City Council (The 'Council') will be the host Authority for the Framework and has published this Preliminary Market Engagement (PME) Notice in accordance with the Procurement Act 2023. \nPrior to commencing the formal procurement process to establish the new framework agreement Coastal Partners are seeking input from the market on options for the scope, procurement, structure and operation of the agreement. This feedback will be used to inform the development of the final technical, procurement, contractual and commercial strategy. \nFRAMEWORK STRUCTURE & CALL OFF OPTIONS\nBroadly, the scope of the framework will be divided across two specialisms and divided into three Lots: \n•\tLot 1a - Minor Coastal & Flood Civil Engineering Works (~£10k-£100k call-offs)\n•\tLot 1b - General Coastal & Flood Civil Engineering Works (~£250k-£5M call-offs)\n•\tLot 2 - Specialist Beach Management Works (£50k - £1M call-offs)\n4 contractors will be appointed onto the primary tier with 2-4 appointed onto the secondary (reserve) tier for each of the proposed framework Lots. There is currently no intention to restrict the number of Lots suppliers will be able to bid for and be appointed onto.\nFor call-offs estimated between £100k - £250k, it is proposed that Lots 1a and 1b 'dovetail' into one another and Contracting Authorities have the flexibility to use either Lot at their discretion, based on the complexity and risks associated with the work scope. Where appropriate, an expression of interest may be used to help inform the decision or on occasion a sifting brief may be used to create a shortlist of suppliers from across both Lots for a maximum 1:4 mini competition bidding ratio.\nThe new framework agreement will commence no later 1st December 2026 and will run for an initial duration of 4 years. It is proposed that the framework agreement may then be extended by a further 2 years in increments to be agreed. The inclusion of extension options is to allow for alignment with future EA funding cycles in the event of significant changes and / or restructuring of SCG membership, requirements, accountable body status, etc. as a result of Local Government Reorganisation which could delay future re-procurement. \nThe framework agreement will be let using the NEC4 Framework Contract with the following contract form call-off available for use as appropriate:\n•\tNEC4 ECC and ECSC\n•\tNEC4 TSC and TSSC\n•\tStandard Authority PO T&Cs for low value, low complex works\nFixed NEC4 Fee tendered at framework establishment will apply to future call contracts on a meet or beat basis. Inclusion of additional regularly used labour and equipment rates is also being considered for Lots 1A and 2. Inclusion of rates for specialist work types are also being considered for Lot 1A. \nThe framework will allow for call off contracts to be awarded via mini-competition and direct award against a range of options.\nFor mini competition evaluation criteria will be applied on a project-by-project basis dependant on the nature of the works and the contracting strategy required. Contracting Authorities may choose to focus evaluation on cost only or include a mixture of cost and quality elements.\nDirect awards will predominantly be used for lower value shorter term emergency requirements, repeat work requirements, specialist works and award by ranking / rotation / application of framework rates, etc. but could also be used for higher value longer term works, subject to legal diligence on objective justification and governance sign off.\nLOT 1A MINOR COASTAL & FLOOD CIVIL ENGINEERING WORKS - SCOPE & OVERVIEW\nThis Lot will focus on smaller, non-complex works, such as maintenance and repairs, that will generally be local authority funded. The scope of works covered under this Lot will include for:\n•\tDrainage infrastructure.\n•\tEarth and flood embankments\n•\tFlood gates, boards and demountable defences. \n•\tHeritage works \n•\tH&S issues and emergency works response. \n•\tIncidental beach management works.\n•\tMarine, harbour, and river works\n•\tPiling works\n•\tPrecast and insitu concrete works \n•\tRock works\n•\tSlipways, promenades, steps and access ramps.\n•\tTimber structures, groynes & revetments \n•\tEarly Contractor Involvement (ECI)\n•\tDesign responsibility\nContracts with a value of up £250k may be let via this proposed Lot, although typical average contract values are anticipated to be between £10k - £100k. \nLOT 1B GENERAL COASTAL & FLOOD CIVIL ENGINEERING WORKS - SCOPE & OVERVIEW\nWorks under this Lot would generally be capitally funded projects, requiring the full suite of consents and approvals, and be notifiable under CDM. \nThe scope of works covered under this Lot will include for:\n•\tReplacement or significant repair of aging or damaged defences \n•\tConstruction of new defences\n•\tDrainage infrastructure.\n•\tEarth and flood embankments\n•\tRealignment and habitat creation\n•\tFlood gates, boards and demountable defences. \n•\tHeritage works \n•\tH&S issues and emergency works response. \n•\tIncidental beach management works.\n•\tMarine, harbour, and river works\n•\tNatural Flood Management\n•\tPiling works\n•\tPrecast and insitu concrete works \n•\tRock works\n•\tSlipways, promenades, steps and access ramps.\n•\tTimber structures, groynes & revetments \n•\tEarly Contractor Involvement (ECI)\n•\tDesign responsibility/Principal Designer if required\nContracts with a value of between £100k and £10M may be let via this proposed Lot, although typical average contract values are anticipated to be between £250k - £5M. The value and volume of contracts let via this Lot will depend on the availability and prioritisation of funding under the new EA criteria from April 2026.\nLOT 2 SPECIALIST BEACH MANAGEMENT WORKS - SCOPE & OVERVIEW\nThe scope of works covered under this Lot will include for:\n•\tBeach management works. \n•\tExcavation, haulage, deposition, profiling and screening of beach material.\n•\tGround works associated with flood and coastal risk management.\n•\tH&S issues and emergency works response. \n•\tIncidental general coastal & flood civil engineering works.\n•\tLand based importing of suitable beach material from external sources.\n•\tSlipways, promenades, steps and access ramps.\n•\tDesign responsibility/Principal Designer if required\nContracts with a value of up to £5M may be let via this proposed lot, although typical average contract values are anticipated to be between £50k - £1M. Local Authorities are being encouraged to adopt more term service contracts for beach management activities which may result in a lesser number of higher value contracts. \nFRAMEWORK ACCESS\nThe Framework is being established primarily for use by SCG/SCOPAC member Contracting Authorities, which currently includes:\n•\tBournemouth Christchurch and Poole (BCP) Council\n•\tChichester District Council\n•\tDorset Council\n•\tEastleigh Borough Council\n•\tFareham Borough Council\n•\tGosport Borough Council\n•\tHampshire County Council\n•\tHavant Borough Council\n•\tIsle of Wight Council\n•\tNew Forest District Council\n•\tPortsmouth City Council\n•\tSouthampton City Council\nThe framework, however, will also be accessible to all Contracting Authorities within the Southern and Wessex Regional Flood and Coastal Committee's (Southern RFCC, Wessex RFCC), regardless of SCG/SCOPAC membership, which currently includes:\n•\tHampshire\n•\tDorset\n•\tWest Sussex\n•\tEast Sussex\n•\tIsle of Wight\n•\tKent\n•\tSomerset\n•\tWiltshire\nThe framework will be worded so that Contracting Authorities under future iterations of SCG/SCOPAC membership and the Southern RFCC, will be able to access the Framework for its duration following changes as a result of Local Government Reorganisation or other factors.\nFRAMEWORK ESTIMATED DEMAND\nThe following demand and value estimates for each Lot have been taken from analysis of spend under the 2022-2026 Minor Works Framework, known needs from SCG Members and with consideration of EA funding rule changes expected in April this year:\n•\tLot 1A - Average of 10-20 call off contracts per annum / £500k - £1M total spend per annum\n•\tLot 1B - Average of 5 - 10 call off contracts per annum / £2M - £5M total spend per annum\n•\tLot 2 - Average of 5 - 10 call off contracts per annum / £500k - £1M total spend per annum\nOver the maximum 6 year term of the framework agreement spend could therefore equate to £42M. However, in order to account for year on year inflation, above estimate Lot 1B demand due to changes in EA funding allocation and wider use of the framework by Southern and Wessex RFCC members who are not currently members of SCG/SCOPAC an upper framework estimated value of £75M is likely to be stated within the subsequent Tender Notice. \nPROCUREMENT STRATEGY & PROGRAMME\nThe procurement process undertaken to let the framework agreement will either be on the basis of an Open Procedure or Competitive Flexible Procedure (CFP) procurement. Input and interest gained through the initial PME process will inform which procedure is adopted. \nIf Competitive Flexible Procedure is used it will be similar to the previous two stage Restricted Procedure as defined within the now superseded the Public Contracts Regulations (2015). \nThe programme for the PME process and subsequent formal procurement process - based upon adoption of a CFP process - is set out below: \n•\tIssue PME Notice - 12.02.26\n•\tPME Briefing (via Teams) - 26.02.26 @ 11:30\n•\tPME questionnaires return deadline - 20.03.26 17:00\n•\tIssue Tender Notice - 13.04.26\n•\tStage 1 / PSQ published via Intend - 13.04.26\n•\tStage 1 / PSQ return deadline - 15.05.26\n•\tStage 2 / ITT published via Intend - 15.06.26\n•\tStage 2 / Tender return deadline - 24.07.26\n•\tNotification of award / issue of assessment summaries - 04.09.26\n•\tIssue of Award Notice - 04.09.26\n•\tStandstill completion - 16.09.26 23:59\n•\tFramework commencement - 01.12.26",
"communication": {
"futureNoticeDate": "2026-04-13T23:59:59+01:00"
},
"aboveThreshold": true,
"mainProcurementCategory": "works"
},
"parties": [
{
"id": "GB-PPON-PCNL-5714-PRZV",
"name": "Portsmouth City Council",
"roles": [
"buyer"
],
"address": {
"region": "UKJ31",
"country": "GB",
"locality": "Portsmouth",
"postalCode": "PO1 2AL",
"countryName": "United Kingdom",
"streetAddress": "Civic Offices, Guildhall Square"
},
"details": {
"url": "https://www.portsmouth.gov.uk/",
"classifications": [
{
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE",
"description": "Public authority - sub-central government"
}
]
},
"identifier": {
"id": "PCNL-5714-PRZV",
"scheme": "GB-PPON"
},
"contactPoint": {
"name": "Procurement Service",
"email": "procurement@portsmouthcc.gov.uk",
"telephone": "+442392688235"
}
}
],
"language": "en",
"planning": {
"documents": [
{
"id": "013201-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/013201-2026",
"format": "text/html",
"noticeType": "UK2",
"description": "Preliminary market engagement notice on Find a Tender",
"documentType": "marketEngagementNotice",
"datePublished": "2026-02-13T00:38:50Z"
}
],
"milestones": [
{
"id": "engagement",
"type": "engagement",
"status": "scheduled",
"dueDate": "2026-03-20T23:59:59Z",
"description": "PME PROCESS ADMINISTRATION\nThe Council will administrate the preliminary market engagement process using its e-sourcing system In-Tend which will be used for:\n•\tAccess to and issue of PME information and documentation \n•\tClarification requests and response\n•\tPME Briefing delegate details submission\n•\tPME Questionnaire submission\n•\tIssue of PME considerations summary\nIn-tend is free to use and can be accessed via the following website address: \nhttps://in-tendhost.co.uk/portsmouthcc/aspx/home\nAny queries or requests for clarification about this Preliminary Market Engagement Process must be submitted via the 'correspondence' function on In-Tend. It is the responsibility of Organisations to monitor the system, which will issue automated email notifications to registered emails, for clarification responses, issue of further documents, etc. \nPME DOCUMENTATION\nThe following documents are accessible via the Council's e-sourcing system In-tend:\n•\tPME Brief\n•\tAppendix A - Previous Framework Demand\n•\tConflict of Interest Declaration Form\n•\tIn-tend Guidance\nBRIEFING EVENT\nInterested contractors are invited to attend an online briefing event on Thursday 26th February 2026 11:30 - 12:30 where Coastal Partners with support from the Council will provide a summary overview of the future framework options and provide guidance on completion of a PME feedback questionnaire. \nTo attend the Microsoft Teams meeting, contractors should use the Teams link included within the PME Brief document accessible via the Council's e-sourcing solution In-tend. Contractors should join 5-10 minutes before the start time to ensure a prompt start.\nContractors are not limited to the number of attendees, and all interested parties are encouraged to attend as it will present an opportunity to better understand the proposed framework opportunity. \nTo assist with record keeping and access to technical assistance on the day if required, contractors are asked to confirm by Wednesday 25th February 2026 at 5pm who will be attending from their organisation using the correspondence function on Intend, providing the following information:\n•\tAttendees' names, job titles and email addresses\n•\tWhich Lot(s) are of interest\n•\tSuggestions for Agenda\nThe suggested agenda is: \n•\tIntroductions (5 mins)\n•\tFramework Overview Presentation (40 mins)\n o\tThe opportunity\n o\tFramework structure and delivery\n o\tProcurement strategy\n o\tPME requirements\n•\tQuestion and answers (15 mins)\nAny questions and answers from the event will be recorded via a separate clarification log and will be published to Intend for all suppliers to access, unless deemed commercially sensitive. \nPlease note that the Microsoft Teams meeting will be recorded and subsequently made available as part of the PME pack via Intend. \nContractors should note that there is no obligation to take part in this exercise and that if they do not take part, it will not preclude them from any subsequent related procurement process. Suppliers engaging in the PME will not receive preferential treatment in any subsequent tender process, and this is in no way an indication of the selection of any organisation or a guarantee of future work.\nA summary of the PME feedback will be shared with all suppliers that participate in the questionnaire or events, for review prior to its publication with the subsequent procurement.\nPME QUESTIONNAIRE\nTo capture feedback from the market regarding the proposed framework, suppliers are asked to complete an online PME Questionnaire, which will be explained at the PME briefing and made available to contractors following the Teams meeting.\nInterested contractors will be requested to complete the questionnaire by Friday 20th March 2026 17:00.\nSuppliers will have the ability to submit the questionnaire past the deadline above; however, the Council may then not be able to use the information provided and subsequently take this into account as part of the options appraisal produced.\nPlease note that a Conflicts of Interest Declaration & Statement will be required from all Suppliers submitting a PME Questionnaire response, more details of which are given below.\nThe Council reserves the right (but is not obliged) to seek clarification of any aspect of a contractors PME questionnaire response, to ensure the Council fully understands the information being submitted to help inform the final options appraisal. \nAny queries or questions or clarifications regarding the procurement documentation or PME process must be made in writing using the project correspondence facility on the In-tend system.\nCONFLICTS ASSESSMENT \nThe Procurement Act 2023 requires the Council to identify and keep under review actual and potential conflicts of interest. The Council must also mitigate conflicts of interest and address circumstances which the Council considers are likely to cause a reasonable person to wrongly believe there to be a conflict or potential conflict of interest.\nTo meet conflict of interest obligations, the Council will include a section within the online PME questionnaire for Suppliers to complete. The questions that will be asked are provided as Appendix 1 - Conflicts of Interest Declaration & Statement for reference now and your advance consideration. \nPlease note that this is only required for suppliers submitting a PME questionnaire response and is not a requirement for suppliers only attending the PME briefing event."
}
]
},
"initiationType": "tender"
}