Resurfacing, bridge and and infrastructure improvement work at Train Wood, Norwich
Authority: Norfolk County Council (Local council)
What is being bought
Published requirement descriptionThe requirement includes the removal and disposal of an existing timber footbridge and supply and Installation of a new 12m footbridge. Resurfacing of 900 metres of riverside walk in Type 1 Mot granite topped with fines and edged with timber boards. Removal and disposal of 6 old timber fishing platforms, supply and installation of six replacement fishing platforms and one canoe platform. Supply and Installation of 20 seats/benches.
Please note that these works are subject to Norfolk County Council receiving approval from the Environment Agency following their recent submission of a Flood Risk Activity Permit (FRAP). The contractor will be required to provide appropriate documentation (such as Construction Phase Plan, Risk Assessments and Method Statements) to Norfolk County Council to support the any discussion with the Environment Agency .
ALL pre-FRAP approval works will be paid to the contractor regardless of the FRAP outcome.
Please note the Pricing Schedule Part 1 Preliminary works will include all contractor support to Norfolk County Council and Environment Agency to secure the Flood Risk Activity Permit, and Part 2 all other costs including supply and installation of requested infrastructure.
Read the full description (1,455 more characters)
In respect of Local Government Reorganisation (“LGR”), on 7 September 2026 the government withdrew an earlier decision that it was minded to establish three unitary councils for Norfolk and announced a ‘rapid review’ of its LGR programme in respect of Norfolk and some other areas.
On 4 December 2025, the then Secretary of State for Local Government made a written statement [UIN HCWS1128] stating that the government intended to establish a Mayoral Strategic Authority for Norfolk and Suffolk as soon as possible, and that it was minded to hold inaugural mayoral elections in May 2028.
On 7 September 2026, the current Secretary of State said: “The Prime Minister is really clear that the Government’s ambition is to ensure that every area in England has, or is in the process of establishing, a strategic authority by the end of 2027, with strategic authorities in place everywhere by the end of 2028”.
Should LGR and/or devolution processes lead to unitary local government in Norfolk and/or to the establishment of a strategic authority covering Norfolk (i) the contract may be transferred, assigned or novated to any successor authority(ies) to the county council, or to any joint body incorporating or formed by any such successor and/or to any strategic authority; and/or (ii) the council or a successor authority or joint body may order services on behalf of other local authorities serving any area within Norfolk's current geographical boundaries.
CPV: Bench seats · Footbridge construction work · Surface work for footpaths · Waterside leisure facilities construction work
The lotProcurement structure
single lot · value publishedLot #1Lot 1PlannedRenewalPublished valueAED 0
- Value
- AED 0 exc. VAT · AED 0 inc. VAT
- Extensions
- The contract may be extended by up to 6 months at the Council's discretion.
Procedure terms & legal framework
From the official record- Procedure method
- Below threshold - open competition
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Planned procurement
- Procurement threshold
- Below threshold
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 23 Sept 2026, 09:59 BST
- Last source update
- 23 Sept 2026, 09:59 BST
- Authority reference
NCCT43518- Latest notice
- Planned procurement notice (UK3)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-077839
How it was run
- Submission deadline
- 24 Nov 2026, 23:59 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
Timeline
4 published dates · Europe/London- Planning notice published1 day ago23 Sept 2026, 09:59 BST
- Tender notice expectedin 27 days20 Oct 2026, 23:59 BST
- Submission deadlinein 62 days24 Nov 2026, 23:59 GMT
- Contract startsin 130 days1 Feb 2027, 00:00 GMT
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Notice history
1 event · 1 release on Find a Tender- Planned procurement notice published23 Sept 2026, 09:59 BSTUK3
Contracting authority & participating public bodies
Official documents & specifications (1)
Official links; attachments are not copiedNotices published for this procedure
- Planned procurement notice Planned procurement notice on Find a Tender