Ryton Gardens Laboratory Refurbishment
Construction work
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Coventry University: "Ryton Gardens Laboratory Refurbishment". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Coventry University | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Coventry University
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Coventry University. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 2 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityCoventry University | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published28 Jul 2022, 17:25 BST | Last source update28 Jul 2022, 17:25 BST | Recurring procurementNot published |
ClassificationConstruction work | ||
Delivery area | ||
OCIDocds-h6vhtk-035721 | ||
What is being bought
Coventry University seeks to engage with a supplier to deliver a project to refurbish their current CAWR Laboratory suite at Ryton within the CAWR building (Centre for Agriculture Water Resilience). This is a specific supply and installation project requiring a degree of bespoke design, particular specification, and project-service integration to existing infrastructure.
What changed
From the official release history
- Status changed to complete
28 Jul 2022, 17:25 BST - Official notice release published
28 Jul 2022, 17:25 BST - Buyer information updated
28 Jul 2022, 17:25 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedStatus not publishedPublished valueNot publishedCoventry University seeks to engage with a supplier to deliver a project to refurbish their current CAWR Laboratory suite at Ryton within the CAWR building (Centre for Agriculture Water Resilience). This is a specific supply and installation project requiring a degree of bespoke design, particular specification, and project-service integration to existing infrastructure. Due to the technical detail and nature of the project, as well as the frequent cycles of technology re-fresh in this field, the Estates Development team undertook a pre-market engagement for the past few months seeking professional advice and guidance to establish an understanding of the existing building and requirements of the project for the complete delivery of a highly innovative CAWR Laboratory being contained with the infrastructure of the existing building envelope. This high-level engagement made clear that one supplier: Overbury PLC, had a comprehensive understanding of the parameters of the project requirement, and have provided credible proposals in areas which needed to be developed further, having recently completed a refurbishment in an adjacent wing, utilising knowledge from lessons learned. The proposed works will also be compounded by the fact of the recently refurbished areas currently held with 12 months defect liability period, with materials and plants currently under warranty requiring alterations and extensions to services to cater for the new provisions. The project team has continued to undertake very significant pre-engagement activities with Overbury, including end-user workshops and focus groups, in order to develop the planned delivery of the technical solutions, defined within a number of constraints. This pre-engagement has required direct dialogue between Overbury PLC, the Faculty as end-users, and the project consultant team, in order to resolve questions about the interaction between the building's physical infrastructure and the installation of the Laboratory - e.g., the requirements for fume extract through the structure of the building, gas locations, and manifold pipe routes, together with drainage routes to holding pits, etc. The resulting proposed design solutions have been worked-up with Overbury PLC, which sits within the infrastructure and close proximity of the building space and its physical/ M&E and parameters installed as part of the recently completed adjacent works. The collaboration that we have established with Overbury PLC has brought a high degree of added value to the project, both in terms of the efficiency of the design proposal, which has been achieved because of their capability in design and supply of such systems; but also, the establishment of lines of communication and collaboration between them as the supplier, our estates project management team and the end user. The project is due to commence in September with a critical completion date in December to meet semester dates, with the potential for advanced material orders to meet the completion date, As a result of the above Overbury PLC are able to meet the needs of this project brief within the timeframe and provide the end-to-end solution and added value to this critical project.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
28 Jul 2022, 17:25 BST - Award active
Not published · Not published - Contract active
Signed 28 Jul 2022, 00:00 BST · £800,000
Commercial outcome and competition
Awards Overbury Plc Not published · Not published · active |
Contracts Contract £800,000 · signed 28 Jul 2022, 00:00 BST · active |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Coventry University
Contracting authority GB-COH-Coventry UniversityDocuments (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published
Planning and rationale
Planning budgetNot published |
No-engagement rationaleNot published |
Procedure rationaleCoventry University seeks to engage with a supplier to deliver a project to refurbish their current CAWR Laboratory suite at Ryton within the CAWR building (Centre for Agriculture Water Resilience). This is a specific supply and installation project requiring a degree of bespoke design, particular specification, and project-service integration to existing infrastructure.
Due to the technical detail and nature of the project, as well as the frequent cycles of technology re-fresh in this field, the Estates Development team undertook a pre-market engagement for the past few months seeking professional advice and guidance to establish an understanding of the existing building and requirements of the project for the complete delivery of a highly innovative CAWR Laboratory being contained with the infrastructure of the existing building envelope.
This high-level engagement made clear that one supplier: Overbury PLC, had a comprehensive understanding of the parameters of the project requirement, and have provided credible proposals in areas which needed to be developed further, having recently completed a refurbishment in an adjacent wing, utilising knowledge from lessons learned. The proposed works will also be compounded by the fact of the recently refurbished areas currently held with 12 months defect liability period, with materials and plants currently under warranty requiring alterations and extensions to services to cater for the new provisions.
The project team has continued to undertake very significant pre-engagement activities with Overbury, including end-user workshops and focus groups, in order to develop the planned delivery of the technical solutions, defined within a number of constraints. This pre-engagement has required direct dialogue between Overbury PLC, the Faculty as end-users, and the project consultant team, in order to resolve questions about the interaction between the building's physical infrastructure and the installation of the Laboratory - e.g., the requirements for fume extract through the structure of the building, gas locations, and manifold pipe routes, together with drainage routes to holding pits, etc.
The resulting proposed design solutions have been worked-up with Overbury PLC, which sits within the infrastructure and close proximity of the building space and its physical/ M&E and parameters installed as part of the recently completed adjacent works.
The collaboration that we have established with Overbury PLC has brought a high degree of added value to the project, both in terms of the efficiency of the design proposal, which has been achieved because of their capability in design and supply of such systems; but also, the establishment of lines of communication and collaboration between them as the supplier, our estates project management team and the end user.
The project is due to commence in September with a critical completion date in December to meet semester dates, with the potential for advanced material orders to meet the completion date,
As a result of the above Overbury PLC are able to meet the needs of this project brief within the timeframe and provide the end-to-end solution and added value to this critical project. |